| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-Finance V P O LOTE TEHSIL DISTT LAHAUL DISTT LAHAUL SPITI H P 175133 | LAHUL AND SPITI | HIMACHAL PRADESH | 175133 | ₹2.7 Cr | L1 | Accepted-Finance Lowest |
| 2 | L2₹2.9 Cr+₹15.6 L (5.79%)Rejected-Finance | ₹2.9 Cr+₹15.6 L (5.79%) | L2 | Rejected-Finance Highest Amount |
| 3 | L3₹2.9 Cr+₹23.3 L (8.66%)Rejected-Finance NO 1 HPPWD DIVISION DHARAMSHALA HIMACHAL PRADESH | KANGRA | HIMACHAL PRADESH | 176001 | ₹2.9 Cr+₹23.3 L (8.66%) | L3 | Rejected-Finance Highest Amount |
| 4 | L4₹3.1 Cr+₹43.4 L (16.1%)Rejected-Finance | ₹3.1 Cr+₹43.4 L (16.1%) | L4 | Rejected-Finance Highest Amount |
| 5 | L5₹3.2 Cr+₹47.9 L (17.8%)Rejected-Finance NOT AVAILABLE | FARIDABAD | HARYANA | 121004 | ₹3.2 Cr+₹47.9 L (17.8%) | L5 | Rejected-Finance Highest Amount |
| Sl No | Description | Qty | Unit | gagan ohri L7 | KAILASH DEWAN L4 | Dogra Construction Company Pvt Ltd L6 | YOG RAJ L5 | Shadil Thakur L3 | Saurabh Vasudeva L2 | BDSconstruction L8 | krishan chand L9 | JOGINDER SINGH L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation and trenches (for pipes and pits) up to all depths and in all clasification of soil work such as pick Work, jumper work, chiselling or Wedging out of soft and hard rock where the blasting work is prohibited saturated soil including pumping or bailing out water in all lifts including trimming and dressng of sides, levelling of beds to correct grade including shoring strutting planking timbering and dewatering where ever required. Stacking usable and unusable matrial/soil separetaly and after laying, jointing and testing of pipes (for pipes, pipe duct, chambers, x-signs etc.) returning the usable soil in 15 cm layers by ramming and wetering and then desposing of all surlus excavated soil/un usable material as directed wirhin all leads/lifts includng restoration of unmetalled surfaces to its original conditionn and includng cost of divresion for traffic, night signal boards, fixing custion boards, crossing over tranches for access to houses, fencing etc. complete in all respect as per the direction and to be entire of Engineer-in-Charge within all leads and lifts. (Pick work & jumper work) | 3,131.03 | Cum | 280 ₹8,76,688.4 | 105 ₹3,28,758.15 Lowest | 500 ₹15,65,515 | 150 ₹4,69,654.5 | 375 ₹11,74,136.25 | 380 ₹11,89,791.4 | 475 ₹14,87,239.25 | 375 ₹11,74,136.25 | 150 ₹4,69,654.5 |
| 2.00 | Dressing of bed and preparation of sub grade for CC lining in pick work complete in all respect including all leads and Lifts as per the direction and satisfaction of Engineer-In-Charge. | 5,925.5 | Sqm | 40 ₹2,37,020 | 85 ₹5,03,667.5 | 70 ₹4,14,785 | 35 ₹2,07,392.5 | 50 ₹2,96,275 | 45 ₹2,66,647.5 | 56 ₹3,31,828 | 50 ₹2,96,275 | 20 ₹1,18,510 Lowest |
| 3.00 | Dressing of side slopes verrtical and preparation of sub grade for CC lining in pick work complete in all respect including all leads and Lifts as per the direction and satisfaction of Engineer-In-Charge. | 10,742 | Sqm | 70 ₹7,51,940 | 110 ₹11,81,620 | 91 ₹9,77,522 | 45 ₹4,83,390 | 50 ₹5,37,100 | 55 ₹5,90,810 | 90.7 ₹9,74,299.4 | 65 ₹6,98,230 | 20 ₹2,14,840 Lowest |
| 4.00 | Providing and Laying cement concrete 1:4:8 (1cement:4 sand:8 graded stone aggregate 40mm nominal size) and curring complete excluding cost of form work in foundation and plinth complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge. | 597.27 | Cum | 7,500 ₹44,79,525 | 6,500 ₹38,82,255 | 7,800 ₹46,58,706 | 4,500 ₹26,87,715 Lowest | 5,200 ₹31,05,804 | 5,300 ₹31,65,531 | 8,575 ₹51,21,590.25 | 7,500 ₹44,79,525 | 5,900 ₹35,23,893 |
| 5.00Providing form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden batterns and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in-situ-reinforced concrete and plain concrete work in:- | ||||||||||||
| 5.01 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters buttresses, plinth and string courses and the like complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge. | 225.6 | Sqm | 160 ₹36,096 Lowest | 440 ₹99,264 | 350 ₹78,960 | 250 ₹56,400 | 350 ₹78,960 | 380 ₹85,728 | 375 ₹84,600 | 350 ₹78,960 | 200 ₹45,120 |
| 5.02 | Form work for duct linning kuhl:- Vertical surfaces such as walls of ducts (any thickness) partitions and the like including attached pillasters buttresses, plinth and string courses and the like complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge. | 17,602.5 | Sqm | 160 ₹28,16,400 | 85 ₹14,96,212.5 | 70 ₹12,32,175 | 75 ₹13,20,187.5 | 100 ₹17,60,250 | 85 ₹14,96,212.5 | 80.7 ₹14,20,521.75 | 260 ₹45,76,650 | 40 ₹7,04,100 Lowest |
| 6.00 | Providing and laying cement concrete work 1:3:6 (1cement:3 sand: 6graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work concrete work in foundation and plinth complete in all respect including all leads and Lifts as per the direction and to be entire satisfection of Engineer-In-Charge. | 1 | Cum | 9,400 ₹9,400 | 9,580 ₹9,580 | 7,480 ₹7,480 | 7,100 ₹7,100 | 6,800 ₹6,800 | 7,500 ₹7,500 | 9,070 ₹9,070 | 6,000 ₹6,000 Lowest | 6,000 ₹6,000 Lowest |
| 7.00Providing and Laying cement concrete 1:2:4 (1 Cement:2 Sand:4 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:- | ||||||||||||
| 7.01 | Foundations, footings bases of columns and the like and mass concrete complete in all respect as per direction and to the entire satisfation of Engineer- in- charge up to leads and lifts. | 729.76 | Cum | 8,700 ₹63,48,912 | 8,000 ₹58,38,080 | 8,700 ₹63,48,912 | 9,500 ₹69,32,720 | 7,100 ₹51,81,296 | 6,990 ₹51,01,022.4 Lowest | 9,890 ₹72,17,326.4 | 9,500 ₹69,32,720 | 7,400 ₹54,00,224 |
Tender Value
₹4.1 Cr
EMD Value
₹4.9 L
Closing Date
5 Aug 2026, 11:00 amClosed
Er. Vivek Thakur EE
JSV Division Nagrota Bagwan
Construction of LIS to GP Sihoond and Baldhar in Tehsil Nagrota BagwanSH_Construction of RCC Main Channel
2026_HPIPH_139742_1
EE/JSV/NBD/5208-32 dt.23.07.26
Open Tender
Civil Works
Item Rate
730 days
Nagrota Bagwan
Please refer Tender documents.
11 documents required · 11 mandatory
₹7,000
EE JSV Nagrota Bagwan
₹4.9 L
The SE JSV Circle D/Shala
22 Aug 2026
23 Jul 2026
5 Aug 2026
23 Jul 2026
5 Aug 2026
23 Jul 2026
29 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation and trenches (for pipes and pits) up to all depths and in all clasification of soil work such as pick Work, jumper work, chiselling or Wedging out of soft and hard rock where the blasting work is prohibited saturated soil including pumping or bailing out water in all lifts including trimming and dressng of sides, levelling of beds to correct grade including shoring strutting planking timbering and dewatering where ever required. Stacking usable and unusable matrial/soil separetaly and after laying, jointing and testing of pipes (for pipes, pipe duct, chambers, x-signs etc.) returning the usable soil in 15 cm layers by ramming and wetering and then desposing of all surlus excavated soil/un usable material as directed wirhin all leads/lifts includng restoration of unmetalled surfaces to its original conditionn and includng cost of divresion for traffic, night signal boards, fixing custion boards, crossing over tranches for access to houses, fencing etc. complete in all respect as per the direction and to be entire of Engineer-in-Charge within all leads and lifts. (Pick work & jumper work) | 3,131.03 | Cum | - | - |
| 2 | Dressing of bed and preparation of sub grade for CC lining in pick work complete in all respect including all leads and Lifts as per the direction and satisfaction of Engineer-In-Charge. | 5,925.5 | Sqm | - | - |
| 3 | Dressing of side slopes verrtical and preparation of sub grade for CC lining in pick work complete in all respect including all leads and Lifts as per the direction and satisfaction of Engineer-In-Charge. | 10,742 | Sqm | - | - |
| 4 | Providing and Laying cement concrete 1:4:8 (1cement:4 sand:8 graded stone aggregate 40mm nominal size) and curring complete excluding cost of form work in foundation and plinth complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge. | 597.27 | Cum | - | - |
| 5Providing form work with steel plates 3.15 mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centring, shuttering, strutting and propping etc. with wooden batterns and ballies, height of propping and centring below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in-situ-reinforced concrete and plain concrete work in:- | |||||
| 5.01 | Vertical surfaces such as walls (any thickness) partitions and the like including attached pillasters buttresses, plinth and string courses and the like complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge. | 225.6 | Sqm | - | - |
| 5.02 | Form work for duct linning kuhl:- Vertical surfaces such as walls of ducts (any thickness) partitions and the like including attached pillasters buttresses, plinth and string courses and the like complete in all respect including all leads and Lifts as per the direction and to the entire satisfection of Engineer-In-Charge. | 17,602.5 | Sqm | - | - |
| 6 | Providing and laying cement concrete work 1:3:6 (1cement:3 sand: 6graded stone aggregate 20mm nominal size) and curing complete excluding cost of form work concrete work in foundation and plinth complete in all respect including all leads and Lifts as per the direction and to be entire satisfection of Engineer-In-Charge. | 1 | Cum | - | - |
| 7Providing and Laying cement concrete 1:2:4 (1 Cement:2 Sand:4 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in:- | |||||
| 7.01 | Foundations, footings bases of columns and the like and mass concrete complete in all respect as per direction and to the entire satisfation of Engineer- in- charge up to leads and lifts. | 729.76 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Form6.pdf
Tender Documents • 0.20 MB
Form8.pdf
Tender Documents • 0.91 MB
Termsandcond.pdf
Tender Documents • 0.21 MB
BOQ_207151.xls
BOQ • 0.29 MB
PrebidMeetting.pdf
PDF • 1.40 MB
Corrigendum.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .