Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC 403 4TH FLOOR PARK CENTRA NH 8 SECTOR 30 GURGAON HARYANA 122001 | GURUGRAM | HARYANA | 122001 | L1 | Accepted-AOC Lowest Bidder | |
| 2 | L2₹5.1 L+₹1.1 L (25.9%)Rejected-Finance | L2 | Rejected-Finance Highest Bidder | |
| 3 | L3₹6.1 L+₹2.1 L (51.1%)Rejected-Finance | L3 | Rejected-Finance Highest Bidder | |
| 4 | L4₹15 L+₹10.9 L (270.4%)Rejected-Finance | L4 | Rejected-Finance Highest Bidder |
| Sl No | Description | Qty | Unit | Oms Infra Consultants Pvt. Ltd. L4 | civilbaba infra consultant pvt ltd L3 | Voyants Solutions Private Limited L1 | TTL ENGINEERING PVT.LTD. L2 |
|---|---|---|---|---|---|---|---|
| 1.00Consultancy Services | |||||||
| 1.01 | Pre-Bid Engineering Services for the work of,
Four/Six Laning of Bodhre to Dhule section from km 390.000 to km 457.231(Design Chainage) of NH-211 (New NH-52) (Design Length – 67.231 km) in the State of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity Mode. | 1 | Lump Sum | 15,00,000 ₹15,00,000 | 6,12,000 ₹6,12,000 | 4,05,000 ₹4,05,000 Lowest | 5,10,000 ₹5,10,000 |
Tender Value
Refer Docs
EMD Value
₹12,629
Closing Date
12 Nov 2020, 3:00 pmClosed
Chief General Manager/Business Development
C-4, District Centre, Saket, New Delhi, PIN 110017
Pre-Bid Engineering Services for the work of Four Six Laning of Bodhre to Dhule section from km 390.000 to km 457.231(Design Chainage) of NH-211 (New NH-52) (Design Length of 67.231 km) in the State of Maharashtra under Bharatmala Pariyojana on HAM
2020_IRCON_61401_1
IRCON/BD/2020/T/H/N/NH-52/D
Limited
Consultancy
Lump-sum
20 days
New Delhi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹12,629
Yes
23 Sept 2022
4 Nov 2020
13 Nov 2020
4 Nov 2020
12 Nov 2020
6 Nov 2020
Amount
Consultancy Services
Pre-Bid Engineering Services for the work of, Four/Six Laning of Bodhre to Dhule section from km 390.000 to km 457.231(Design Chainage) of NH-211 (New NH-52) (Design Length – 67.231 km) in the State of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity Mode.
TTL ENGINEERING PVT.LTD.
civilbaba infra consultant pvt ltd
Oms Infra Consultants Pvt. Ltd.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .