| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹43.4 LAccepted-AOC | ₹43.4 L | L1 | Accepted-AOC Accept |
| 2 | L2₹43.5 LRejected-Finance | ₹43.5 L | L2 | Rejected-Finance Reject |
| Sl No | Description | Qty | Unit | SMS CONSTRUCTION L1 | PRANAV TRADERS L2 |
|---|---|---|---|---|---|
| 1.00Name of the Work : Upgradation the Road From Kalliparappu to Thirupur Dt. Boundary (via) Vandaripalayam (R-432) (Kalliparappu to Subbrayan house) Km 0/0 to 1/00 H/O Kodanthur Pt | |||||
| 2.00 | Clearingthe Scrub jungle including all labour charges for burrying and buming etc. | 792 | m2 | 6.16 ₹4,878.72 | 7.06 ₹5,591.52 |
| 3.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete, as per SS20 A | 118.8 | m3 | 140.25 ₹16,661.70 | 141.15 ₹16,768.62 |
| 4.00 | Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc. complete. | 89.1 | m3 | 340.82 ₹30,367.06 | 341.72 ₹30,447.25 |
| 5.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal 65% 4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%) & (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rolovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix in place method) | 407.98 | m3 | 2,418.87 ₹9.9 L | 2,419.77 ₹9.9 L |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 472.65 | m3 | 2,382.72 ₹11.3 L | 2,383.62 ₹11.3 L |
| 7.00 | Providing and laying of Prime coat over the BT Surface using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 3,781.25 | m2 | 87.19 ₹3.3 L | 88.09 ₹3.3 L |
| 8.00 | Providing and laying of Tack coat over the BT Surface using Emulsion at the rate of 2.5kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 3,781.25 | m2 | 20.35 ₹76,948.44 | 21.25 ₹80,351.56 |
| 9.00 | Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc... including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-301 CMP with bitumen boiler, tipper trucks.paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 94.53 | m3 | 11,681.59 ₹11.0 L | 11,682.49 ₹11.0 L |
| 10.00 | HM Stone (650X150X100mm) | 4 | Nos | 574.45 ₹2,297.80 | 575.35 ₹2,301.40 |
Tender Value
Refer Docs
EMD Value
₹43,890
Closing Date
4 Mar 2026, 3:00 pmClosed
Special Officer/BDO(V.Pt), K.Paramathi
Special Officer/BDO(V.Pt), K.Paramathi
Upgradation the Road From Kalliparappu to Thirupur Dt. Boundary (via) Vandaripalayam (R-432) (Kalliparappu to Subbrayan house) Kodanthur Pt
2026_RDTN_665299_1
Upgradation the Road From Kalliparappu to Thirupur Dt. Boundary (via) Vandaripalayam (R-432)
Open Tender
Civil Works - Others
180 days
Kodanthur Panchayat
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹43,890
Yes
12 Mar 2026
24 Feb 2026
4 Mar 2026
24 Feb 2026
4 Mar 2026
24 Feb 2026
Name of the Work : Upgradation the Road From Kalliparappu to Thirupur Dt. Boundary (via) Vandaripalayam (R-432) (Kalliparappu to Subbrayan house) Km 0/0 to 1/00 H/O Kodanthur Pt
Clearingthe Scrub jungle including all labour charges for burrying and buming etc.
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete, as per SS20 A
Providing and Laying Gravel Soling to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller, water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc. complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal 65% 4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%) & (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rolovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix in place method)
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam (WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of Prime coat over the BT Surface using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying of Tack coat over the BT Surface using Emulsion at the rate of 2.5kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc... including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-301 CMP with bitumen boiler, tipper trucks.paver finisher/9m paver finisher, vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
HM Stone (650X150X100mm)
KM Stone 1260X350X250mm)
GST Amount for providing Service to Government Contract Works for the above ConstructionWorks. GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.30 MB
BOQ_799028.xls
BOQ • 0.52 MB
Download all tender documents and submit your bid