Tender Value
₹4.9 L
EMD Value
₹10,000
Closing Date
31 Aug 2026, 1:00 pm7d left
EE/IGWTP
OFFICE OF THE EE/IGWTP, BARRACKPORE, MONIRAMPUR
RENOVATION OF THE ALUM VAT NO 1 AT 100 MGD CLARIFIER PLANT,IGWTP.
2026_KMC_1038720_1
KMC/ IGWTP/037/26-27, DT-14/08/2026
Open Tender
CIVIL WORKS
Percentage
30 days
IGWTP, MONIRAMPUR, BARRACKPORE
AS PER NIT
4 documents required · 4 mandatory
₹0
₹10,000
OFFICE OF THE EE/IGWTP, BARRACKPORE
19 Aug 2026
19 Aug 2026
2 Sept 2026
20 Aug 2026
31 Aug 2026
24 Aug 2026
21 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | PART-A | - | - | - | - |
| 1 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc B. CONCRETE WORKS 3. Making one set of scaffolding only for replacing glass panels, painting, uprooting plant and another repairing works of building and S&P works for external works only with 10 cm. dia bamboo as main posts at the rate of 1 metre centre to centre and 7.5 cm. dia bamboo ties @ 0.75 metre apart fitting and fixing with necessary coir, nails etc. as per direction of the Engineer-incharge. (This item should be executed only after prior approval of the Engineer-incharge). Firstly, one number to be paid and then labour rate for shifting up to further nineteenth (19) times @ 10% each time to be considered. If necessary further after twenty times of total use, another one number new and labour rate for shifting to be considered accordingly b) Extra for additional 3.6 height or part thereof | 3 | EACH | 245 | ₹735 |
| 2 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 10. Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | 114.22 | SQUARE METER | 19 | ₹2,170.18 |
| 3 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](iii) With 1:3 cement mortar (a) 20 mm thick plaster | 114.22 | SQUARE METER | 206 | ₹23,529.32 |
| 4 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc..C. REPAIR AND REHABILITATION WORKS?Applying epoxy based reactive joining agent for joining the old concrete with fresh concrete to be applied within manufacturer's specified time as per manufacturers specification. (0.4 Kg / m? of concrete surface).Note: Applicable only when the full diameter of reinforcement steel is exposed. | 89.28 | SQUARE METER | 309 | ₹27,587.52 |
| 5 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc..C. REPAIR AND REHABILITATION WORKS?Polymer concrete made with water resistant bonding agent of synthetic rubber emulsion as per manufacturer's specification excluding the cost of cement concrete (2.75 Kg / bag of cement) Note : Payment on volume of (1 : 1? : 3) Concrete. | 13.4 | CUBIC METER | 4,414 | ₹59,147.6 |
| 6 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc?33..Ordinary Cement concrete (mix 1:2:4) with graded stone chips (6mm nominal size) excluding shuttering and reinforcement,if any, in gound floor as per relevant IS codes. Pakur variety? | 4.13 | CUBIC METER | 5,275 | ₹21,785.75 |
| 7 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 13. Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge | 17.75 | CUBIC METER | 166 | ₹2,946.5 |
| 8 | MAKING OF 3 MM THICK FRP LINING 3 LAYER CHOPPER MAT & 1 LAYER MAT WITH VINYL EASTER RESIGN AS PER IS 12643 ON THE SURFACES OF THE MASONRY/RCC CONSTRUCTED CHEMICAL STORAGE CHAMBER.ESTIMATE PURPOSE RATE APPROVED BY C.E.O. & EX. OFFICIO D.G. (W.S) ,DATED-06.09.2018 | 960.9 | SQUARE FEET | 275 | ₹2,64,247.5 |
| 9 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 21 | EACH | 245 | ₹5,145 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_2551544.xls
BOQ • 0.29 MB
037TECHBID.pdf
Tender Documents • 1.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].