Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 LAdmitted-Finance | -1.00% | ₹2.0 L | L1 | Admitted-Finance |
| 2 | L2₹2.0 L+₹1,989.51 (1.01%)Admitted-Finance | +0.00% | ₹2.0 L+₹1,989.51 (1.01%) | L2 | Admitted-Finance |
Tender Value
₹2.0 L
EMD Value
₹3,920
Closing Date
1 Sept 2026, 6:00 pmClosed
Executive Engineer
Office Of The Executive Engineer REW Samba
Please Refer as per BOQ
2026_RDPR_322375_7
85 REW Samba of 2026-27, dated 25.08.2026
Open Tender
Civil Works
Percentage
30 days
Sumb
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer REW samba
₹3,920
14 Sept 2026
26 Aug 2026
2 Sept 2026
26 Aug 2026
1 Sept 2026
26 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed byEngineer-in-Charge.All kinds of soil : | 78.62 | cum | 187.3 | ₹14,725.53 |
| 2 | Extra for lifts over 1.5 mtrs | 22.57 | cum | 89.75 | ₹2,025.66 |
| 3 | Extra for lifts over 1.5 mtrs | 15.35 | cum | 179.25 | ₹2,751.49 |
| 4 | Extra for lifts over 1.5 mtrs | 9.51 | cum | 269.25 | ₹2,560.57 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1 | cum | 7,788.4 | ₹7,788.4 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. | 95.37 | kg | 123.2 | ₹11,749.58 |
| 7 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand). | 13.58 | cum | 7,571.75 | ₹1,02,824.37 |
| 8 | Extra for brick work with bricks of class designation 75 curved on plan upto a mean radius not exceeding 6 meters | 9.4 | cum | 994.4 | ₹9,347.36 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for:Foundations, footings, bases of columns etc. for mass concrete. | 3.82 | sqm | 286.35 | ₹1,093.86 |
| 10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 66.21 | cum | 218.4 | ₹14,460.26 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
BOQ_1080417.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .