Additional Chief Engineer (P&C)
Supply, Erection, testing & commissioning of 66kV D/C Becharaji-Vithalapur line on M/C Tower with ACSR Panther Conductor (AP-14 to AP-34) 11.86Rkm Under KSY Scheme.
332562
ACE(P&C)/Contract/E-503/TL/66kV/S&E
Open
Electrical Works
Turn-key
Vadodara
41 documents required · 29 mandatory · 12 optional
₹11,800
Gujarat Energy Transmission Corporation Limited
₹3.8 L
10 Aug 2026
10 Aug 2026
10 Aug 2026
3 Sept 2026
10 Aug 2026
Sr. No. Description of Works - SAC Code 9954 Amount in Rs.
PART -A Supply of Materials
Erection of Line
TOTAL F.O.R. COST WITHOUT GST
Service of "Works Contracts" GST @ 18% (SAC 9954)
TOTAL END COST WITH GST
I am / we are willing to carry out this service package of works contract stated above at GST 18% (in figure)
______ % (in words _____ %) below / above the estimated TOTAL END COST for all the items stated there in.
The amount of tender works out with above % (in figure) for TOTAL END COST Rs. _____________ (in words Rs.
I / we confirm that our above quoted rates are ON firm price basis; except supply of tower materials (including
nut-bolts) for which Price variation will be applicable.
1) Separation of the Contract into Supply of Goods, Services and Civil Work, is only for convenience and better
economical management and for the ease of Accountancy but the entire Contract, is to be assessed under GST
Law, as the Works Contract Service, which is, as per the provisions of Section 2(30), read with, Section 2(119),
further read with, Paragraph 6(a) of the Schedule II to the CGST Act, 2017 or SGST Act, 2017 and similar
provisions, applicable under the UTGST Act, 2017and the IGST Act, 2017 and the entire activity, would be
subjected to levy of Tax, at the rate of 9% CGST + 9% SGST or 18% IGST, under the GST Law. However,
Classification Codes for different segments or portions of the Works Contract, may be specified separately, in the
Supplies, with a final common Classification Code of Works Contract Service.
2) The Bidder is hereby conveyed that only SAC Code and Tax rate for supply of Service Works Contract i.e.
18% is relavant for the purpose of contract since the contract is works contract and any separation in the works
is for better management and convenience purpose.
It is to state that bidders are however requested to fill the HSN code item by item for the knowledge and
transparency purpose which shall have no bearing on price or taxation payment.
Signature of Authorized Representative of Company / Agency
SEAL & SIGNATURE Status _________________
OF BIDDER Name of bidder Company
Estimated Cost - SUPPLY
Supply, erection, testing & commissioning of 66kV D/C Becharaji-Vithalapur line on M/C Tower with ACSR Panther Conductor (AP-14
to AP-34) 11.86Rkm under KSY Scheme.
Tender No.-ACE(P&C)/Contract/E-503/TL/66kV/S&E
Sr. Description of Supply with Detail HSN / Unit Qty Unit Rate Unit Freight, Unit FOR Unit FOR Total Cost
No. Specification of Service Package - SAC Packing & Insurance Rate (Excl. GST)
Works Contract (SAC Code 9954) code Forwarding Charges in Rs. in Rs.
for charges in Rs.
A Supply of Materials
A.1 Tower Materials
A-2 AL-59 (Equivalent to Panther) conductor kM 0.000 328767.00 4264.00 1828.00 334859.00 -
A-3 ACSR Panther conductor kM 0.000 234904.00 2867.00 1229.00 239000.00 -
A.3 Silicone Rubber insulators - 66kV -
A.3.3 66kV,90kN - Suspension SRI Nos. 116 1615.00 12.00 5.00 1632.00
A.4 Insulator hardware for AL-59 -
(Equivalent to Panther) conductor
A.4.1 Single suspension Nos. 0 1666.00 37.00 16.00 1719.00 -
A.4.2 Double suspension Nos. 0 3916.00 103.00 44.00 4063.00 -
A.4.7 Vibration damper Nos. 0 603.00 25.00 11.00 639.00 -
A.4.8 Repair sleeve Nos. 0 323.00 6.00 2.00 331.00 -
A. Insulator hardware for ACSR -
Panther conductor
A.4.1 Single suspension Nos. 90 1564.00 17.00 7.00 1588.00
A.4.2 Double suspension Nos. 12 4413.00 34.00 15.00 4462.00
A.4.4 Double tension Nos. 24 4945.00 51.00 22.00 5018.00
A.4.6 Mid span joint Nos. 40 695.00 6.00 3.00 704.00
A.4.7 Vibration damper Nos. 432 572.00 11.00 5.00 588.00
A.4.8 Repair sleeve Nos. 7 252.00 6.00 3.00 261.00
A.6 OPGW - 24 Fibre (220kV) -
A.6.1 24 Fibre (DWSM) OPGW fibre Optic cable Km 0.000 145356.00 1999.00 857.00 148212.00 -
A.6.2 Installation Hardware set * & Km 0.000 45351.00 502.00 215.00 46068.00 -
accessories for above OPGW i.e. all
cable fittings & accessories like
suspension clamps, tension clamps,
vibration dampers, earthing clamps,
down lead clamps, in-line splice
enclosures etc. including; Pigtails FC-
a) Fibre Optic Approach Cable -
400 Mtrs - For 220KV S/S &
500 Mtrs - For 400KV S/S
(with installation hardware like ties/
clips / cleats, conduits, ducts,
supports, fittings, accessories etc).
(Any variation in quantities shall be
absorbed by contractor)
A.7 OPGW - 48 Fibre (220kV) -
A.7.1 48 Fibre (DWSM) OPGW fibre Optic cable Km 12.000 195533.00 2385.00 1022.00 198940.00
A.7.2 Installation Hardware set * & Km 12.000 48279.00 644.00 276.00 49199.00
accessories for above OPGW i.e. all
cable fittings & accessories like
suspension clamps, tension clamps,
vibration dampers, earthing clamps,
down lead clamps, in-line splice
enclosures etc. including; Pigtails FC-
a) Fibre Optic Approach Cable -
400 Mtrs - For 220KV S/S &
500 Mtrs - For 400KV S/S
(with installation hardware like ties/
clips / cleats, conduits, ducts,
supports, fittings, accessories etc).
(Any variation in quantities shall be
absorbed by contractor)
TOTAL COST FOR MATERIALS
Service of "Works Contracts" GST @ 18% (SAC 9954)
1) Separation of the Contract into Supply of Goods, Services and Civil Work, is only for convenience and better economical management and for
the ease of Accountancy but the entire Contract, is to be assessed under GST Law, as the Works Contract Service, which is, as per the
provisions of Section 2(30), read with, Section 2(119), further read with, Paragraph 6(a) of the Schedule II to the CGST Act, 2017 or SGST Act,
2017 and similar provisions, applicable under the UTGST Act, 2017and the IGST Act, 2017 and the entire activity, would be subjected to levy of
Tax, at the rate of 9% CGST + 9% SGST or 18% IGST, under the GST Law. However, Classification Codes for different segments or portions of
the Works Contract, may be specified separately, in the Supplies, with a final common Classification Code of Works Contract Service.
2) The Bidder is hereby conveyed that only only SAC Code and Tax rate for supply of Service Works Contract i.e. 18% is relavant for the
purpose of contract since the contract is works contract and any separation in the works is for better management and convenience purpose.
It is to state that bidders are however requested to fill the HSN code item by item for the knowledge and transparency purpose which shall have
no bearing on price or taxation payment.
Signature of Authorized Representative
of Company / Agency
SEAL & SIGNATURE Status _________________
OF BIDDER Name of bidder Company
ERECTION PORTION
Tender No.-ACE(P&C)/Contract/E-503/TL/66kV/S&E
Description of Supply with Detail Specification of Service FOR Total Cost
SN Package - Works Contract (SAC Code Unit Quantity Unit Rate (Excl. GST)
B ERECTION OF LINE
B-1 Schedule-1 (Tower line)
The work of detail survey, preparation and submission of profiles in
6 copies (PLSCAD as well as hardcopy),
Detail scope of Work :-
(a) Fixing of tower as per actual requirement, site condition and
plotting of line on profile having standard details i.e. span length,
lat-long (co-ordinate), chainage, weight and wind span, all
dimensions, scale, legends, tower spotting data etc. as per
requirement and along with all require details.
(c) Preparation and submission of tower schedule as per standard
require details with all the Major - Minor crossing details in profile
drawing and tower schedule, along with due care of clearance as per
1 prevailing standards i.e., for all electric line with pole, all type of kM 12.000 10222
track, river, pond, nala, road, canal etc.
(d) Details of Right of Way in profile drawing. i.e. Building, Temple,
(g) Plotting line on TIKKA-MAP (Revenue Land map) - Required
TIKKA-MAP will be provided by GETCO.
Importantly, any work other than mentioned will align with the
specific requirements outlined by the Engineer-in-Charge.
Note : The survey report will be submit with sign and stamp of the
surveyor agency and engineer in charge.
Check Survey along with plotting of line route on village (tika) map
with Coordinates including detailed survey, preparation of profiles
and revision in original route alignment, if any and as per
instruction of EIC.
Excavation excluding back filling, but including shoring, shuttering,
dewatering, tree cutting for tower footings etc. for:-
a) Normal soil either dry or wet / Sandy soil. CMT 3656.250 307.00
b) Black Cotton Soil either dry or wet. CMT 8925.330 614.00
c) Normal submerged / marine soil where dewatering is necessary. CMT 0.000 484.00 -
d) Black cotton submerged / marine soil where dewatering is
e) Soft Rock CMT 0.000 1066.00 -
f) Hard Rock CMT 0.000 2212.00 -
Installation of steel reinforcement in concrete foundation
including supply of GETCO Approved M.S. bars, binding wire. Work
4 also includes their cutting, bending, shaping and binding with MT 112.688 99900.00
binding wire and fixing in position of TMT bars as per drawing before
the concrete work and as per instruction of the EIC
Stub-setting with prop or template including back-filling, during
back filling dispose of excess soil and levelling of site is to be done
as per instructions of EIC but excluding excavation and concreting
etc. for all types of towers/extensions except special towers.
(Weight of stub, cleat & template with Bolt & Nuts of stub &
template shall be counted)) up to 6 mtr extension. (SOR Part-A -6)
6 ---- Do ---- up to 9 to 25 mtr extension MT 0.000 9918.00 -
Concreting of foundation by M20/M15/M25 mixture including
shoring, shuttering, compaction, dewatering etc. for normal tower /
tower with extension upto 25mtr.
After completion of concrete work, curring (watering to concerte) is
Grounding of towers with pipe type earthing including
excavation and back filling, with supply of all materials like 32mm
8 dia heavy duty 3 mtr. long G.I. Pipe, 50 x 6 mm G.I. flat, GI bolt- Set. 52 8985.00
nuts, with GI spring washer, salt, charcoal etc. as per drawing and
as per instruction of EIC.
Grounding of towers with COUNTER POISE TYPE including
9 excavation and back-filling and supply of all materials like GSS wire, Set. 0 15756.00 -
lugs, bolt-nuts, salt, coke/charcoal as per drawing.
Erection of super structure upto 6 meter extension including tree
cutting, fixing of tower accessories, attachments except ACD /DP
/NP /CIP /PP and excluding tack welding of bolts as per instruction
10 of EIC. This includes taking delivery of tower materials and bolt- MT 457.687 10076.00
nuts from GETCO’s stores etc. for normal, extension & special
towers at destination and keeping them in safe custody and
transporting the same to erection site.
Same as above but erection of 9/12/15/18/21/25 mtr. Extention
Fixing of Anti-climbing devices including supply of barbed wire
as per drawing and as per instruction of EIC.
Fixing of DP / NP / PP / CIP including supply of plates and supply
of G.I. bolts-nuts & tack welding as per drawings and as per
instruction of EIC.
Tack welding of nuts upto approx. 10 mtrs. height OR two bottom-
most panel from ground level at three places on the nuts Per
diametrically and applying zinc rich paint immediately after tack Bolt
welding and as per instruction of EIC.
Complete Installation of OPGW cable (24/48 fibres) including laying,
providing required hardwares, in line splices to be encased in Fibre
Optic Splice Enclosures, Laying and termination of a fibre optic
approach cable required to connect Overhead Fiber Optic Cable
(OPGW) between the final iin line splice enclosure on the
gantry/tower and the Fibre Optec Distribution panel (FODP) to be
installed within the building at both the substation ends as per
technical specifications
Link up of OPGW Cable including all related activities as per inst. Of
Stringing of ACSR/ AAAC 12 (Six) conductors for Multi circuit
including laying, jointing, tensioning, clamping with armour rods,
hoisting of insulator string fixing of jumpers, dampers etc. & with RKM 0.000 225856.00 -
required tree cutting on entire length for adequate clearances / safe
charging of line, as per instruction of EIC.
Stringing of ACSR/ AAAC 6 (Six) conductors for double circuit
including laying, jointing, tensioning, clamping with armour rods,
hoisting of insulator string fixing of jumpers, dampers etc. & with
required tree cutting on entire length for adequate clearances / safe
charging of line, as per instruction of EIC.
Stringing of ACSR/ AAAC 3 (Three) conductors for single circuit
including laying, jointing, tensioning, clamping with armour rods,
hoisting of insulator string fixing of jumpers, dampers etc. & with RKM 0.000 161057.00 -
required tree cutting on entire length for adequate clearances / safe
charging of line, as per instruction of EIC.-For Hot Line stringing
Stringing of ACSR/ AAAC 3 (Three) conductors for single circuit
including laying, jointing, tensioning, clamping with armour rods,
18 hoisting of insulator string fixing of jumpers, dampers etc. & with RKM 0.000 56464.00 -
required tree cutting on entire length for adequate clearances / safe
charging of line, as per instruction of EIC.
Termination and connection for making LOOP-IN-LOOP-OUT
arrangement with existing line during specified outage including
restringing of existing conductors OR dismantalling / new stringing
for making LILO arrangements with existing line or for change over Job
line as per approved LILO arrangement in profile as per instruction Work
of EIC in COLD CONDITION and dismentalled materials to be
credited to near by GETCO's store or sub station as per inst. of EIC.
To make necessary arrangements for fixing of 3 Nos. of through
(parallel / bypass) jumper provide at any location of newly erected /
existing line of (66kV / 132kV / 220kV) as per instruction of EIC.
Firewadge and conductor for the same work will be provided by
GETCO at free of cost, but agency has to take it from GETCO's store Job
and credit back the balance materials. Only Fire wadge connector 0.000 9354.00 -
will be fixed by special authorized person with using of firewadge
fixing gun only and same will be arranged by GETCO.
- D/C Line Only
Work of Painting of Line name, Location No., two coat Painting
Color code of desired length and telephone no. on Tower Leg with
19 letter of Gujarati language using ISI marked Paint as per instruction per loc 0.000 862.00 -
of EIC including Supply of paints and other require materials.
a) All four legs - For 4 Nos. of Line (M/C)
b) All four legs - For 2 Nos. of Line (D/C)
c) Two legs - For 1 Nos. of Line (S/C)
TOTAL COST PART - B, SCHEDULE WITHOUT GST
Service of "Works Contracts" GST @ 18% (SAC 9954)
TOTAL COST PART - B WITH GST
1) While calculating the weight of stub-setting, the weight of stub, cleat & templetes shall also be added in stub weight.
2) Red oxide & zinc rich paint shall be applied after tack welding of nuts.
3) The above rates are with supply of cement by the contractor.
4) The rate indicated above includes taking delivery of all stringing materials from Board / Contractor store at destination keeping them in safe
custody and transporting the same to erection site.
1) Separation of the Contract into Supply of Goods, Services and Civil Work, is only for convenience and better economical management and for the ease of
Accountancy but the entire Contract, is to be assessed under GST Law, as the Works Contract Service, which is, as per the provisions of Section 2(30), read
with, Section 2(119), further read with, Paragraph 6(a) of the Schedule II to the CGST Act, 2017 or SGST Act, 2017 and similar provisions, applicable under the
UTGST Act, 2017and the IGST Act, 2017 and the entire activity, would be subjected to levy of Tax, at the rate of 9% CGST + 9% SGST or 18% IGST, under the
GST Law. However, Classification Codes for different segments or portions of the Works Contract, may be specified separately, in the Supplies, with a final
common Classification Code of Works Contract Service.
2) The Bidder is hereby conveyed that only only SAC Code and Tax rate for supply of Service Works Contract i.e. 18% is relavant for the purpose of contract
since the contract is works contract and any separation in the works is for better management and convenience purpose.
It is to state that bidders are however requested to fill the HSN code item by item for the knowledge and transparency purpose which shall have no bearing on
price or taxation payment.
Signature of Authorized Representative
of Company / Agency
SEAL & SIGNATURE Status _________________
OF BIDDER Name of bidder Company
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
40. EMD BG Format.pdf
1. E-503 Tender Specification Part-1.pdf
2. E-503 Amendment -I Part-I Tender Spec.pdf
3.Tender Notice E-503.pdf
4.Price bid Part-III 66kv Bechraji-Vithalpar Line.pdf
5.BOQ 66kv Vithlapur Bechraji OH Line.pdf
6.Lat-Long Details 66kv Bechraji-Vitthalpar Line E-503.pdf
7.Joint venture agreement format.pdf
8.POA For JV Agreement format.pdf
9.66 KV ACD.pdf
11.Ammendment for TTR validity 26.02.2026.pdf
10.Amendment- Structure weight.pdf
12.HW and ACCS PANTHER CONDUCTOR.pdf
13.ON - Ammendment for ROW clause Tender Copy.pdf
14.OPGW (48F) specs final-R2-11.09.2023 final.pdf
15.R5 May 24- Silicon Rubber - Print Copy.pdf
16.Standard MQP GI Tower material for issuence to SUPPLIER COPY.PDF
17.SUPPLY and ERECTION OF 66KV MULTI CIRCUIT LINES.pdf
18.SUPPLY and ERECTION OF 66KV DC LINES - with and WO CONDUCTOR.pdf
19.Tower Accesories.pdf
20.TOWER MATERIAL-66KV MC LINE-PANTHER-final.pdf
21._PIPE_TYPE_EARTHING_1.pdf
22._PIPE_TYPE_EARTHING_2.pdf
23._PIPE_TYPE_EARTHING_3.pdf
24._ERECTION Circular-1.pdf
25._ Erection circular -2.pdf
26._RoW policy 2021.pdf
27._STD FQP TR LINE JUNE-2014.pdf
28.Public Procurement Circular of GOI.pdf
29.Safety_regulation_for_transmission_line.pdf
30 compensation GR_0001.pdf
31.RoW Guideline of GETCO GoG.pdf
32. EMD BG Format.pdf
33. SD cum PBG Format.pdf
34. Form for Networth Annual turnover LA.pdf
35. ONLINE SCHEDULE_TECH.pdf
36. Online Schedule-QR.pdf
37.L-2 Schedule 66kV DC Becharaji-Vithalapur line.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].