| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.8 LAccepted-AOC MANJUSHA KARIPOOR NEDUMANGAD | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹31.0 L+₹1.2 L (3.94%)Rejected-AOC MATTATHIL BUILDING PERINGALA PO KUMARAPURAM ERNAKULAM 683565 | ERNAKULAM | ERNAKULAM | KERALA | 683565 | L2 | Rejected-AOC L2 bidder | |
| 3 | L3₹32.9 L+₹3.1 L (10.3%)Rejected-AOC THOLIKKUZHY ADAYAMON P O KILIMANOOR TRIVANDRUM 695614 | THIRUVANANTHAPURAM | THIRUVANANTHAPURAM | KERALA | 695614 | L3 | Rejected-AOC L3 bidder |
Tender Value
₹35.1 L
EMD Value
₹50,000
Closing Date
23 Jan 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CEO Technopark
Park Centre building, Technopark Phase 1 Campus
Earth filling in proposed rehabilitation area
2023_ETPK_635233_1
ETPK/PH3/193/2023-24
Open Tender
Civil Works - Others
Item Rate
45 days
Technopark Phase 3 campus, Trivandrum
As mentioned in Bid1 document
2 documents required · 2 mandatory
₹2,950
₹50,000
Park Centre building, Technopark Phase 1 Campus
7 Feb 2024
22 Dec 2023
24 Jan 2024
23 Dec 2023
23 Jan 2024
28 Dec 2023
28 Dec 2023
Amount
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal & disposal of rubbish outside the campus. Complete as per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.
Earth work in excavation by mechanical manual means over areas including for the retaining wall and drain work (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 2km and lift up to 1.5 m, excavated earth to be levelled and neatly dressed. All kinds of soil. Complete as per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size). Complete as per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.
Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, sides and cover slab of retaining wall and drains etc for concrete. Complete as per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level for drain and retaining wall: 1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size. Complete as per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level for drain and retaining wall Thermo - Mechanically Treated bars of grade Fe-500D or more. Complete as per the direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.
Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material outside Technopark campus as per direction of Engineer -in- Charges The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.
Filling with available excavated (excluding rock) from places of availability with in a lead of 5 km gravelly earth in which particle size more than 475 microns should not be less than 20% and particle size less than 2 microns should not be more than 5% including conveyance to site, laying and spreading in layers not more than 30cm including all leads and lifts, breaking clods, watering at optimum moisture content and consolidating each layer using power roller of 8T to 10T capacity for every layer and taking extra care for top most layer to give an even level compact surface including all labour charges etc. complete The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge.
Supplying and fixing RCC precast slab 1:2:4 (including steel reinforcement) - 100X50X10 cm or nearest as per site condition and direction of engineer in charge. For the cover slab of the drain. The rate includes all material charges, side maintenance, leveling, fixing in proper alignment, labour, Transportation, scaffolding (if needed) loading/ unloading at the workspace and removal of debris from the work site, etc. complete as per the direction of the engineer in charge.
MBM ENGINEERING WORKS
thoppilcontractors(india)pvtltd
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_964317.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .