Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 LAccepted-AOC MADAVOOR PO KOZHIKODE PIN 673585 | KOZHIKODE | KERALA | 673585 | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.6 L+₹17,589 (3.27%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹4.9 L
EMD Value
₹12,228
Closing Date
25 Feb 2023, 9:00 amClosed
ASWATHY S PRASAD,
LID EW MADAVOOR GP
Annual Plan-MADAVOOR GP 20/22-23-KOOTTUMPURATHUTHAZHAM MOONNAMPUZHA THODU SUCHEEKARANAM-General Civil Work
2023_LSGD_559159_1
14/AE/LIDEW/MDR/14PHASE
Open Tender
Civil Works - Others
Item Rate
180 days
MADAVOOR
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,080
Yes
₹12,228
Yes
1 May 2023
17 Feb 2023
25 Feb 2023
17 Feb 2023
25 Feb 2023
17 Feb 2023
Amount
THODU CLEANING, protection
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
OD395699/2022-2023:Bailing out water using pump above 5HP up to 10 HP with engine and pumpset , including conveyance to site and erection , cost of fuel , lubrication oil and other stores of staff etc complete
ABDUL HAKKEEM V P
Bidder Name
ASHRAF M
ABDUL HAKKEEM V P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_822937.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .