Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | Sulthan Bathery Labour Contract and Construction Co.Operative Societey Ltd. L2 | omanan L1 |
|---|---|---|---|---|---|
| 1.00CULVERT | |||||
| 1.00 | 11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth | 77.52 | cum | 842 ₹65,271.84 | 827.18 ₹64,122.99 Lowest |
| 1.00 | 14.1:Providing and laying boulder apron for bed protection with stone boulders of minimum size and weight as per Table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications Clause 1301 | 15.26 | cum | 2,696 ₹41,151.74 | 2,645.66 ₹40,383.35 Lowest |
| 1.00 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6 | 7.28 | cum | 8,086 ₹58,825.65 | 7,905.68 ₹57,513.82 Lowest |
| 1.00 | 11.4.2.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 <br>II. P.C.C grade M 15 <br> (i) Nominal mix (1:2.5:5) | 9.15 | cum | 7,873 ₹72,053.7 | 7,725.99 ₹70,708.26 Lowest |
| 1.00 | 12.5.1.1:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m I. P.C.C grade M 15 (i) Nominal mix (1:2.5:5) | 38.33 | cum | 8,328 ₹3,19,212.24 | 8,171.71 ₹3,13,221.64 Lowest |
| 1.01 | 12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m III. R.C.C grade M 20 | 0.9 | cum | 9,360 ₹8,424 | 9,184.4 ₹8,265.96 Lowest |
| 1.01 | 12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 | 0.08 | tonne | 90,335 ₹6,955.8 | 88,640.05 ₹6,825.28 Lowest |
| 1.01 | OD120989/2025-2026:Providing Weep Holes to Cement Concrete Retaining Wall using 63mm 4kgf/cm2 PVC
Pipes, including cost of materials,conveyance,labour charges etc complete as per the direction of Engineer-in-Charge | 15.6 | per metre | 106 ₹1,653.6 | 104.41 ₹1,628.8 Lowest |
| 1.01 | 13.1.2:Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5R.C.C M 25 | 9.03 | cum | 10,694 ₹96,566.82 | 10,493.31 ₹94,754.59 Lowest |
Tender Value
₹8.5 L
EMD Value
₹21,161
Closing Date
18 Sept 2025, 3:00 pmClosed
Asst Engineer
Assistant Engineer LID WE SUB DIVISION KALPETTA
Annual Plan 2025 2026 Kalpetta Block P a n c h a y a t h P r o j e c t n o 1 1 0 2 5 2 6 KADACHIKKUNNU KATTUNAIKKA UNNATHI CHEMBAKAI TRIBAL LIBRARY ROAD BRIDGE CONSTRUCTION AT MUPPAINAD DIVISION TSP Fund Amount 1000000 General Civil Work
2025_LSGD_795539_7
AEE/LID(EW)KPTA/2/2025
Open Tender
Civil Works - Roads
Item Rate
Kalpetta
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,870
Yes
₹21,161
Yes
22 Nov 2025
11 Sept 2025
20 Sept 2025
11 Sept 2025
18 Sept 2025
11 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .