Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹6.3 LAccepted-AOC | 1 | Accepted-AOC First lowest | |
| 2 | 2₹6.5 L+₹17,260.26 (2.72%)Rejected-Finance KOCHU KAROTTU ANICADU P O | KERALA | 2 | Rejected-Finance 2nd lowest | |
| 3 | Rejected-Technical | - | Rejected-Technical 3rd lowest |
Tender Value
₹7 L
EMD Value
₹17,500
Closing Date
30 Dec 2017, 6:00 pmClosed
ASSISTANT ENGINEETR
LSGD SECTION,VARAPETTY
BUILDING WORK
2017_LSGD_177955_1
7/AE/LSGD/VAPTY/18
Open Tender
Civil Works - Buildings
Item Rate
90 days
VARAPETTY GP
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,400
EXECUTIVE ENGINEER,LSGD DIVISION
₹17,500
6 Feb 2021
18 Dec 2017
4 Jan 2018
18 Dec 2017
30 Dec 2017
18 Dec 2017
18 Dec 2017 - 30 Dec 2017
Amount
COnstruction of Anganvadi no 99
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
od226075/2017_2018 : Dry Rubble Masonry with hard stone for foundation and retaining wall
4.1.3 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
od226076/2017_2018 : Random Rubble Masonry with hard stone in cement mortar 1:6
5.9.5 : Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
od226077/2017_2018 : Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15<sup>0</sup> landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor two level excluding the cost of centering, shuttering, finishing and reinforcement, with1:11/2:3 (1 cement : 11/2 coarse sand : 3 graded stone aggregate 20 mm nominal size).
5.1.2 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars
50.6.1.2 : Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level thickness 20cm and above in: CM 1:6 ( 1 cement: 6 coarse sand) etc complete.
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
od226078/2017_2018 : Supplying and fixing RCC window frame of size 1.5x1.4 with all accessories and fittings complete
od226079/2017_2018 : Supplying and fixing RCC Door frame of size .9 x 2.1 with all accessories and fittings complete
13.1.1 : 12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
Benny Mathew
K GOPI
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_229228.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .