Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.5 LAccepted-AOC | L1 | Accepted-AOC agreement executed | |
| 2 | L2₹11.2 L+₹72,559.52 (6.92%)Rejected-AOC WAYANAD | KERALA | 670644 | L2 | Rejected-AOC second lowest | |
| 3 | Rejected-Technical | - | Rejected-Technical 4 th lowest bidder | |
| 4 | Rejected-Technical | - | Rejected-Technical 5 th lowest bidder | |
| 5 | Rejected-Technical | - | Rejected-Technical 3 rd lowest bidder |
Tender Value
₹12.0 L
EMD Value
₹30,000
Closing Date
5 May 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Executive Engineer
Assistant Executive Engineer,MI Subdivision,Pala
Side protection
2022_Irrig_487993_1
03/AEE/MI/SUBDN/PALA/2022-23
Open Tender
Civil Works - Others
Item Rate
180 days
Pala municipality
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,300
Yes
₹30,000
Yes
14 Sept 2022
26 Apr 2022
9 May 2022
26 Apr 2022
5 May 2022
26 Apr 2022
60 days
Amount
Protection wall
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
60.7.1 : DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.3.1 : Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
5.1.3 : Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
4.1.5 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
SUDHAKARAN P N
JOSEPH K K PWD CONTRACTOR
DAWN MATHEW
DELVIN SHAJI
Bidder Name
Joshy Joseph
JOSEPH K K PWD CONTRACTOR
SUDHAKARAN P N
DAWN MATHEW
DELVIN SHAJI
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_700951.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .