Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹1.3 CrRejected-Finance 1 VISHWAS NAGAR PO NFL GONIANA ROAD BATHINDA PUNJAB 151003 | BATHINDA | PUNJAB | 151003 | ₹1.3 Cr | L-2 | Rejected-Finance L-2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
| 4 | Rejected-Technical 3 GHA 10 VIGYAN NAGAR KOTA | KOTA | KOTA | RAJASTHAN | - | - | Rejected-Technical Not Qualified |
Tender Value
₹1.2 Cr
EMD Value
₹2.3 L
Closing Date
11 Apr 2022, 1:00 pmClosed
Chief Engineer, KSTPS, Kota
New Adm. Building, Kota Super Thermal Power Station, Sakatpura, Kota
Operation and Maintenance of Dense phase Dry Fly Ash Handling System of Unit 7 and Maintenance of ESP system system for Unit No. 1 to 7
2022_RRVUN_264014_1
TN-5013
Open Tender
Repair and Maintenance Works
365 days
Kota Super Thermal Power Station
As per QR mentioned in Tender documents
2 documents required · 2 mandatory
₹1,180
Digitally as mentioned in tender documents
₹2.3 L
Yes
25 Nov 2022
19 Mar 2022
12 Apr 2022
19 Mar 2022
11 Apr 2022
19 Mar 2022
PART-A-I - Operation & Maintenance of Dense Phase Dry Fly Ash Handling system of Unit # 7
Providing Assistance in operation of the entire Dry Fly Ash System from ECO, APH, ESP stack Hopper to Intermediate Silo, Intermediate Silo to Main Silo, Wet Disposal from Intermediate Silo to Slurry Pump House round the clock in three shift Manpower Required
Shift Incharge/ Supervisor
Highly Skilled/ fitter
Skilled Fitter/ Electrician
Semi-skilled worker
Un -skilled worker
Daily Routine / Preventive / Breakdown maintenance work and upkeeping of Dry/Wet Fly Ash Handling System from ECO, APH, ESP & Stack Hopper to Intermediate silo & Intermediate silo to Main Silo, all equipments including water system in shift i.e. round the clock or as per instruction of engineer Incharge, Details as per Scope of work Man Power required
Trained supervisor (diploma holder)
Highly Skilled/compressor fitter
Skilled Fitter/ Electrician
Semi-skilled worker
Un skilled worker
Un -skilled worker/sweepers
Annual maintenance contract of ESP System for Unit # I to VII
Daily Routine/Periodic/Preventive/ Maintenance and upkeeping of Mechanical System of ESP Unit-1 to 7, as per instruction of Engineer Incharge Man Power required.
Highly Skilled/ fitter
Skilled Fitter/ Electrician
Semi-skilled worker
Un -skilled worker
Semi-skilled worker as and when requirement of site
Bidder Name
Amount
Gill Engineering Pvt. Ltd.(GSTN-03AAECG0422D1ZI)
Krishna Engineering Works(GSTN-08AQDPS2196L1Z9)
Gill Engineering Pvt. Ltd.
Gill Engineering Pvt. Ltd.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid