Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accept |
| 2 | Accepted-Technical | Accepted-Technical Accept |
Tender Value
₹16.9 L
EMD Value
₹34,000
Closing Date
6 May 2026, 12:00 pmClosed
E.E. R.E.D. Division Azamgarh
R.E.D. Department Viakas Bhawan Azamgarh
Development Block Palhna Gram Sabha Lafia Tahirpur Rekhai new construction work of drain from Ram house to Talia Pokhari-48
2026_REDUP_1142959_1
2172/RED/Tender/ST/2025-26 Dt 28.03.2026
Open Tender
Civil Works
Fixed-rate
90 days
AZAMGARH
Please Refer Tender Document
3 documents required · 3 mandatory
₹1,194
₹34,000
12 May 2026
29 Apr 2026
6 May 2026
29 Apr 2026
6 May 2026
29 Apr 2026
29 Apr 2026 - 6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for foundation in ordinary soil including normal lead and lift with all completion of work and including disposal upto three chain minimum. As per SI no-251.Schedule Rate | 181.83 | Cum | 104.5 | ₹19,001.24 |
| 2 | Concrete with 40mm gauge brick ballast / stone ballast ,f/sand & cement in proportion of 12;6;1 in foundation and under floors including supply of all materials,labour and T & P etc,required for proper completion of the work.As per SI No-273 | 94.34 | Cum | 2,992.5 | ₹2,82,312.45 |
| 3 | First class b/w in 1:4 in cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc required for proper completion of work. Asper morth anlysis 600&1200 | 126.69 | Cum | 6,305.15 | ₹7,98,799.45 |
| 4 | 12mm thick cement plaster in 1:4 cement and sand moltar including supply of all material, labour and T&P, etc. required for proper completion of work as per SI no- 584 A. Schedule Rate for Fine sand | 857.74 | Sqm | 137.75 | ₹1,18,153.69 |
| 5 | R.C.C work with cement approved coarse sand and 2 cm. Gauge approved dalla grit proportion of 1:1.5:3in R.C.C Slab as per S.I no. 284 | 18 | Cum | 7,695 | ₹1,38,510 |
| 6 | Mild steel iron in plain work such as in reinforced concrete or rein force brick work wrought to required shape as necessary cutting. bending for proper completion of the work and including supply of steel its wastage bend hooks and authorised overlapping shall be measured required to proper completion of the work S.I.No. 504 | 14.13 | Sqm | 5,082.5 | ₹71,815.73 |
| 7 | Supply and fixing of 20mm granite stone sign board including all for proper completion of the work(material only) | 0.27 | Sqm | 2,145.1 | ₹579.18 |
| 8 | Lettring and painting of stone sign board including all compleat work chapter no 22 NS | 75 | Word | 14.25 | ₹1,068.75 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_2134705.xls
BOQ • 0.35 MB
T1.pdf
Tender Documents • 1.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .