| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.0 LAdmitted-Finance | ₹30.0 L | L1 | Admitted-Finance |
| 2 | L2₹32.0 LAdmitted-Finance | ₹32.0 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Party failed to submit Solvency certificate in line with PQC. |
| 4 | Rejected-Technical | - | - | Rejected-Technical Party failed to submit Solvency certificate and Turnover details in line with PQC. |
| Sl No | Description | Qty | Unit | B C P VENKATA SUBBAIAH L2 | SURESH M P L1 |
|---|---|---|---|---|---|
| 1.00 | Supplying and stacking at site 36mm or nearest size hard granite broken stones in standard heaps on road side for measurement including cost, conveyance etc.(7.5% deduction will be made from the stack measurement to arrive at the net quantity supplied). | 70 | M3 | 2,500 ₹1,75,000 Lowest | 2,513 ₹1,75,910 |
| 2.00 | Supplying and stacking at site 12mm or nearest size hard granite broken stone for pre-measurement. | 175 | M3 | 2,500 ₹4,37,500 Lowest | 2,516 ₹4,40,300 |
| 3.00 | Supplying and stacking at site 6mm or nearest size hard granite broken stone for pre-measurement. | 49 | M3 | 2,600 ₹1,27,400 | 2,543 ₹1,24,607 Lowest |
| 4.00 | Supplying and stacking at site paving bitumen VG-30 or equivalent with sealed container for measurement. | 15.13 | TO | 70,000 ₹10,59,240 | 61,878 ₹9,36,337.9 Lowest |
| 5.00 | Supplying and stacking at site Rapid setting bitumen emulsion (182 Kg Barrels) | 3.46 | TO | 70,000 ₹2,42,060 | 63,000 ₹2,17,854 Lowest |
| 6.00 | Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after applying a prime coat of hot bitumen using 36mm departmental broken stones and compacting with power roller / iron rammer to get a compact surface and applying hot bitumen by a pressure sprayer with all conveyance including cost of oils and fuel and hire charges of machinery and sundry expenses, etc. complete. (Total usage of bitumen 27.5kg / M3). | 70 | M3 | 2,400 ₹1,68,000 | 2,347 ₹1,64,290 Lowest |
| 7.00 | Providing 20mm thick pre-mixed chipping carpet using departmental materials (broken stone, emulsion & bitumen) after thoroughly cleaning the base with compressed air ,wire brushes , brass brooms and applying an emulsion priming coat of 6 Kg /10M2 and spreading the hot pre-mix (formed of 0.27M3 of departmental 12mm metal and 12.96kg of bitumen per 10M2) rolling to dense surface, then spreading the seal coat (comprising of a hot pre-mix of .09M3 of 6mm departmental metal and 8.64Kg of bitumen per 10M2)again rolling including the cost of , oils and fuel , hire of brass brooms , camber board , roler and other machines,watching, lighting and other charges etc. complete(Total usage of bitumen is 21.6 Kg per 10M2,and emulsion 6Kg/10 M2). | 5,450 | M2 | 125 ₹6,81,250 Lowest | 125 ₹6,81,250 Lowest |
| 8.00 | Providing an extra premix layer for leveling the severely damaged portion of road and to obtain a level surface to receive chipping carpet using departmental materials viz; 12 mm stone aggregate ,bitumen @ 48 Kg/Cu.m of metal & bitumen emulsion @ 6.25 kg/m3 for tack coat) after forming the potholes to regular shape, removing loose and defective material, applying emulsion with sprayer as tack coat,laying hot premix and rolling until coarse aggregate has a firm surface including hire for roller, boiler, sprayers,wire brushes, pouring cans etc, cost of fuel, oil etc, lighting, watching and other sundry stores etc.complete including charges for picking the existing damaged road surface to the required depth and removing all waste/earth etc.from the road surface (Measurement will be based on stack measurement vide item of 12 mm broken stone) | 28 | M3 | 2,700 ₹75,600 Lowest | 3,987 ₹1,11,636 |
| 9.00 | Transporting excess spoil earth, gravel, sand, broken stones, split stones, laterite stones, blasted rubble upto 45 DM3 size etc. by lorry to places pointed out upto a maximum distance of 5KM including loading with a lead of 50m and lift upto 1.5m at each loading point etc. complete. | 21 | M3 | 200 ₹4,200 Lowest | 298 ₹6,258 |
| 10.00 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller (8 -12tonne capacity) to achieve the desired density, complete as per specifications and directions of Engineer in-charge, with material conforming to Grade-III (size range 26.5 mm to 0.075 mm) having CBR Value-20. | 52 | M3 | 4,400 ₹2,28,800 | 2,698 ₹1,40,296 Lowest |
Tender Value
Refer Docs
EMD Value
₹65,000
Closing Date
25 Feb 2026, 11:00 amClosed
SM(Mat)C
Corporate Materials, PD Administration Building, FACT Udyogamandal, Kochi, Kerala
Repairing and resurfacing of roads in FACT Udyogamandal Township, as per tender conditions.
2026_FACT_896961_1
03009/2025-2026/E33041
Open Tender
Civil Works
Item Rate
60 days
FACT- Udyogamandal
Please refer tender documents
7 documents required · 7 mandatory
₹0
₹65,000
Yes
15 Jul 2026
4 Feb 2026
26 Feb 2026
4 Feb 2026
25 Feb 2026
4 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying and stacking at site 36mm or nearest size hard granite broken stones in standard heaps on road side for measurement including cost, conveyance etc.(7.5% deduction will be made from the stack measurement to arrive at the net quantity supplied). | - | M3 | - | - |
| 2 | Supplying and stacking at site 12mm or nearest size hard granite broken stone for pre-measurement. | - | M3 | - | - |
| 3 | Supplying and stacking at site 6mm or nearest size hard granite broken stone for pre-measurement. | - | M3 | - | - |
| 4 | Supplying and stacking at site paving bitumen VG-30 or equivalent with sealed container for measurement. | 1 | TO | - | - |
| 5 | Supplying and stacking at site Rapid setting bitumen emulsion (182 Kg Barrels) | - | TO | - | - |
| 6 | Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after applying a prime coat of hot bitumen using 36mm departmental broken stones and compacting with power roller / iron rammer to get a compact surface and applying hot bitumen by a pressure sprayer with all conveyance including cost of oils and fuel and hire charges of machinery and sundry expenses, etc. complete. (Total usage of bitumen 27.5kg / M3). | - | M3 | - | - |
| 7 | Providing 20mm thick pre-mixed chipping carpet using departmental materials (broken stone, emulsion & bitumen) after thoroughly cleaning the base with compressed air ,wire brushes , brass brooms and applying an emulsion priming coat of 6 Kg /10M2 and spreading the hot pre-mix (formed of 0.27M3 of departmental 12mm metal and 12.96kg of bitumen per 10M2) rolling to dense surface, then spreading the seal coat (comprising of a hot pre-mix of .09M3 of 6mm departmental metal and 8.64Kg of bitumen per 10M2)again rolling including the cost of , oils and fuel , hire of brass brooms , camber board , roler and other machines,watching, lighting and other charges etc. complete(Total usage of bitumen is 21.6 Kg per 10M2,and emulsion 6Kg/10 M2). | - | M2 | - | - |
| 8 | Providing an extra premix layer for leveling the severely damaged portion of road and to obtain a level surface to receive chipping carpet using departmental materials viz; 12 mm stone aggregate ,bitumen @ 48 Kg/Cu.m of metal & bitumen emulsion @ 6.25 kg/m3 for tack coat) after forming the potholes to regular shape, removing loose and defective material, applying emulsion with sprayer as tack coat,laying hot premix and rolling until coarse aggregate has a firm surface including hire for roller, boiler, sprayers,wire brushes, pouring cans etc, cost of fuel, oil etc, lighting, watching and other sundry stores etc.complete including charges for picking the existing damaged road surface to the required depth and removing all waste/earth etc.from the road surface (Measurement will be based on stack measurement vide item of 12 mm broken stone) | - | M3 | - | - |
| 9 | Transporting excess spoil earth, gravel, sand, broken stones, split stones, laterite stones, blasted rubble upto 45 DM3 size etc. by lorry to places pointed out upto a maximum distance of 5KM including loading with a lead of 50m and lift upto 1.5m at each loading point etc. complete. | - | M3 | - | - |
| 10 | Construction of granular sub-base by providing close graded Material conforming to specifications, mixing in a mechanical mix plant at OMC, carriage of mixed material by tippers to work site, for all leads & lifts, spreading in uniform layers of specified thickness with motor grader on prepared surface and compacting with vibratory power roller (8 -12tonne capacity) to achieve the desired density, complete as per specifications and directions of Engineer in-charge, with material conforming to Grade-III (size range 26.5 mm to 0.075 mm) having CBR Value-20. | - | M3 | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tenderdoc.pdf
Tender Documents • 8.06 MB
Unpricedbid.pdf
Tender Documents • 0.09 MB
Compliancestatement.pdf
Tender Documents • 0.28 MB
BOQ_942804.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].