Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹138.4 CrAccepted-AOC A 898 TAGORE NAGAR LUDHIANA 141001 PUNJAB | LUDHIANA | LUDHIANA | PUNJAB | 141001 | L1 | Accepted-AOC AOC | |
| 2 | L2₹155.5 Cr+₹16.5 Cr (11.9%)Rejected-Finance CHINAR COMMERCIAL COMPLEX THE BUND RESIDENCY ROAD SRINAGAR 190 001 | SRINAGAR | SRINAGAR | JAMMU AND KASHMIR | 190001 | L2 | Rejected-Finance NOT LOWEST | |
| 3 | L3₹156.6 Cr+₹17.6 Cr (12.7%)Rejected-Finance ENKAY TOWN PLAZA B I BLOCK PALAM VIHAR GURUGRAM HR 122017 | GURUGRAM | GURUGRAM | HARYANA | 122017 | L3 | Rejected-Finance NOT LOWEST | |
| 4 | L4₹166.0 Cr+₹27.0 Cr (19.4%)Rejected-Finance 401 THE GRAND MALL OPP STATE BANK ZONAL OFFICE S M ROAD AMBAWADI AHMEDABAD 380015 | AHMADABAD | GUJARAT | 380015 | L4 | Rejected-Finance NOT LOWEST | |
| 5 | L5₹169.5 Cr+₹30.5 Cr (22.0%)Rejected-Finance 5TH FLOOR JMD EMPIRE SECTOR 62 GOLF COURSE EXTENSION ROAD GURUGRAM HARYANA 122103 | GURUGRAM | GURUGRAM | HARYANA | 122103 | L5 | Rejected-Finance NOT LOWEST |
Tender Value
₹161.9 Cr
EMD Value
₹15 L
Closing Date
29 Mar 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE (AF) WAC PALAM
HQ CE (AF) WAC PALAM DELHI CANTT-10
RE-SURFACING OF RUNWAY AND AIRCRAFT OPERATING AREA AT AF STATION HALWARA
2022_MES_518926_3
CEWAC/HAL/T-02/2022-23
Open Tender
Civil Works
Item Rate
822 days
GE (P) (AF) HALWARA
AS PER NIT AND TENDER DOUCMENTS
9 documents required · 9 mandatory
₹3,000
GE (P) (AF) HALWARA
₹15 L
14 Jun 2023
11 Jan 2023
31 Mar 2023
11 Jan 2023
29 Mar 2023
16 Mar 2023
11 Jan 2023 - 16 Jan 2023
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing not exceeding 30cm deep and averaging 15 cm deep in any type of soil complete all as specified and directed. | 3,586.6 | Sqm | - | - |
| 2 | Surface excavation in soft /loose soil not exceeding 30 cm deep and averaging 15 cm deep and getting out complete all as specified and as directed. | 3,680 | Sqm | - | - |
| 3 | Rough excavation of soft soil (out side from defence lands) and not exceeding 1.5 m deep and getting out as specified and directed by Engr-In-Charge | 12,718.45 | Cum | - | - |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator)/ in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), in all kind of soil, including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m, complete all as specified and as directed. | 17,000 | Cum | - | - |
| 5 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (not exceeding 1.5m deep in depth) in all kind of soil including getting out and disposal of excavated soil as directed, lead upto 50 m, and lift upto 1.5m, complete all as specified and as directed. | 35,083.54 | Cum | - | - |
| 6 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (exceeding 1.5m but not exc 3.00m deep in depth) in all kind of soil including getting out and disposal of excavated soil as directed, lead upto 50 m, and lift upto 1.5m, complete all as specified and as directed. | 7,176.87 | Cum | - | - |
| 7 | M&L for hard core of broken brick of gauge exc 63mm but not exc 100 mm and depositing, spreading and leveling in layers not exceeding 15cm thickness, watering and well ramming complete all as specified and as directed by Engineer-in-Charge. | 43.51 | Cum | - | - |
| 8 | M& L for forming embankment for soils including raising (or lowering) earth , spreading in layers n. exc. 30cm thick watering, ramming/rolling up to 95% proctor density and finishing to required size shape etc n. exc 1.5mtr high from base complete all as specified and as directed. | 46,000 | Cum | - | - |
| 9 | Returning, filling in soft/loose soil including spreading, levelling, watering and well ramming in layers not exc 25cm complete all as specified. | 9,500 | Cum | - | - |
| 10 | Removing excavated material out side the Defence premises on descreation of contractor's own arrangement complete all as specified. | 12,718.45 | Cum | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_643497.xls
BOQ Document • 0.45 MB
112473984.pdf
Tender Document • 0.22 MB
Binder-I.pdf
Tender Document • 5.31 MB
Tenderdocuments.pdf
Tender Document • 17.41 MB
112473986.html
Tender Document • 0.03 MB
112920057.pdf
Tender Document • 0.08 MB
113237064.pdf
Tender Document • 0.67 MB
113819504.pdf
Tender Document • 0.09 MB
114347030.pdf
Tender Document • 0.09 MB
114869605.pdf
Tender Document • 0.09 MB
115646323.pdf
Tender Document • 0.07 MB
116161329.pdf
Tender Document • 1.25 MB
116463240.pdf
Tender Document • 0.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .