Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 LAccepted-AOC KANNUR | KERALA | 670001 | L1 | Accepted-AOC accepted lowest quoted | |
| 2 | L2₹10.7 L+₹148 (0.01%)Rejected-AOC NULL | L2 | Rejected-AOC Rejected higher than L1 |
Tender Value
₹14.8 L
EMD Value
₹36,930
Closing Date
21 Jul 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
Office of the BRIDGE DIVISION KANNUR
GENERAL-Investigation work for the construction of Chathanmukku bridge in Kannur district.-Investigation workInvestigation Work
2023_PWD_579211_1
PWD/BR/TR/24041/2022_3_1_1/1
Open Tender
Civil Works - Bridges
Item Rate
120 days
KANNUR
Please refer Tender documents.
12 documents required · 12 mandatory
₹2,760
Yes
₹36,930
Yes
23 Aug 2023
11 Jul 2023
24 Jul 2023
11 Jul 2023
21 Jul 2023
11 Jul 2023
Amount
Appendix A
56.13:Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations).
56.12.a:Total station surveying and preparation of site plan - Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval.
56.12.b:Total station surveying and preparation of site plan - Plain built up area with hindrance to line of sight due to buildings/structures.
56.17.1:Providing access to the site,clearing site and making good to erecting and conducting soil testing transfers within the site and for any other temporary arrangements to be erected within the area in connection with conducting soil testing.
56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.
56.9.1:Erecting platform over 2 nos of 2nd Class Boat using Mango wood planks of not less than 30 mm thick, Mango wood joists of 100 mm x 70 mm at 60 cm intervals including labour and hire of all materials and dismantling the platform after completion of work etc complete. excluding hire of boats (A Platform of minimum size 6.00 m x 5.00 m will be required)
56.10:Hire charges for providing 2 nos of 2nd Class boat with boatman for erecting the platform over which the boring plant is to be erected, and 1 no of 2nd Class boat with 1 boatman for conveying the departmental staff and labour engaged from the banks to platform and back etc.
56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.a.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.3.b.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.3.c.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.4:Boring through all type of hard rock or similar refusal strata of N value greater than 50 using diamond core drilling bit for in land under water and banks of river.
56.6:Recovering undisturbed soil samples using thin tube sampler of 75mm.to 100mm length internal dia 500mm length conforming to relevant IS Code at any required depth including clearing the bore hole etc complete.
56.8:Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.7:Conducting standard penetration test in bore hole at any depth.
56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes.
56.11.c:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring - Extra for additional set for bore holes exceeding 5 nos.
56.14.a:Cross sectional details - River.
56.15.a:Hydraulic Velocity Calculation - River.
56.16:Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.
G S Infrastructure
Bidder Name
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
G S Infrastructure
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .