| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC D NO 71 31 96 6 ASRR COLONY MALKAPURAM POST VISAKHAPATNAM 530 011 | VISAKHAPATANAM | ANDHRA PRADESH | 530011 | ₹9.2 L Quoted ₹9.9 L | L1 | Accepted-AOC Being lowest bidder |
| 2 | L2₹11.9 L+₹2.0 L (20.0%)Rejected-Finance PLOT NO 160 2 KH NO 443 NASIR PUR VILLAGE SOUTH WEST DELHI 110045 | SOUTH WEST DELHI | DELHI | 110045 | ₹11.9 L+₹2.0 L (20.0%) | L2 | Rejected-Finance Not being lowest bidder |
| 3 | L3₹13.9 L+₹3.9 L (39.5%)Rejected-Finance DOOR NO 44 19 10 RAILWAY NEW COLONY BEHIND SIVALAYAM VISAKHAPATNAM AP 530016 | VISAKHAPATANAM | ANDHRA PRADESH | 530016 | ₹13.9 L+₹3.9 L (39.5%) | L3 | Rejected-Finance Not being lowest bidder |
| 4 | L4₹17.7 L+₹7.7 L (77.5%)Rejected-Finance | ₹17.7 L+₹7.7 L (77.5%) | L4 | Rejected-Finance Not being lowest bidder |
| 5 | L5₹19.7 L+₹9.8 L (98.0%)Rejected-Finance | ₹19.7 L+₹9.8 L (98.0%) | L5 | Rejected-Finance Not being lowest bidder |
| Sl No | Description | Qty | Unit | ESWAR ENTERPRISES L7 | NEELESH ENTERPRISES L8 | DURGA MANIKANTA CIVIL AND ELECTRICAL WORKS L5 | Khairati Lal L2 | ANJALI ENTERPRISES L3 | RAJASHEKHAR ENTERPRISES L9 | Sri balaji Constructions L10 | M/s SRINIVASA REDDY CONSTRUCTIONS L4 | SAI SRINIVAS CONSTRUCTIONS L11 | D NARAYANA REDDY CONSTRUCTIONS L6 | SRI RAJA RAJESWARI ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of existing RCC Overhead Water Tank of capacity 1,00,000 litres including staging approximately 25.00 metres above ground level, comprising dismantling/demolition of RCC tank container, dome/slab, ring beams, columns, braces, staging and all other RCC structural members forming part of the overhead tank structure complete, including breaking and dismantling of reinforced cement concrete members and cutting of reinforcement wherever required for complete removal of the RCC overhead tank structure, complete all as specified and directed by Engineer-in-Charge. | 202.03 | Cum | 6,500 ₹13,13,195 | 7,000 ₹14,14,210 | 6,700 ₹13,53,601 | 4,400 ₹8,88,932 | 3,400 ₹6,86,902 | 6,800 ₹13,73,804 | 6,790 ₹13,71,783.7 | 6,095 ₹12,31,372.85 | 6,900 ₹13,94,007 | 6,700 ₹13,53,601 | 2,400 ₹4,84,872 Lowest |
| 2.00 | Demolition and dismantling of wrought iron, structural steel and reinforcement steel members forming part of the existing RCC overhead water tank structure including ladders, platforms, railings, pipe supports, access arrangements and other connected steel components at all heights including staging approximately 25.00 metres above ground level, by cutting, unbolting, gas cutting or mechanical means as required, including cutting and removal of reinforcement bars from RCC members during demolition operations, complete for separation from the RCC structure, complete all as specified and directed by Engineer-in-Charge. | 8.81 | Qtl | 4,150 ₹36,561.5 | 4,000 ₹35,240 | 4,500 ₹39,645 | 20,000 ₹1,76,200 | 9,000 ₹79,290 | 4,100 ₹36,121 | 4,350 ₹38,323.5 | 4,000 ₹35,240 | 4,300 ₹37,883 | 4,500 ₹39,645 | 1,900 ₹16,739 Lowest |
| 3.00 | Removing and transporting demolished materials obtained from demolition of RCC overhead water tank including concrete debris, reinforcement steel, wrought iron and structural steel members from site of work to a distance exceeding 1.50 km but not exceeding 15 km, including loading, transportation, unloading and depositing at locations, complete all as specified and directed by Engineer-in-Charge. | 202.03 | Cum | 3,300 ₹6,66,699 | 2,900 ₹5,85,887 | 2,710 ₹5,47,501.3 | 500 ₹1,01,015 Lowest | 2,700 ₹5,45,481 | 3,200 ₹6,46,496 | 3,290 ₹6,64,678.7 | 2,375 ₹4,79,821.25 | 3,200 ₹6,46,496 | 3,000 ₹6,06,090 | 2,300 ₹4,64,669 |
| 4.00Notes for Item No. 1.00 to 3.00 : (a) The bidder shall note that the RCC overhead water tank proposed for demolition is situated in very close proximity to a functioning office building, compound wall and a public civil road outside the premises, the demolition work shall be executed under supervision of experienced Civil Engineer. The contractor shall be deemed to have visited the site and fully acquainted himself with the site conditions and constraints before quoting the rates. (b) The quoted rates shall be deemed to be inclusive of all Fees/Salary of Experienced Civil Engineer, wages of labour, rent charges of tools, plant, machinery, equipment, safety arrangements, protective measures and all incidental charges required for carrying out the demolition work safely and efficiently without causing any damage to the adjacent office building, compound wall, road, existing services, structures and installations. (c) The contractor shall ensure that the demolition work is executed in a controlled manner and in such a way that no damage is caused to the nearby buildings, compound wall, roads, services or any other existing structures. Adequate precautions shall be taken to prevent falling of debris, excessive vibration, dust nuisance or any other impact that may affect the surrounding structures or environment. (d) The contractor shall make adequate arrangements for barricading, protective covering, warning signage and other necessary safety measures to ensure the safety of all personnel working in the area and also to prevent any hazard or inconvenience to the occupants of the nearby office building and the public moving on the adjoining civil road. (e) Considering that the adjacent office building is under regular functioning and there is movement of public on the adjoining road, the demolition work may be required to be carried out during non-working hours, night hours or late night hours as directed by the GE/Engineer-in-Charge. No extra payment shall be admissible on this account and the quoted rates shall be deemed to include the same. | ||||||||||||||
| 5.00Notes for Item No. 1.00 to 3.00 (contd--): (f) The contractor shall adopt suitable and approved demolition techniques, equipment and technology to ensure controlled demolition with minimal vibration and without causing any damage to adjacent buildings, compound wall, roads or existing services. (g) Prior to commencement of the work, the contractor shall submit a detailed demolition methodology indicating the proposed technique/technology, sequence of demolition, safety measures, protective arrangements and debris handling procedure to ensure that no damage occurs to adjacent structures, compound wall, road or to any person in the vicinity. The work shall not be commenced without obtaining prior approval of the GE/Engineer-in-Charge for the proposed methodology. (h) Any damage caused to the existing buildings, compound wall, roads, services or any other property due to negligence, improper planning or execution of the work shall be made good by the contractor at his own cost to the complete satisfaction of the GE/Engineer-in-Charge. (j) The contractor shall be solely and wholly responsible for the safety of his labour, staff and any other persons engaged by him for the execution of the work. In the event of any accident, fatal or otherwise, injury to persons, loss of life, or damage to property occurring during the course of execution of the work, the entire responsibility and liability shall rest with the contractor. All compensation, claims, damages, legal liabilities and settlements payable to the injured persons, workers or their families shall be borne entirely by the contractor and nothing whatsoever shall be payable by the Department on this account. (k) In case the contractor fails to settle or compensate such claims, the Department shall have the right to recover the amount from any money due or becoming due to the contractor under this contract or any other contract and settle the claims as deemed fit, including as per the orders of the competent court of law, and the decision of the Department in this regard shall be final and binding. | ||||||||||||||
| 6.00 | Dismantling joints of flanged pipes 250mm dia in position, including removing old rubber or fibre board gaskets, bolts, nuts. etc. from RCC overhead water tank having 25 m staging, complete all as specified and directed. | 5 | Each | 340 ₹1,700 | 310 ₹1,550 Lowest | 425 ₹2,125 | 500 ₹2,500 | 600 ₹3,000 | 390 ₹1,950 | 345 ₹1,725 | 350 ₹1,750 | 340 ₹1,700 | 370 ₹1,850 | 600 ₹3,000 |
| 7.00 | Dismantling joints of flanged pipes 200mm dia in position, including removing old rubber or fibre board gaskets, bolts, nuts. etc. from RCC overhead water tank having 25 m staging, complete all as specified and directed. | 5 | Each | 290 ₹1,450 | 260 ₹1,300 | 325 ₹1,625 | 500 ₹2,500 | 600 ₹3,000 | 250 ₹1,250 | 290 ₹1,450 | 270 ₹1,350 | 245 ₹1,225 Lowest | 250 ₹1,250 | 500 ₹2,500 |
| 8.00 | Dismantling joints of flanged pipes 150mm dia in position, including removing old rubber or fibre board gaskets, bolts, nuts. etc. from RCC overhead water tank having 25 m staging, complete all as specified and directed. | 10 | Each | 180 ₹1,800 Lowest | 190 ₹1,900 | 250 ₹2,500 | 300 ₹3,000 | 600 ₹6,000 | 220 ₹2,200 | 230 ₹2,300 | 200 ₹2,000 | 250 ₹2,500 | 210 ₹2,100 | 450 ₹4,500 |
| 9.00 | Taking up 250mm dia Cast Iron water mains (including all fittings), with flanged ends including disconnecting pipes and fittings complete from RCC overhead water tank having 25 m staging, complete all as specified and directed. | 25 | RM | 120 ₹3,000 | 125 ₹3,125 | 315 ₹7,875 | 300 ₹7,500 | 500 ₹12,500 | 140 ₹3,500 | 105 ₹2,625 Lowest | 130 ₹3,250 | 120 ₹3,000 | 110 ₹2,750 | 200 ₹5,000 |
| 10.00 | Taking up 200mm dia Cast Iron water mains (including all fittings), with flanged ends including disconnecting pipes and fittings complete from RCC overhead water tank having 25 m staging, complete all as specified and directed. | 25 | RM | 155 ₹3,875 | 170 ₹4,250 | 225 ₹5,625 | 150 ₹3,750 | 800 ₹20,000 | 115 ₹2,875 Lowest | 115 ₹2,875 Lowest | 140 ₹3,500 | 135 ₹3,375 | 125 ₹3,125 | 180 ₹4,500 |
Tender Value
₹14 L
EMD Value
₹28,000
Closing Date
11 Jun 2026, 6:00 pmClosed
Garrison Engineer Utility-II Visakhapatnam
Garrison Engineer Utility-II 104 Area Industrial Estate Post Visakhapatnam -530 007
DEMOLITION OF RCC OVERHEAD WATER TANK AT 104 AREA UNDER GE (UTILITY-II) VISAKHAPATNAM
2026_MES_766502_1
8147(A)
Open Tender
Civil Works
Item Rate
180 days
Garrison Engineer Utility-II Visakhapatnam
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
Garrison Engineer Utility-II
₹28,000
Yes
30 Jul 2026
20 May 2026
12 Jun 2026
20 May 2026
11 Jun 2026
5 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of existing RCC Overhead Water Tank of capacity 1,00,000 litres including staging approximately 25.00 metres above ground level, comprising dismantling/demolition of RCC tank container, dome/slab, ring beams, columns, braces, staging and all other RCC structural members forming part of the overhead tank structure complete, including breaking and dismantling of reinforced cement concrete members and cutting of reinforcement wherever required for complete removal of the RCC overhead tank structure, complete all as specified and directed by Engineer-in-Charge. | 202.03 | Cum | 1.25 | ₹252.54 |
| - | Demolition and dismantling of wrought iron, structural steel and reinforcement steel members forming part of the existing RCC overhead water tank structure including ladders, platforms, railings, pipe supports, access arrangements and other connected steel components at all heights including staging approximately 25.00 metres above ground level, by cutting, unbolting, gas cutting or mechanical means as required, including cutting and removal of reinforcement bars from RCC members during demolition operations, complete for separation from the RCC structure, complete all as specified and directed by Engineer-in-Charge. | 8.81 | Qtl | - | - |
| - | Removing and transporting demolished materials obtained from demolition of RCC overhead water tank including concrete debris, reinforcement steel, wrought iron and structural steel members from site of work to a distance exceeding 1.50 km but not exceeding 15 km, including loading, transportation, unloading and depositing at locations, complete all as specified and directed by Engineer-in-Charge. | 202.03 | Cum | 100 | ₹20,203 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
8147A_Tender.pdf
Tender Documents • 0.65 MB
BOQ_858535.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .