| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | ₹2.6 L | L1 | Accepted-AOC BEING L1 |
| 2 | L2₹2.7 L+₹2,461.30 (0.94%)Rejected-Finance | ₹2.7 L+₹2,461.30 (0.94%) | L2 | Rejected-Finance BEING L2 |
| 3 | L3₹2.7 L+₹3,678.99 (1.40%)Rejected-Finance | ₹2.7 L+₹3,678.99 (1.40%) | L3 | Rejected-Finance BEING L3 |
Tender Value
₹2.6 L
EMD Value
₹5,182
Closing Date
19 Mar 2026, 5:00 pmClosed
Executive Engineer
Office of the Executive Engineer Metropolitan Drainage Mechanical Division Jalasampad Bhawan (4th floor) Salt Lake City, Kolkata-700091
REWINDING AND NECESSARY REPAIRING OF 180HP 132 KLW 3 PHASE SQURREL CAGE INDUCTION MOTOR AT ADDITIONAL UTTARBHAG PUMPING STATION DURING YEAR 202627
2026_IWD_1017464_6
WBIW/EE/MDMD/e-NIT-24/2025-26
Open Tender
Electrical Work/ Equipment
Percentage
UTTARBHAG
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,182
10 Sept 2026
5 Mar 2026
24 Mar 2026
5 Mar 2026
19 Mar 2026
5 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out the L.T. sq. cage Induction Motor after disconnections of supply terminal connections including earthing terminal connection, from coupling end of 25/50 cusec vertical axial flow propeller pump after dismantling the same from the motor stool . The motor is to be kept on wooden sleeper at a suitable distance from the floor without damaging the earthing strips and cables etc. as per direction of E.I.C | 1 | Job | 1,761.48 | ₹1,761.48 |
| 2 | Preliminary checking of the whole motor (LT sq. cage IM) and testing of
I.R. value, load currents, leakage factor of stator & rotor, terminal lead
joints of stator connection ends, insulation of glass fibre terminal bar,
double cage rotor end rings and all of motor bars and bar joints, housing
of D.E. & NDE shield bearing housing etc. before work to detect fault. | 1 | Job | 5,010.33 | ₹5,010.33 |
| 3Finishing the end of terminal leads by S & F dowells copper sockets properly supplying tapes, petrollium jelly etc. 6 nos. | |||||
| 3.01 | i) Above 75KW upto 180KW LT sq. cage IM | 1 | Job | 2,109.49 | ₹2,109.49 |
| 3.02 | ii) S & F of 395 mm. x 25 mm. x 25 mm. glass fibre bar for L.T.Induction motor terminal with Class-H insulations (Each motor consists of 2 nos. of bars). | 1 | Job | 3,691 | ₹3,691 |
| 4 | DYNAMIC BALANCING
Trueness check ing & dynamic balancing of rotor. (Certificate is to be Pro
vided to Authority) | 1 | Job | 21,357.06 | ₹21,357.06 |
| 5 | Refitting the pump motor (LT sq. cage IM) set with all its necessary coupling and accessories to its original position including fitting fixing with bearing housing non reversable rachet unit and pump shaft with proper tollerance and clearance and reconnection of terminal points the overhauling work i.e. cleaning of contracts sliping etc. (all connection strips, cable end are to be refitted in proper way including good damages of strip terminals) and satisfactory 2 hours trial run of the pump as per direction of E.I.C. for all pumping stations. | 1 | Job | 2,742.33 | ₹2,742.33 |
| 6 | Complete Rewinding of stator of 180HP/132KW 415 Volt, 212 Amp. 3 Phase Induction Motor by CLASS-H (DUAL COATED) Super Enemal copper wire (Make : RAM RATNA/SHRAMIK Brand) after stripping out the damaged winding coils from the Stator Slots and cleaning of the each core slots properly, Re-insulates the slots by CLASS-H insulations, putting the newly made S.E. copper wire wound coils into the Stator Slots and insulations of the each coil (CLASS-H), to prevent short circuit between PHASE-PHASE and PHASE-EARTH. Taping the coil connection end with varnished Glass Tape. Jointing the bridge connection , batch connection and Terminal-end connection by silver-brazing process and insulation with Glass-Mica tape and Glass insulation tube. Heating the Rewinded Stator properly and varnishing with Dr. Beck's (ELANTAS BECK) ELMOLUFTHERM-H-71 and Epoxy GELCOAT(CLASS-H) varnish and Dried up the winding with slow heating process, develop the moisture proof I.R.-value and complete Rewinding works including supply of new S.E. copper wire (Dual coated/Kg. 112.320), All insulations such as NOMAX PAPER, VARNISHED GLASS TAPE, GLASS-MICA TAPE, GLASS INSULATION TUBE, GLASS FIBER WEDGES STICK, SILVER BRAZING STICK etc. for 180 HP/132 KW, induction motor. | 1 | Job | 2,22,412.52 | ₹2,22,412.52 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.67 MB
BOQ_2500114.xls
BOQ • 0.38 MB
2911i.pdf
Tender Documents • 0.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .