Loading…
Loading…
Tender Value
₹9.5 L
EMD Value
₹23,750
Closing Date
26 Jun 2026, 3:00 pm4d left
Similar tender results from the same govt authority in the past 3 years.
DIrector
DIRECTOR CAPE,Muttathara
Providing Sportnet (HDPEnet)
2026_CAPE_856230_1
W-3/2026-27/CAPE
Open Tender
Civil Works - Others
9 days
Muttathara
No
1 document required · 1 mandatory
₹1,900
₹23,750
17 Jun 2026
17 Jun 2026
30 Jun 2026
17 Jun 2026
26 Jun 2026
18 Jun 2026
18 Jun 2026 - 25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1SPECIFICATION | ||||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual meansover areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge. All kinds of soil | 10.33 | cum | 263.35 | ₹2,720.93 | BI01010001010000000000000515BI0100001113 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level :1:4:8 (1cement:4coarse sand (zone -III) derived from natural sources : 8 graded stone aggregate 40mm nominal size derived from natural sources) | 1.48 | cum | 8,109.18 | ₹11,969.15 | BI01010001010000000000000515BI0100001118 |
| 1.03 | Steel work for purlin/single section with GI pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc complete | 2,842.18 | kg | 191.2 | ₹5,43,424.05 | BI01010001010000000000000515BI0100001122 |
| 1.04 | Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer specifications including approprimate priming coat, preparation of surface etc complete. On steel work | 162.3 | sqm | 258.57 | ₹41,965.91 | BI01010001010000000000000515BI0100001123 |
| 1.05 | Plain Cement Concrete 1:4:8 (one cement four fine aggregatesProviding and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level :1:2:4 ( cement 2 coarse sand (zone -III) derived from natural sources : 4 graded stone aggregate 20mm nominal size derived from natural sources) and eight coarse aggregates) using | 5.95 | cum | 9,441.22 | ₹56,128.05 | BI01010001010000000000000515BI0100001125 |
| 1.06 | NET
Providing and fixing HDPE NET (sports net) including all cost of labour charges etc complete as per the direction of Engineer in charge | 910 | Nos | 156.8 | ₹1,42,688 | BI01010001010000000000000515BI0100001126 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Tendernotice_2.pdf
PDF • 0.79 MB
Tendernotice_3.pdf
PDF • 0.22 MB
TenderdocumentCEM.pdf
Tender Documents • 0.77 MB
BOQ_1447274.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid