Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹90.2 LAccepted-AOC AT RAMNAGAR PO BERMO DIST BOKARO 829104 | BERMO | BOKARO | JHARKHAND | 829104 | ₹90.2 L Quoted ₹76.5 L | 1 | Accepted-AOC TCR APPROVED IN FO L1 BIDDER. |
| 2 | 2₹98.6 L+₹22.2 L (29.0%)Rejected-Finance ADD INDIRA COLONY RANCHI ROAD PO MARAR RAMGARH CANTT 829117 DIST RAMGARH JHARKHAND | BOKARO | JHARKHAND | 829117 | ₹98.6 L+₹22.2 L (29.0%) | 2 | Rejected-Finance higher rate |
| 3 | Rejected-Technical | - | - | Rejected-Technical failed to submit credentials required as per NIT |
Tender Value
₹1.7 Cr
EMD Value
₹2.1 L
Closing Date
16 Jun 2026, 3:00 pmClosed
STAFF OFFICER CIVIL KUJU AREA
CIVIL DEPT. GM OFFICE CCL KUJU AREA KUJU RAMGARH JHARKHAND
Random rubble masonry fencing at different locations of closed mine of Semra OCP under Kuju Colliery, Kuju Area.
2026_CCL_360473_1
GM(K)/SO(C)/e-NIT/P/26-27/105
Open Tender
Civil Works - Others
Percentage
180 days
Kuju Colliery
Please refer NIT.
5 documents required · 5 mandatory
₹2.1 L
12 Sept 2026
29 May 2026
17 Jun 2026
1 Jun 2026
16 Jun 2026
1 Jun 2026
1 Jun 2026 - 10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Item Description/ Heading | - | - | - | - |
| 1 | Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock | 1,036.26 | M3 | 392.85 | ₹4,07,094.74 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. | 115.14 | M3 | 1,438.1 | ₹1,65,582.83 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6 (1 Cement : 3 coarse sand (zone-Ill) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources). | 230.28 | M3 | 6,480.4 | ₹14,92,306.51 |
| 4 | Random rubble masonry with quarry stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with : Cement mortar 1:6 (1 cement: 6 coarse sand). This includes picking, choosing and carriage of quarry stones all complete to the appropriate site as per the direction of EIC. | 2,835.32 | M3 | 3,886.78 | ₹1,10,20,265.07 |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:2:4 (1 Cement : 2 coarse sand (zone-Ill) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 143.93 | M3 | 8,725.55 | ₹12,55,868.41 |
| 6 | 18 mm cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 cement: 5 coarse sand) finished with a top layer 6 mm thick cement plaster 1:6 (1 cement: 6 fine sand). | 28.8 | M2 | 353.95 | ₹10,193.76 |
| 7 | Neat cement punning. | 28.8 | M2 | 58.95 | ₹1,697.76 |
| 8 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :Two or more coats on new work | 28.8 | M2 | 112.3 | ₹3,234.24 |
| 9 | Lettering with black Japan paint of approved brand and manufacture | 10,000 | per letter per cm height | 3.85 | ₹38,500 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.57 MB
BOQ_373358.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .