| Sl No | Description | Qty | Unit | Rajan P Mathews L1 | P SREEKUMAR L2 |
|---|---|---|---|---|---|
| 1.00Building maintenance | |||||
| 1.00 | 26.28.2:Chipping of unsound/weak concrete material from slabs, beams, columns etc.
with manual Chisel and/ or by standard power driven percussion type or of
approved make including tapering of all edges, making square shoulders of
cavities including cleaning the exposed concrete surface and reinforcement
with wire brushes etc. and disposal of debris for all lead and lifts all complete
as per direction of Engineer-In-Charge50mm average thickness | 2.4 | sqm | 235 ₹564 Lowest | 250 ₹600 |
| 1.00 | 26.28.3:Chipping of unsound/weak concrete material from slabs, beams, columns etc.
with manual Chisel and/ or by standard power driven percussion type or of
approved make including tapering of all edges, making square shoulders of
cavities including cleaning the exposed concrete surface and reinforcement
with wire brushes etc. and disposal of debris for all lead and lifts all complete
as per direction of Engineer-In-Charge25 mm average thickness | 10.03 | sqm | 116 ₹1,162.9 Lowest | 124 ₹1,243.1 |
| 1.00 | 26.29.1:Cleaning of reinforcement from rust from the reinforcing bars to give it a total
rust free steel surface by using alkaline chemical rust remover of approved
make with paint brush and removing loose particles after 24 hours of its
application with wire brush and thoroughly washing with water and allowing
it to dry, all complete as per direction of Engineer-In-Charge.Bars upto 12 mm diameter | 162.3 | metre | 7 ₹1,136.1 Lowest | 7.5 ₹1,217.25 |
| 1.00 | 26.29.2:Cleaning of reinforcement from rust from the reinforcing bars to give it a total
rust free steel surface by using alkaline chemical rust remover of approved
make with paint brush and removing loose particles after 24 hours of its
application with wire brush and thoroughly washing with water and allowing
it to dry, all complete as per direction of Engineer-In-Charge.Bars above 12 mm diameter | 24 | metre | 14 ₹336 Lowest | 15.75 ₹378 |
| 1.00 | 26.31.2:Providing, mixing and applying bonding coat of approved adhesive on chipped
portion of RCC as per specifications and direction of Engineer-In-charge
complete in all respect.Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make | 11.22 | sqm | 434 ₹4,871.65 Lowest | 460 ₹5,163.5 |
| 1.01 | OD160134/2026-2027:Applying a coat of passivating epoxy zinc rich primer, CERA ZINC ZR, Nitozinc primer of
FOSROC or like approves make with paint brush after removing all loose particles etc. as per
direction of Engineer- in charge Bars upto 12mm diameter | 162.3 | metre | 11 ₹1,785.3 Lowest | 12.75 ₹2,069.33 |
| 1.01 | OD160154/2026-2027:Applying a coat of passivating epoxy zinc rich primer, CERA ZINC ZR, Nitozinc primer of
FOSROC or like approves make with paint brush after removing all loose particles etc. as per
direction of Engineer- in charge
Bars above 12mm diamete | 24 | metre | 24 ₹576 Lowest | 25.5 ₹612 |
| 1.01 | OD161188/2026-2027:Providing and fixing scaffolding system on the exterior side, upto seven story hight made with
40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with lock
system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in therrespective of duration of scaffolding. Note:- This item to be used for maintenance work
judicially, necessary deduction for scaffolding in the existing item to be done . (Modified to
single type)
scaffolding for working platform etc. and maintaining it in a serviceable condition for the
required duration as approved and removing it there after. The scaffolding system shall be
stiffened with bracings, runners, connection with the building etc wherever required for
inspection of work at required location with essential safety features for the workmen etc.
complete as per directions and approval of Engineer- in Charge. The elevational area of the
scaffolding shall be measured for payment purpose. The payment will be made once | 34.05 | sqm | 128 ₹4,357.76 Lowest | 136 ₹4,630.12 |
| 1.01 | OD161229/2026-2027:proportion of 1:2(1 cement: 2 graded coarse sand with polymer minimum 2% by wt. of cement
used) and adding fiber reinforcements etc. as per specifications and directions of Engineer-incharge.
Note: Measurement and payment: The pre-measurement of thickness shall be done just after the
surface preparation is completed and Payment under this item shall be made only after proper
wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping
with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days
to be not less than 30 N/Sqmm2).
25 mm average thickness in 2 layers. | 4.84 | sqm | 1,007 ₹4,878.92 Lowest | 1,065 ₹5,159.93 |
Tender Value
₹4.2 L
EMD Value
₹10,574
Closing Date
9 Oct 2026, 3:00 pmClosed
AE
AELIDEWSubdivisionElanthoor
Elanthoor BP Proj No. 64/27. Mahila mandiram maintenance
2026_LSGD_874790_1
1/2026/AE/LID EW/EBP
Open Tender
Civil Works - Buildings
Item Rate
Elanthoor BP
Please refer Tender documents.
8 documents required · 8 mandatory
₹935
Yes
₹10,574
Yes
12 Oct 2026
30 Sept 2026
12 Oct 2026
30 Sept 2026
9 Oct 2026
30 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Building maintenance | |||||
| 1.001 | 26.28.2:Chipping of unsound/weak concrete material from slabs, beams, columns etc.
with manual Chisel and/ or by standard power driven percussion type or of
approved make including tapering of all edges, making square shoulders of
cavities including cleaning the exposed concrete surface and reinforcement
with wire brushes etc. and disposal of debris for all lead and lifts all complete
as per direction of Engineer-In-Charge50mm average thickness | 2.4 | sqm | - | - |
| 1.002 | 26.28.3:Chipping of unsound/weak concrete material from slabs, beams, columns etc.
with manual Chisel and/ or by standard power driven percussion type or of
approved make including tapering of all edges, making square shoulders of
cavities including cleaning the exposed concrete surface and reinforcement
with wire brushes etc. and disposal of debris for all lead and lifts all complete
as per direction of Engineer-In-Charge25 mm average thickness | 10.03 | sqm | - | - |
| 1.003 | 26.29.1:Cleaning of reinforcement from rust from the reinforcing bars to give it a total
rust free steel surface by using alkaline chemical rust remover of approved
make with paint brush and removing loose particles after 24 hours of its
application with wire brush and thoroughly washing with water and allowing
it to dry, all complete as per direction of Engineer-In-Charge.Bars upto 12 mm diameter | 162.3 | metre | - | - |
| 1.004 | 26.29.2:Cleaning of reinforcement from rust from the reinforcing bars to give it a total
rust free steel surface by using alkaline chemical rust remover of approved
make with paint brush and removing loose particles after 24 hours of its
application with wire brush and thoroughly washing with water and allowing
it to dry, all complete as per direction of Engineer-In-Charge.Bars above 12 mm diameter | 24 | metre | - | - |
| 1.005 | 26.31.2:Providing, mixing and applying bonding coat of approved adhesive on chipped
portion of RCC as per specifications and direction of Engineer-In-charge
complete in all respect.Epoxy bonding adhesive having coverage 2.20 sqm/kg of approved make | 11.23 | sqm | - | - |
| 1.006 | OD160134/2026-2027:Applying a coat of passivating epoxy zinc rich primer, CERA ZINC ZR, Nitozinc primer of
FOSROC or like approves make with paint brush after removing all loose particles etc. as per
direction of Engineer- in charge Bars upto 12mm diameter | 162.3 | metre | - | - |
| 1.007 | OD160154/2026-2027:Applying a coat of passivating epoxy zinc rich primer, CERA ZINC ZR, Nitozinc primer of
FOSROC or like approves make with paint brush after removing all loose particles etc. as per
direction of Engineer- in charge
Bars above 12mm diamete | 24 | metre | - | - |
| 1.008 | OD161188/2026-2027:Providing and fixing scaffolding system on the exterior side, upto seven story hight made with
40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with lock
system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in therrespective of duration of scaffolding. Note:- This item to be used for maintenance work
judicially, necessary deduction for scaffolding in the existing item to be done . (Modified to
single type)
scaffolding for working platform etc. and maintaining it in a serviceable condition for the
required duration as approved and removing it there after. The scaffolding system shall be
stiffened with bracings, runners, connection with the building etc wherever required for
inspection of work at required location with essential safety features for the workmen etc.
complete as per directions and approval of Engineer- in Charge. The elevational area of the
scaffolding shall be measured for payment purpose. The payment will be made once | 34.05 | sqm | - | - |
| 1.009 | OD161229/2026-2027:proportion of 1:2(1 cement: 2 graded coarse sand with polymer minimum 2% by wt. of cement
used) and adding fiber reinforcements etc. as per specifications and directions of Engineer-incharge.
Note: Measurement and payment: The pre-measurement of thickness shall be done just after the
surface preparation is completed and Payment under this item shall be made only after proper
wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping
with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days
to be not less than 30 N/Sqmm2).
25 mm average thickness in 2 layers. | 4.85 | sqm | - | - |
stage.html
html • 0.02 MB
finance_1484977.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_1484977.xls
BOQ • 0.25 MB
64compressedsbd.pdf
Tender Documents • 20.21 MB
Affidavit.pdf
Other Document • 0.23 MB
EPaymentForm.pdf
Other Document • 0.23 MB
FormofIntegrityPact.pdf
Other Document • 0.23 MB
FormofTender.pdf
Other Document • 0.24 MB
PreliminaryAgreement.pdf
Other Document • 0.25 MB
datecorrigendum1.pdf
PDF • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .