Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance PLOT NO 195 QUAY STREET OPP NAGINA HOTEL DARUKHANA REAY ROAD EAST MUMBAI MAHARASHTRA 400010 | MUMBAI SUBURBAN | MAHARASHTRA | 400010 | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹19.6 L (17.3%)Admitted-Finance 472 C 1 TOCOL MACHINE TOOLS PRIVATE LIMITED 13TH CROSS 4TH PHASE PEENYA INDUSTRIAL AREA BANGALORE KARNATAKA 560058 | BENGALURU URBAN | KARNATAKA | 560058 | ₹1.3 Cr+₹19.6 L (17.3%) | L2 | Admitted-Finance |
| 3 | L3₹1.7 Cr+₹60.5 L (53.5%)Admitted-Finance 31 NEELGIRI IND ESTATE T J ROAD SEWRI W MUMBAI MAHARASHTRA 400015 | MUMBAI | MAHARASHTRA | 400015 | ₹1.7 Cr+₹60.5 L (53.5%) | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹9.5 L
Closing Date
4 Nov 2019, 2:30 pmClosed
AGMCOM
INCOD OFFICE NAVAL DOCKYARD SBS MARG MUMBAI 400023
OFFLOADING ROUTINE/REPAIR OF TURBO BLOWER UNIT OF INS VIKRAMADITYA
2019_NAVY_289551_1
DYT/AST/19-20/106(A/PL-IN/INS VKD-TURBO-BLOWER/355
Limited
Miscellaneous Services
Item Rate
365 days
NAVAL DOCKYARD MUMBAI
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹9.5 L
Yes
NAVAL DOCKYARD MUMBAI
18 Mar 2020
14 Oct 2019
5 Nov 2019
14 Oct 2019
4 Nov 2019
23 Oct 2019
23 Oct 2019
Amount
Degutting & Regutting Charges of Turbo Blower Unit for Servicing as per 5 year Annual Routine
5 year Annual Routine as per the Scope of Work as follows (i)Check for proper fixing of the unit on the foundation and ensure all nuts are tight. If rusted undertake preservation.
(ii)Measure and record in log book the radial and axial position of turbo compressor and steam turbine rotors. ( Pre and Post repair)
(iii)Measure the run out of turbo compressor rotor and steam turbine rotor in thrust bearings- Check the values of change of clearances, comparing them with the normal permissible ones specified ones specified in TSU logbook/EHS
(iv)Measure the radial position of turbo compressor rotor and steam turbine rotor-Check the values of changw of clearances, comparing them with the normal permissible ones specified in TSU logbook/EHS
(v)Measure rthe radial clearance between ring and blades if gas turbine. Check the values of change of clearance, comparing them with the normal permissible ones specified in TSU logbook/EHS
(vi)Open the upper half of turbo compressor casing and inspect the condition of the flow sections as per scope of work at Enclosure 1
(vii)Open the upper half of casing of gas turbine and inspect the condition of the flow sections as per scope of work at Enclosure 2
(viii)Open the upper half of casing of steam turbine and inspect the condition of the flow sections as per scop of work at Enclosure 3
(ix)Overhauling of quick closing valve
(x)Overhauling of water servo motor
(xi)Overhauling of air sevo motor
(xii)Overhauling of control valve
(xiii)Overhauling of control shutter
(xiv)Overhauling of actuating regulation unit other than AUMA motor
(xv)Overhauling of air by pass shutter
(xvi)Inspection of thrust bearings
(xvii) Inspection of journal bearings
(xviii)Check the settings of key components of PY3 system (regulation,control, protection) joints: command block, over speed regulator, locking device abd lubrication lock-up valve (Controls in NDY Scope)
(xix)Overhauling of barring gear mechanism
TOCOL MACHINE TOOLS PVT LTD
YEOMAN MARINE SERVICES PVT. LTD.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .