Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Technically Qualified |
| 2 | Accepted-Technical 114 3 KASUNDIA ROAD HOWRAH 711101 | HOWRAH | WEST BENGAL | 711101 | Accepted-Technical Technically Qualified |
| 3 | Accepted-Technical 2 DASNAGAR V ROAD HOWRAH WEST BENGAL 711105 | HOWRAH | WEST BENGAL | 711105 | Accepted-Technical Technically Qualified |
| 4 | Accepted-Technical NO 1 RADHAKRISHNA COLONY CHAKDAHA NADIA WB 741222 | CHAKDAHA | NADIA | WEST BENGAL | 741222 | Accepted-Technical Technically Qualified |
| 5 | Accepted-Technical 96 A KALYANI SIMANTA P O P S KALYANI NADIA PIN 741235 | KALYANI | NADIA | WEST BENGAL | 741235 | Accepted-Technical Technically Qualified |
Tender Value
₹5.6 L
EMD Value
₹11,100
Closing Date
29 Jul 2026, 3:00 pmClosed
The University Engineer, University of Kalyani
The University Engineer, Works Department, University of Kalyani, Kalyani - 741235, Nadia, West Bengal
ESTIMATE FOR CONVERSATION OF TIN SHADED PLACE INTO TWO NOS RESEARCH ROOM WITH FALSE CEILING, TILE FITTING AT 1ST FLOOR OF ECOLOGICAL STUDIES DEPARTMENT.
2026_UOK_1032910_1
WD/2026-27/3T-1/375
Open Tender
CIVIL WORKS
Percentage
75 days
UNIVERSITY OF KALYANI
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹11,100
Yes
8 Sept 2026
17 Jul 2026
31 Jul 2026
17 Jul 2026
29 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Estimate for conversation of Tin shaded place into two nos research room with false ceiling, Tile fitting at 1st floor of Ecological Studies department. | - | - | - | - |
| 2 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
i) Pakur Variety
(I)Gr. Floor level | 2.04 | M3 | 5,704 | ₹11,641.86 |
| 3 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction
i) Tor steel/Mild steel.Other manufacturer's not specified . | 0.13 | mt | 53,000 | ₹6,625 |
| 4 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor)
a) 25mm to 30mm thick wooden shuttering as per direction of engineer in charge
(I) In gr. Floor level | 17.43 | m2 | 335 | ₹5,839.05 |
| 5 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
i) With 1:6 cement mortar
b) 20mm thick plaster | 122.97 | m2 | 175 | ₹21,519.75 |
| 6 | Welding in M.S structural work with gas or electric.
A) Tack Weld | 150 | each | 9 | ₹1,350 |
| 7 | Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :
On steel or other metak surface with super gloss (hi gloss )
b)Two coat ( with any shade except white ) | 18.24 | Sq m | 79 | ₹1,440.96 |
| 8 | M.S. round or square bar grating of windows etc. fitted and fixed in holes of window frame and with intermediate flat bar stiffener( with necessary holes for the grating bars and with the ends turned and fixed to timber frame with necessary screws) complete, as directed | 3.6 | qntl | 8,647 | ₹31,129.2 |
| 9 | Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. | 18.24 | m2 | 29 | ₹528.96 |
| 10 | Supplying, fitting & fixing Zn-Al alloy (55% Al & 45% Zn) coating of 150 grams per sq. metre (followed by colour coated on both side) steel sheet work having minimum yield strength of 550 Mpa of trapizoidal profile of approved make (excluding the supporting frame work) fitted and fixed with 55 mm & 25 mm self tapping screw, EPDM Washer 16 mm dia & 3 mm th. washer etc. complete with 150 mm end lap and one corrugation minimum side lap. (Payment to be made on area of finished work) | 4.32 | Sq-mtr | 787 | ₹3,399.84 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_2536746.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .