Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-AOC | L1 | Accepted-AOC Lowest |
| Sl No | Description | Qty | Unit | VARGHESE ABRAHAM L1 |
|---|---|---|---|---|
| 1.00extension | ||||
| 1.00 | 15.17.1:Dismantling steel work in single sections including dismembering and stacking within 50 metes lead in:R.S. Joists | 87.07 | kg | 3.02 ₹262.94 Lowest |
| 1.00 | 15.28.1:Dismantling roofing including ridges, hips, velleys and gutters etc., and stacking the material within 50 metres lead of :G.S. Sheet | 23.06 | sqm | 148.85 ₹3,431.89 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.98 | cum | 308.13 ₹303.51 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) | 0.62 | cum | 7,070.75 ₹4,383.87 Lowest |
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 3.71 | cum | 11,365.3 ₹42,210.72 Lowest |
| 1.01 | 5.22.2:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelHard drawn steel wire | 297.12 | kilogram | 104.58 ₹31,072.81 Lowest |
| 1.01 | 50.6.1.8:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand etc complete | 4.7 | cum | 7,094.04 ₹33,306.52 Lowest |
| 1.01 | 51.2.3:Filling with Quarry Muck <br> Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade | 9.9 | cum | 898.29 ₹8,893.07 Lowest |
| 1.01 | 10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. | 394.8 | kg | 124.29 ₹49,069.07 Lowest |
Tender Value
₹7.6 L
EMD Value
₹18,895
Closing Date
27 Feb 2025, 6:00 pmClosed
AE
oFFICE OF AE
Annual PlanKainakary GP 208 Providing additional facilities to MCF -Extention providing space for installation of bailing machine and completion of compound wall General Civil Work
2025_LSGD_731383_6
07/2024-2025/AE/LIDEW/KNKRY
Open Tender
Civil Works - Buildings
Item Rate
300 days
KAINAKRY GP
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,670
Yes
₹18,895
Yes
22 Oct 2025
20 Feb 2025
1 Mar 2025
20 Feb 2025
27 Feb 2025
20 Feb 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1190263.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .