Loading…
Loading…
Tender Value
₹13.8 L
EMD Value
₹13,848
Closing Date
3 Oct 2026, 2:00 pm2d left
MANGALAGIRI TADEPALLI MUNICIPAL CORPORATION
MANGALAGIRI TADEAPLI MUNICIPAL CORPORATION
Providing Borewell & laying water supply pripelines to newly proposed layout in Sy.No.150/2A in Ippatam village Tadepalli under AE-4 section in Mangalagiri Tadepalli Municipal Corporation under Municipal General Funds
996610
48/JTO/2026-27 - 14
OPEN - NCB
Water Supply
GUNTUR, ANDHRA PRADESH
6 documents required · 6 mandatory
₹491
₹13,848
30 Sept 2026
30 Sept 2026
30 Sept 2026
Earth work excavation for structures as per drawing and technical specificalons clause 305. including settin out, construction of shoring and bracing, removal of stumps and 1 other deleterious material and disposal upto a lead of 50m dressing of sides and bottom and back filling in trenches with excavated suitable material as per Technical Specification 305 MORD/304 MORTH
Carting away the surplus excavated earth from the work site with a lead of 3.00 Km beyond initial lead including loading. unloading and conveyance but exciding stacking charges etc., complete.
Bailing out water from the trenches with oil engine driven pump 3 sets, including hire charges, fuel charges and wages for Driver and Helper upto 5HP capacity pumps - 5 HP/Hr
Collection supply and filling of Stone Crusher Dust less than 3mm and fines not more than 10% including cost and conveyance of all materials labour charges watering and compacting etc., complete as per 88.under Bed Concrete.
Plain Cement Concrete (1:4:8) using 40 mm HBG metal with concrete mixture including cost and conveyance of all materials, labour charges, machine mixing charges, laying, vibrating and curing etc., complete as per S.S for bed concrete.
Providing concrete for plain/reinforced concrete (M20) in open foundations using 20 mm nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications of MORTH for Drain Bed
Providing concrete for plain/reinforced concrete (M20) in open foundations using 20 mm nominal size Graded hard stone aggregate mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications of MORTH for Drain Side Walls
Centering Charges for RCC vertical walls of plane surface including all type of labour charges (Open drains) for 600 mm and above.
VRCC M-30 Design 1 mix (Cement: fineaggregate: coarse aggregate) corresponding to Table 9 of IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication charges for finished item of work, but excluding centering, shutteing for Culvert.
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) / Mild steel (MS) steel bars (Fe 415/Fe 500 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work for culvert slab
Vibrated cement concrete M 30 grade design mix using 20mm & 10mm HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine aggregate conforming to table 1000-2) including cost, ting, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H specification and as directed by the Engineer-in-Charge for C.C approach
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ.xlsx
TENDER_DOCUMENT • 0.02 MB
DECLARATION.docx
TENDER_DOCUMENT • 0.02 MB
NIT and BOQ.xlsm
TENDER_DOCUMENT • 0.35 MB
Tender Document STATIC 2026.doc
TENDER_DOCUMENT • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .