| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.4 LAccepted-Finance | L1 | Accepted-Finance Due to L1 | |
| 2 | L2₹26.6 L+₹27,631.30 (1.05%)Rejected-Finance TEHSIL PANDETTE DISTT BILASPUR H P | L2 | Rejected-Finance Due to L2 |
Tender Value
₹25.1 L
EMD Value
₹50,300
Closing Date
11 Jun 2026, 10:30 amClosed
Executive Engineer
Division No.1, HPPWD Bilaspur
Periodical maintenance by Bitumen concrete and C/O PCC U-shape drain.
2026_PWD_135868_1
PW-BLP1-CB-E-Proc/26-3663-3713 dt 1.6.2026
Open Tender
Civil Works - Roads
Percentage
60 days
Bilaspur
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,000
₹50,300
10 Jul 2026
5 Jun 2026
11 Jun 2026
5 Jun 2026
11 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 KN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. (Fifty Millimeter) thick) Bitumen VG-30 (Thirty) . (Viscosity grade- thirty). for 75mm (Seventy five milimetre) completed tick in two layer aggregate sixe 0.90mm per 10 Sqm aggregate of size 20mm (Twenty milimetre) (0.18 Per Cubic metre) per 10 Sqm with paving asphalt VG@68kg/10Sqm. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 823.5 | Per Square Meter | 218 | ₹1,79,523 |
| 2 | Providing and applying tack coat using bitumen emulsion conforming to IS:8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom With rapid setting bitumen emulsion. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 4,323.37 | Per Cubic metre | 21 | ₹90,790.77 |
| 3 | Providing and laying Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. 25mm thick compacted thickness with bitumen of grade VG-30 @ 5.5% VG-THIRTY) (percentage by weight of total mix) and lime filler @ 3% (Three percentage) (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 108.08 | Per Cubic metre. | 17,007.15 | ₹18,38,132.77 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m (One point five metre) in width or 10 sqm (TenPer Square Metre) on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m,(One point five metre) including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. (Fifty metre) including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 142.5 | Per Cubic metre | 230 | ₹32,775 |
| 5 | Providing and laying in position cement concrete of specified grade including the cost of centering and shuttering - All work up to plinth level : 1:3:6 (One Cement : Three coarse sand) : Six graded stone aggregate 20 mm (twenty milimetre) nominal size). including carriage of materials , within all leads and lifts as per direction of Engineer-in-Charge. The rate includes octori, royality, malkhana, toll tax, Goods Service Tax, building and other constrcution worker, welfare cess royalty or any other tax, leavy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same. | 64.5 | Per Cubic metre | 5,747.5 | ₹3,70,713.75 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.70 MB
1SBDNain2511936.pdf
Tender Documents • 3.57 MB
BOQ_201166.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .