| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.2 LAccepted-AOC | L1 | Accepted-AOC As per work order | |
| 2 | L2₹13.2 L+₹48,081.50 (3.78%)Rejected-Finance | L2 | Rejected-Finance based on L1 basis | |
| 3 | L3₹13.8 L+₹1.1 L (8.69%)Rejected-Finance | L3 | Rejected-Finance based on L1 basis |
Tender Value
₹18.3 L
EMD Value
₹36,514
Closing Date
30 Jun 2022, 5:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
WRD Bicholim
EE VI WRD Bicholim
Improvement to the tank (Tali) at Kelbaiwada of V.P. Mayem Vaiginim in Bicholim Taluka of Maem constituency
2022_WRD_4450_1
No.WRD/WDVI/Accts/F.17/TN-e- 10/2022-23/ 243 Line1
Open Tender
Civil Works - Water Works
Item Rate
30 days
Bicholim
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,000
₹36,514
25 Oct 2024
21 Jun 2022
1 Jul 2022
21 Jun 2022
30 Jun 2022
21 Jun 2022
90 days
Amount
Demolish cement concrete 1:3:6 or richer mix including disposal of material within 50m lead
Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. All kinds of soil
Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete
Providing & laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded granitic or basaltic stone aggrt. 20 mm. nominal size) excluding cost of centering, shuttering and finishing in: a) All works upto plinth level
Centering & shuttering including Strutting, Propping & removal of forms for: a) Foundations, Footings, Bases for columns and mass concrete.
Providing and laying in position (1:11/2:3) Reinforced cement conrete excluding the cost of centering, shuttering, finishing and reinfrocement (1 cement: 1½ coarse sand:3 graded stone agg 20mm nominal size) b) In walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and structs etc. upto floor five level
Providing High Yield strength steel reinforcement bar (HYSD)/TMT steel reinforcement bar from secondary producers (confirming to IS 1786 of 1986 ) for RCC work including bending, binding and placing in position in all the floors along with the factory made precast concrete cover blocks of specified sizes whose compressive surrounding concrete in the structural member kg
abdul latheef
NAUSHAD M. SHAIKH
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .