Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance | -33.00% | ₹8.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹8.7 L+₹13,904.95 (1.63%)Admitted-Fee/PreQual/Technical/Finance BELONIA TRIPURA | -31.91% | ₹8.7 L+₹13,904.95 (1.63%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹8.8 L+₹25,641.24 (3.00%)Admitted-Fee/PreQual/Technical/Finance HARERKHOLA WARD NO 11 KAMALPUR NAGAR PANCHAYAT DIST DHALAI TRIPURA | GOMATI | TRIPURA | 799104 | -30.99% | ₹8.8 L+₹25,641.24 (3.00%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹8.9 L+₹38,398.07 (4.49%)Admitted-Fee/PreQual/Technical/Finance BABUGRAM PARA WEST HARINA SATCHAND SOUTH TRIPURA PIN 799145 | SOUTH TRIPURA | TRIPURA | 799145 | -29.99% | ₹8.9 L+₹38,398.07 (4.49%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹9.7 L+₹1.1 L (13.4%)Admitted-Fee/PreQual/Technical/Finance NEW JAIL ROAD SABROOM SOUTH TRIPURA | -23.99% | ₹9.7 L+₹1.1 L (13.4%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹12.8 L
EMD Value
₹25,514
Closing Date
11 Sept 2026, 3:00 pmClosed
Executive Officer, Sabroom Nagar Panchayat
Office of the Sabroom Nagar Panchayat, Sabroom, South Tripura
Formation of road from PWD road to Birendra Das house via Krishna Das house S.H- Brick Soling, retaining wall, cross drain at ward no-2 under Sabroom Nagar Panchayat during the year 2026-27.
2026_Urban_76591_1
05/SBM/NP/DEV/2026-27
Open Tender
Civil Works
Percentage
120 days
Sabroom Nagar Panchayat
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
₹25,514
14 Sept 2026
3 Sept 2026
14 Sept 2026
3 Sept 2026
11 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for Structures
A) Without dewatering.
Earthwork in excavation for structures as pe rdrawing and MoRD technical specifications Clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50m, dressing of sides & bottom and back filling in trenches with excavated suitable material.
I. Ordinary Soil
(i) Upto 3.00 mtr depth | 55.8 | Cum | 458.2 | ₹25,567.56 |
| 2 | Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200. (I)Sand filling | 5.22 | Cum | 1,168 | ₹6,096.96 |
| 3 | Providing concrete for plain concrete (using jhama brick aggregate) in open foundations complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900, 1202 and 1203 ( including centring, shuttering, staging etc. but excluding reinforcement )
I. P.C.C grade M 10 (using jhama brick aggregate )
ii) Nominal mix 1:3.6 | 5.22 | Cum | 9,099.9 | ₹47,501.48 |
| 4 | Providing concrete for plain/reinforced concrete in open foundations complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement).R.C.C grade M 20. (ii) Nominal mix 1.2.4 (Hand mixing) | 31.71 | Cum | 10,866.6 | ₹3,44,536.42 |
| 5 | Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar reinforcement in foundation complete as per drawings & MoRD technical specifications Clauses 1000 & 1202. | 3.49 | tonne | 91,240.9 | ₹3,18,248.26 |
| 6 | Providing weepholes in brick masonry / stone masonry, plain/ reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe or PVC pipe ( 110 mm OD of 6.0 Kg/cm2 ptressure ) extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MoRD technical specification clauses 614, 709, 1204.3.7 | 8.5 | mtr | 392.2 | ₹3,333.7 |
| 7 | Excavation in Soil with Dozer with lead upto 100 m.
Excavation for roadway in soil by mechanical means with Dozer including cutting and pushing the earth to site of embankment upto a distance of 100 m, including trimming bottom and side slopes in accordance with requirements of lines, grades and cross-sections as per MoRD Technical Specification Clause 302.3. | 263.88 | Cum | 81.1 | ₹21,400.99 |
| 8 | Construction of Embankment with Material Obtained from Borrow Pits. Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRD Technical Specification Clause 301.5. | 631.07 | Cum | 245.4 | ₹1,54,864.09 |
| 9 | Brick soling. IV) Brick edging laid length wise
Providing and laying brick edging laid lengthwise on prepared subgrade according to lines, grades and cross- section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. | 360 | mtr | 86.1 | ₹30,996 |
| 10 | Flat Brick soling
Providing and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. | 558 | sqm | 579.1 | ₹3,23,137.8 |
stage.html
html • 0.02 MB
finance_77965.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.14 MB
DNIeT.pdf
Tender Documents • 2.62 MB
BOQ_77965.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .