Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 CrAdmitted-Finance R O BOGDANG | L1 | Admitted-Finance | ||
| 2 | L2₹2.2 Cr+₹37,097.71 (0.17%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.3 Cr+₹6.2 L (2.83%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹2.3 Cr+₹11.9 L (5.44%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹2.4 Cr+₹24.3 L (11.1%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹3.7 Cr
EMD Value
₹7.4 L
Closing Date
25 Feb 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Xen RnB Division Kargil
Office of the Xen RnB Division Kargil
Upgradation of Govt. Higher Secondary School Pashkum .(Under SDP)
2026_PWD_18431_1
E tender 134 of 2025-26 PW RnB Division 2nd Kargil
Open Tender
Civil Works - Buildings
Percentage
240 days
Kargil
Please refer Tender documents.
5 documents required · 5 mandatory
₹3,700
Xen RnB Division Kargil
₹7.4 L
11 Mar 2026
3 Feb 2026
26 Feb 2026
3 Feb 2026
25 Feb 2026
3 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge. | |||||
| 1.01 | ALL KINDS OF SOIL @ 50% | 3,750 | Cum | 202.78 | ₹7,60,425 |
| 1.02 | Ordinary Rock @ 25% | 1,875 | Cum | 373.49 | ₹7,00,293.75 |
| 1.03 | Hard rock(B.P) @ 25% | 1,875 | Cum | 1,065.75 | ₹19,98,281.25 |
| 2Excavation work in excavation by mechanical means (Hydraulic excavator) / in foundation trenches or drains (not exceeding 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in- charge. | |||||
| 2.01 | ALL KINDS OF SOIL 60% | 392.8 | cum | 433.78 | ₹1,70,388.78 |
| 2.02 | ORDINARY ROCK 40% | 261.87 | cum | 959.74 | ₹2,51,327.11 |
| 3 | Stone soling(Dumping of stone including cost of stone (in horizaontal on level) | 50.52 | cum | 204.12 | ₹10,312.14 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) Mud Mat | 50.52 | cum | 5,570.23 | ₹2,81,408.02 |
| 5 | Providing and laying position cement concrete of specified grade excluding the cost of centering and shuttering. All work upto plinth level 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) (crushed) | 341.74 | Cum | 6,243.92 | ₹21,33,797.22 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.23 MB
BOQ_44326.xls
BOQ • 0.38 MB
CORRIGENDUMNIT134OF2025DATEEXTENSION.pdf
PDF • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .