Loading…
Loading…
| Sl No | Description | Qty | Unit | BLCCS LTD L2 | ALTHAF M L1 |
|---|---|---|---|---|---|
| 1.00Maintenance work in Sayanthanam | |||||
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 4.61 | cum | 2,129 ₹9,810.43 | 2,010 ₹9,262.08 Lowest |
| 1.00 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 51.84 | cum | 1,197 ₹62,052.48 | 1,130 ₹58,579.2 Lowest |
| 1.00 | OD134074/2025-2026:Bailing water using 5HP pump bailing out water with 5HP engine and pump set including conveyance to site and erection ,cost of fuel , lubrication oil and other stores, pay of staff etc complete | 40 | hour | 400 ₹16,000 Lowest | 430 ₹17,200 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 16.8 | cum | 359 ₹6,031.2 | 339 ₹5,695.2 Lowest |
| 1.00 | OD134365/2025-2026: DR PACKING Under foundation using Department rubble - Dry stone packing under foundation with good quality blasted department rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 25.2 | cum | 798 ₹20,109.6 | 753 ₹18,975.6 Lowest |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 4.2 | cum | 7,932 ₹33,314.4 | 7,485 ₹31,437 Lowest |
| 1.01 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 84.15 | cum | 8,360 ₹7,03,494 | 7,892 ₹6,64,111.8 Lowest |
| 1.01 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 208.11 | sqm | 839 ₹1,74,604.29 | 792 ₹1,64,823.12 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,262.25 | kilogram | 112 ₹1,41,372 | 106 ₹1,33,798.5 Lowest |
Tender Value
₹12.7 L
EMD Value
₹31,800
Closing Date
8 Oct 2025, 5:00 pmClosed
Deputy Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER, LID EW DIVISION KOLLAM JILLA PANCHAYATH, KOLLAM
855- PAVITHRESWARAM GP- PUTHUR SAYANTHANAM RETAINING WALL CONSTRUCTION
2025_LSGD_802655_15
06/DEE/LIDEW/KLM/25-26
Open Tender
Civil Works - Others
Item Rate
90 days
KOLLAM DP
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹31,800
Yes
11 Nov 2025
27 Sept 2025
10 Oct 2025
27 Sept 2025
8 Oct 2025
27 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1334517.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .