Loading…
Loading…
| Sl No | Description | Qty | Unit | DAVID RAJ L1 | laldinga L2 | REGHU C L3 |
|---|---|---|---|---|---|---|
| 1.00Study and research center | ||||||
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 315.08 | cum | 340 ₹1,07,128.56 | 247 ₹77,825.75 Lowest | 256.21 ₹80,727.67 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 10.29 | cum | 360 ₹3,703.68 | 344 ₹3,539.07 Lowest | 357.75 ₹3,680.53 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 90.02 | cum | 375 ₹33,759 | 125 ₹11,253 Lowest | 130.3 ₹11,730.13 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 45.15 | cum | 7,400 ₹3,34,095.2 Lowest | 7,622 ₹3,44,118.06 | 7,889.42 ₹3,56,191.53 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 68.77 | sqm | 345 ₹23,726.34 Lowest | 370 ₹25,445.64 | 384.04 ₹26,411.2 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 244.92 | sqm | 950 ₹2,32,674 Lowest | 968 ₹2,37,082.56 | 1,003.02 ₹2,45,659.66 |
| 1.01 | 5.9.2:Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 19.6 | sqm | 750 ₹14,701.5 Lowest | 806 ₹15,799.21 | 835 ₹16,367.67 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 391.86 | sqm | 850 ₹3,33,077.6 | 732 ₹2,86,838.59 Lowest | 758.7 ₹2,97,301.15 |
| 1.01 | OD69383/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer - in-charge. All work upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum | 86.6 | cum | 10,500 ₹9,09,300 | 10,463 ₹9,06,095.8 Lowest | 10,829.89 ₹9,37,868.47 |
Tender Value
₹83.2 L
EMD Value
₹50,000
Closing Date
13 Oct 2025, 5:00 pmClosed
Executive Engineer
Executive Engineer Thiruvananthapuram District Panchayath
Building
2025_LSGD_805797_5
19/HD/EE/LSGD/TVM/2025-26
Open Tender
Civil Works - Buildings
Item Rate
180 days
Thiruvananthapuram
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
23 Jul 2026
6 Oct 2025
15 Oct 2025
6 Oct 2025
13 Oct 2025
6 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1341910.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .