| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-AOC | ₹14.5 L Quoted ₹15.7 L | L1 | Accepted-AOC L1 Vendor |
| 2 | L2₹17.5 L+₹1.8 L (11.8%)Rejected-AOC | ₹17.5 L+₹1.8 L (11.8%) | L2 | Rejected-AOC L2 vendor |
| 3 | Rejected-Technical | - | - | Rejected-Technical not meeting QR |
| Sl No | Description | Qty | Unit | M/s Das Traders | MITHU CHANDA |
|---|---|---|---|---|---|
| 1.00 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-All work upto plinth level:
1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size) | 73 | Cum | 8,40,821.3 ₹9,92,169.13 | 7,62,120 ₹8,99,301.6 Lowest |
| 2.00 | Cantering shuttering including struttings, propping etc. and removal of form work for:
Foundations, footings, bases for columns etc. for mass concrete with timber plank | 37.1 | Sq.m. | 12,201.82 ₹14,398.15 | 10,759 ₹12,695.62 Lowest |
| 3.00 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. -All kinds of soil | 750 | Sq.m. | 13,372.5 ₹15,779.55 Lowest | 14,250 ₹16,815 |
| 4.00 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete.
Sand Filling under foundation | 24.38 | Cum | 28,266.23 ₹33,354.15 | 25,593.75 ₹30,200.63 Lowest |
| 5.00 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more
Note: Item 5.19 & 5.20 -Wastage and unauthorised overlaps shall not be paid for. Annealed steel wire required for binding or tack welding shall not be measured, its cost being included in the rate of reinforcement. Wherever tack welding is used in lieu of binding, such welds shall not be measured. Chairs, separators etc. shall be provided as directed by Engineer-in-Charge and measured separately and paid for. | 4,814.32 | Kg | 4,92,697.61 ₹5,81,383.18 | 4,47,731.85 ₹5,28,323.58 Lowest |
| 6.00 | First class brick work in foundation and plinth including cost of all materials as required complete:-
In cement mortar 1:5 ( 1 cement : 5 fine sand ). | 5 | Cum | 47,611.95 ₹56,182.1 | 44,500 ₹52,510 Lowest |
| 7.00 | Supply & laying of Black 125 Micron LDPE Polythene Sheet, For Construction before concrete. | 730 | Sq.m. | 28,762 ₹33,939.16 | 16,060 ₹18,950.8 Lowest |
| 8.00 | Providing and filling in position bitumen mix filler for expansion joints@ 3 miter C/C. Width 30mm & depth as per site condition- length wise | 70 | M | 21,381.5 ₹25,230.17 | 7,700 ₹9,086 Lowest |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
5 Feb 2025, 6:00 pmClosed
Head Plant Contract and Materials
ONGC Tripura Power Company Limited, Udaipur-Kakraban Road, Palatana P.O., District Gomati, Tripura 799105
Concreting around Cooling Tower-2 basin at ONGC Tripura Power Company Limited (OTPC) Gomati District, Tripura it includes surface preparation, supply of material, installation and testing. The work has to be carried on turnkey basis
2025_OTPC_223685_1
OTPC/Concreting/PLT/23-24/581
Open Tender
Civil Works
Works
120 days
ONGC Tripura Power Company Limited (OTPC)
Refer Tender Documents
6 documents required · 6 mandatory
₹0
₹50,000
Yes
28 Aug 2025
11 Jan 2025
8 Feb 2025
11 Jan 2025
5 Feb 2025
11 Jan 2025
11 Jan 2025 - 16 Jan 2025
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement-All work upto plinth level: 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size)
Cantering shuttering including struttings, propping etc. and removal of form work for: Foundations, footings, bases for columns etc. for mass concrete with timber plank
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. -All kinds of soil
Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. Sand Filling under foundation
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more Note: Item 5.19 & 5.20 -Wastage and unauthorised overlaps shall not be paid for. Annealed steel wire required for binding or tack welding shall not be measured, its cost being included in the rate of reinforcement. Wherever tack welding is used in lieu of binding, such welds shall not be measured. Chairs, separators etc. shall be provided as directed by Engineer-in-Charge and measured separately and paid for.
First class brick work in foundation and plinth including cost of all materials as required complete:- In cement mortar 1:5 ( 1 cement : 5 fine sand ).
Supply & laying of Black 125 Micron LDPE Polythene Sheet, For Construction before concrete.
Providing and filling in position bitumen mix filler for expansion joints@ 3 miter C/C. Width 30mm & depth as per site condition- length wise
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .