| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.8 LAccepted-AOC D NO 9 947 66 DOCTORS COLONY SHIVAJI PLEM VISAKHAPATNAM 530017 | VISAKHAPATANAM | ANDHRA PRADESH | 530017 | L1 | Accepted-AOC BEING THE LOWEST | |
| 2 | L2₹27.2 L+₹28,284 (1.05%)Rejected-Finance D NO 35 14 13 1 R P PETA KANCHARAPALEM VISAKHAPATNAM 530 008 | VISAKHAPATANAM | ANDHRA PRADESH | 530008 | L2 | Rejected-Finance NOT LOWEST | |
| 3 | L3₹29.2 L+₹2.3 L (8.59%)Rejected-Finance D NO 65 6 500 2 MULAGADA COLONY HIMACHALNAGAR GAJUWAKA VISAKHAPATNAM 530 026 | VISAKHAPATANAM | ANDHRA PRADESH | 530026 | L3 | Rejected-Finance NOT LOWEST |
| Sl No | Description | Qty | Unit | M/S CHANDRA ENGINEERS AND CONTRACTORS L2 | SRIVALLI ENGINEERS L1 | ANAND ENTERPRISES AND ENGINEERS L3 |
|---|---|---|---|---|---|---|
| 1.00 | M&L carrying out complete the rectification of compressors, condensers and evaporator system capacity of 3 x 90 TR Shtil hangar of Make: Blue star Model LCAX1-0375-DA, involving replacement spare, testing and commisioning including panel recommissioning, Re- assembling the compressor in all respect, refixing the same in its original position and re-connecting all disconnected lines including Leak test, pressure, nitrogen test, Vacuuming, gas filling etc, in serviceable and operational condition complete all as manufactureres with following items as given below and as directed. | 1 | Each Job | 75,000 ₹75,000 | 72,000 ₹72,000 Lowest | 80,000 ₹80,000 |
| 1.01Note: (i) The rate quoted shall be deemed to include for necessary filter, T&P, MS Nuts, MS Bolts, MS washers, gaskets, drier core filter etc to put into AC Plant and panels in serviceable condition, testing and commissioning complete all as directed by the Engr-in-charge. (ii) New spare parts required for replacing old parts shall be measured and paid separately against ‘Supply only’ under item No 1.03 to 1.12 here-in-after, labour rate quoted shall be deemed to have been inclusive of such items. | ||||||
| 1.02(iii) Any minor spares / parts /accessories not covered in the Schedule "A" Part but required for completion of job shall be provided by the contractor and the rate quoted shall be deemed to have been inclusive of such items. (iv) Servicing of control wiring in the system/ panel operating parameter microprocessor, motherboard, communication, control card etc, is deemed to be included in the quoted rate. (v) Servicing shall be carried out through OEM /authorised Agency only and test report shall be submitted in duplicate. | ||||||
| 1.03 | Supply only Gas refill R134A | 122 | KGS | 1,300 ₹1,58,600 | 1,100 ₹1,34,200 Lowest | 1,150 ₹1,40,300 |
| 1.04 | Supply only temp Sensors . | 2 | Each | 9,300 ₹18,600 | 8,000 ₹16,000 | 5,000 ₹10,000 Lowest |
| 1.05 | Supply only Star delta main contactors (3TS49) | 1 | Each | 65,000 ₹65,000 | 2,500 ₹2,500 Lowest | 3,000 ₹3,000 |
| 1.06 | Supply only MCB's Sp 32 amps | 2 | Each | 3,600 ₹7,200 | 300 ₹600 Lowest | 450 ₹900 |
| 1.07 | Supply only Exv control board existing model. | 1 | Each | 45,900 ₹45,900 Lowest | 63,000 ₹63,000 | 70,000 ₹70,000 |
| 1.08 | Supply only Flow switch | 2 | Each | 14,000 ₹28,000 | 8,500 ₹17,000 | 7,500 ₹15,000 Lowest |
| 1.09 | Supply only Display board. | 2 | Each | 72,000 ₹1,44,000 | 63,000 ₹1,26,000 Lowest | 75,000 ₹1,50,000 |
Tender Value
₹27.4 L
EMD Value
₹54,800
Closing Date
12 Jul 2025, 6:00 pmClosed
CWE NO 2 VISAKHAPATNAM
CWE NO 2 VISAKHAPATNAM, HQ CE N COMPLEX, RAILWAY STATION ROAD, VISAKHAPATNAM - 530004
REPAIRS / MAINTENANCE OF VARIOUS CHILLER UNITS OF CENTRALISED AC PLANTS OF MAKE BLUESTAR IN NAVAL STATION, BHEEMUNIPATNAM
2025_MES_713318_1
82733
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
180 days
GE P N KALINGA
AS PER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹500
GE P N KALINGA
₹54,800
Yes
12 Sept 2025
9 Jun 2025
14 Jul 2025
9 Jun 2025
12 Jul 2025
23 Jun 2025
9 Jun 2025 - 23 Jun 2025
Amount
M&L carrying out complete the rectification of compressors, condensers and evaporator system capacity of 3 x 90 TR Shtil hangar of Make: Blue star Model LCAX1-0375-DA, involving replacement spare, testing and commisioning including panel recommissioning, Re- assembling the compressor in all respect, refixing the same in its original position and re-connecting all disconnected lines including Leak test, pressure, nitrogen test, Vacuuming, gas filling etc, in serviceable and operational condition complete all as manufactureres with following items as given below and as directed.
Note: (i) The rate quoted shall be deemed to include for necessary filter, T&P, MS Nuts, MS Bolts, MS washers, gaskets, drier core filter etc to put into AC Plant and panels in serviceable condition, testing and commissioning complete all as directed by the Engr-in-charge. (ii) New spare parts required for replacing old parts shall be measured and paid separately against ‘Supply only’ under item No 1.03 to 1.12 here-in-after, labour rate quoted shall be deemed to have been inclusive of such items.
(iii) Any minor spares / parts /accessories not covered in the Schedule "A" Part but required for completion of job shall be provided by the contractor and the rate quoted shall be deemed to have been inclusive of such items. (iv) Servicing of control wiring in the system/ panel operating parameter microprocessor, motherboard, communication, control card etc, is deemed to be included in the quoted rate. (v) Servicing shall be carried out through OEM /authorised Agency only and test report shall be submitted in duplicate.
Supply only Gas refill R134A
Supply only temp Sensors .
Supply only Star delta main contactors (3TS49)
Supply only MCB's Sp 32 amps
Supply only Exv control board existing model.
Supply only Flow switch
Supply only Display board.
Supply only Oil filters, filter driers core
Supply only Water line, inlet outlet valves 100 mm as per exisiting size.
Supply only Expansion valve existing model.
M&L for carrying out complete the rectification of compressors, condensers and evaporator system capacity of 3 x 45 TR C2 hangar Make Blue star Model: XAC2YS-048 AR involving replacement spare, testing and commisioning Re-assembling the compressor in all respect, refixing the same in its original position and re-connecting all disconnected lines including Leak test, pressure, nitrogen test, Vacuuming, gas filling etc, in serviceable and operational condition complete all as manufacturers specification with following items as given below all as directed by Engr-in-charge.
Note: (i) The rate quoted shall be deemed to include for necessary filter, T&P, MS Nuts, MS Bolts, MS washers, gaskets, drier core filter etc to put into AC Plant and Panels in serviceable condition, testing and commisioning complete all as directed by the Engr-in-charge. (ii) New spare parts required for replacing old parts shall be measured and paid separately against ‘Supply only’ under item No 2.03 to 2.11 here-in-after, labour rate quoted shall be deemed to have been inclusive of such items.
(iii) Any minor spares / parts /accessories not covered in the Schedule "A" Part but required for completion of job shall be provided by the contractor and the rate quoted shall be deemed to have been inclusive of such items. (iv) Renewal of control wiring in the system/ panel is deemed to be included in the rate. (v) Servicing shall be carried out through OEM /authorised Agency only and test report shall be submitted in duplicate.
Supply only perssure Sensor
Supply only Temperature and pressure Gauages
Supply only V- Bets
Supply only power contactor 3 pole type MNX 32
Supply only Auxiallry Contactor Add on block MNX-A1
Supply only Auxiallry Contactor MNX-A2
Supply only Refrigerent gas 407 .
Supply only Timer existing model.
Supply only Expansion valve existing model .
Supply only compressor model No SZ18554RC
M&L for carrying out complete the rectification of compressors, condensers and evaporator system capacity of 3 x 35 TR 300 LT hangars Make Blue Star Model : XWC3S-039 AR involving replacement spare, testing and commissioning Re-assembling the compressor in all respect, refixing the same in its original position and re-connecting all disconnected lines including Leak test, pressure, nitrogen test, Vacuuming, gas filling etc, in serviceable and operational condition complete all as manufacturers with following items as given below complete all as directed by Engineer in Charge.
Note: (i) The rate quoted shall be deemed to include for necessary filter, T&P, MS Nuts, MS Bolts, MS washers, gaskets, drier core filter etc to put into AC Plant and Panels in serviceable condition, testing and commissioning complete all as directed by the Engr-in-charge. (ii) New spare parts required for replacing old parts shall be measured and paid separately against ‘Supply only’ under item No 3.03 to 4.12 here-in-after, labour rate quoted shall be deemed to have been inclusive of such items.
(iii) Any minor spares / parts /accessories not covered in the Schedule "A" Part but required for completion of job shall be provided by the contractor and the rate quoted shall be deemed to have been inclusive of such items. (iv) Servicing of control wiring in the system/ panel operating parameter microprocesor, motherboard communication, control card etc, is deemed to be included in the quoted rate. (v) Servicing shall be carried out through OEM /authorised Agency only and test report shall be submitted in duplicate.
Supply only Temperature and pressure Guages suItable for existing model.
Supply only Expansion valve existing model .
Supply only Gas refill R 22
Supply only power contactor 3 pole type MNX 12
Supply only power contactor 3 pole type MNX 18
Supply only overload relay MN2
Supply only Auxiallry Contactor MNX-A2
Supply only PCB Board Sr No 16/17-DX-3W-49
Supply only Expansion valve existing model .
Supply only compressor model No SZ18554RC
M&L carrying out complete the rectification of compressors, condensers and evaporator system capacity of 3 x 34 P 86 hangers Make Blue Star Model : XAC 3S-036 involving replacement spare, testing and commisioning Re-assembling the compressor in all respect, refixing the same in its original position and re-connecting all disconnected lines including Leak test, pressure, nitrogen test, Vacuuming, gas filling etc, in serviceable and operational condition complete all as manufacturers with following items as given below complete all as directed by Engr-in-charge.
Note: (i) The rate quoted shall be deemed to include for necessary filter, T&P, MS Nuts, MS Bolts, MS washers, gaskets, drier core filter etc to put into AC Plant and Panels in serviceable condition, testing and commissioning complete all as directed by the Engr-in-charge. (ii) New spare parts required for replacing old parts shall be measured and paid separately against ‘Supply only’ under item No 4.03 to 4.11 here-in-after, labour rate quoted shall be deemed to have been inclusive of such items.
(iii) Any minor spares / parts /accessories not covered in the Schedule "A" Part but required for completion of job shall be provided by the contractor and the rate quoted shall be deemed to have been inclusive of such items. (iv) Renewal of control wiring in the system/ panel is deemed to be included in the rate. (v) Servicing shall be carried out through OEM /authorised Agency only and test report shall be submitted in duplicate.
Supply only Temperature and pressure Gauages suitable for existing size.
Supply only Sensoner
Supply only MCCB 63 Amps 3 pole 35 KA.
Supply only contactor MNX-A2(No NC)
Supply only Auxiliary Contact MNX 9
Supply only Gas refill R 134a
Supply only PCB Board Sr No D.F. 3C-15116-59
Supply only Expansion valve existing model .
Supply only compressor model No SZ18554RC
M&L for carrying out complete the rectification of compressors, condensers and evaporator system capacity of 2x 34 P-240 AWS Make: Blue Star Model : XWC3S-039 AR involving replacement spare, testing and commisioning Re-assembling the compressor in all respect, refixing the same in its original position and re-connecting all disconnected lines including Leak test, pressure, nitrogen test, Vacuuming, gas filling etc, in serviceable and operational condition complete all as manufacturers with following items as given below complete all as directed by Engr-in-charge.
Note: (i) The rate quoted shall be deemed to include for necessary filter, T&P, MS Nuts, MS Bolts, MS washers, gaskets, drier core filter etc to put into AC Plant and Panels in serviceable condition, testing and commissioning complete all as directed by the Engr-in-charge. (ii) New spare parts required for replacing old parts shall be measured and paid separately against ‘Supply only’ under item No 5.03 to 5.11 here-in-after, labour rate quoted shall be deemed to have been inclusive of such items.
(iii) Any minor spares / parts /accessories not covered in the Schedule "A" Part but required for completion of job shall be provided by the contractor and the rate quoted shall be deemed to have been inclusive of such items. (iv) Servicing of control wiring in the system/ panel operating parameter microprocesor, motherboard communication, control card etc, is deemed to be included in the quoted rate. (v) Servicing shall be carried out through OEM /authorised Agency only and test report shall be submitted in duplicate.
Supply only Temperature and pressure Gauages suitable for existing chiller line.
Supply only Sensoner
Supply only MCCB 63 Amps 3 pole .
Supply only MCB 3 Pole of 32 Amps
Supply only Aux Contact MNX 9
Supply only Gas refill R 22
Supply only PCB Board Sr No 16/17-DX-3W-55
Supply only Expansion valve existing model .
Supply only compressor model No SZ18554RC
M&L for carrying out complete the rectification of compressors, condensers and evaporator system capacity of 2 x 34 P 84 hangers Make: Blue Star Model : XAC 3S-036 AR involving replacement spare, testing and commisioning, Re-assembling the compressor in all respect, refixing the same in its original position and re-connecting all disconnected lines including Leak test, pressure, nitrogen test, Vacuuming, gas filling etc, in serviceable and operational condition complete all as manufacturers with following items as given below complete all as specified and directed by Engr-in-charge.
Note: (i) The rate quoted shall be deemed to include for necessary filter, T&P, MS Nuts, MS Bolts, MS washers, gaskets, drier core filter etc to put into AC Plant and Panels in serviceable condition, testing and commissioning complete all as directed by the Engr-in-charge. (ii) New spare parts required for replacing old parts shall be measured and paid separately against ‘Supply only’ under item No 6.03 to 6.12 here-in-after, labour rate quoted shall be deemed to have been inclusive of such items.
(iii) Any minor spares / parts /accessories not covered in the Schedule "A" Part but required for completion of job shall be provided by the contractor and the rate quoted shall be deemed to have been inclusive of such items. (iv) Renewal of control wiring in the system/panel is deemed to be included in the rate. (v) Servicing shall be carried out through OEM /authorised Agency only and test report shall be submitted in duplicate.
Supply only Temperature and pressure Guages sutaible for existing model.
Supply only Sensor
Supply only MCCB 63 Amps 3 pole .
Supply only MCB 3 Pole of 32 Amps
Supply only Aux Contact MNX 9
Supply only contactor MNX-A2(No NC)
Supply only Gas refill R 134A
Supply only PCB Board Sr No D.F. 3C-15116-60
Supply only Expansion valve existing model .
Supply only compressor model No SZ18554RC
M&L for carrying out attending to break down of Central type AC plant of any capacity only auth OEM (M/S Bluestar) rep/team for fault finding attending repairs as and when required such as no start condition of AC plant and repairing, starting the operating parameter of the chillers checking any vibration, functioning microprocessor, flow swich calibration, HP/LP cut out swich, oil pump and oil heater the AC plant till smooth running and setting up the alignment, required parameter of all major/minor parts such as compressor microprocessor based central AC plant, general repair smooth and trouble free operation of plant to the entire satisfaction of user /dep. Attending break down inspection service report duly mentioning the date of inspection signature of service engineer and Engineer -in- charge documents shall be submitted for claming payment as required in ground as ordered by Engr-in-charge.
M&L for carrying out the descaling of the shell & Tube condensers by isolation of each condenser by providing of dummy plate for inlet & outlet connection and separation of condenser from water circulation without disturbing the operation of the AC plant, carrying out the descaling by circulation of the diluted scale removing agent organic compound type chemical of RA III / chemtex Brand at the appropriate ratio depend upon as recommended by manufacturer and the scale deposit inside copper tube by forced circulation and opening the end covers, mechanical brushing the copper tubes with nylon brushes of various size to remove complete scale, de-greasing with caustic soda solution and flushing out with fresh water, refixing all disconnected pipes lines, end covers with new rubber gasket and opening water line valves and checking of water leakages and pressure testing, apply grease to all M.S. Bolts & Nuts and put the condensers of the following capacities in operational complete all as specified and directed by Engineer - in - Charge:-
30 to 35 TR Capacity
90 TR Capacity
M&L carrying out the chemical servicing of the Air cooled condensers & cooling coils by applying the non-acidic scale removing agent to the fins area of the cooling coil, copper tubes, remove the complete scale deposit across the coil, flushing through and complete blowing out the dirt, cleaning the fan impellers, filter section, fan section and complete cleaning filters, tightening of all bolts & nuts, renew the rusted bolts & nuts checking the alignment of the drive set and testing & commissioning the air cooled condenser of AC Plant up to 90 TR complete all as specified and directed.
M/S CHANDRA ENGINEERS AND CONTRACTORS (BID ID -3339834)
ANAND ENTERPRISES AND ENGINEERS (BID ID -3356259)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .