| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L6₹189.3 CrAccepted-AOC | ₹189.3 Cr Quoted ₹175.8 Cr | L6 | Accepted-AOC BEING TECHNICALLY AND FINANCIALLY SUCCESSFUL MSE BIDDER AS PER 12 K(A) OF NIT. |
| 2 | L1₹160.5 CrRejected-Finance | ₹160.5 Cr | L1 | Rejected-Finance BID REJECTED |
| 3 | L2₹166.2 CrRejected-Finance | ₹166.2 Cr | L2 | Rejected-Finance BID REJECTED |
| 4 | L3₹166.4 CrRejected-Finance | ₹166.4 Cr | L3 | Rejected-Finance BID REJECTED |
| 5 | L4₹174.0 CrRejected-Finance | ₹174.0 Cr | L4 | Rejected-Finance BID REJECTED |
Tender Value
₹200.4 Cr
EMD Value
₹50 L
Closing Date
9 Jan 2023, 5:00 pmClosed
GENERAL MANAGER (CMC)
OFFICE OF GM (CMC), 7TH FLOOR, COAL ESTATE, CIVIL LINES, NAGPUR-440001.
OB REMOVAL AND COAL EVACUATION WORK BY HIRING OF EQUIPMENTS SUCH AS HEMM, TIPPERS, DRILLS, DOZERS, GRADERS, WATER SPRINKLERS, ETC AT BALLARPUR OC SCHEME OF BALLARPUR AREA.
2022_WCL_265254_1
WCL_HQ_CMC_51_2022-23
Open Tender
Over Burden Removal works
1430 days
BALLARPUR OC SCHEME OF BALLARPUR AREA.
Please refer Tender documents.
5 documents required · 5 mandatory
₹50 L
Yes
15 Feb 2023
17 Dec 2022
11 Jan 2023
18 Dec 2022
9 Jan 2023
18 Dec 2022
18 Dec 2022 - 31 Dec 2022
eProcurement System of Coal India Limited Created By: NAVNEET KHARE Created Date/Time: 03-Feb-2023 10:42 AM Tender Title: OB REMOVAL AND COAL EVACUATION WORK BY HIRING OF EQUIPMENTS SUCH AS HEMM, TIPPERS, DRILLS, DOZERS, GRADERS, WATER SPRINKLERS, ETC AT BALLARPUR OC SCHEME OF BALLARPUR AREA. Tender ID: 2022_WCL_265254_1
Tender Inviting Authority: GENERAL MANAGER (CMC), WCL.
Name of Work: NIT No:
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 GRN CONSTRUCTIONS PVT LTD(GSTN-27AADCG1206C1ZB) 1697930570.00 18.50 2012047725.45 Two Hundred One Crore Twenty Lakh Fourty Seven Thousand Seven Hundred and Twenty Five
2.00 SIDDHESWARI INFRASTRUCTURE(GSTN-24ABMFS3587R1Z5) 1697930570.00 3.51 1757527933.01 One Hundred Seventy Five Crore Seventy Five Lakh Twenty Seven Thousand Nine Hundred and Thirty Three
3.00 M/s HARI RAM GODARA(GSTN-08ACXPG1575H1Z6) 1697930570.00 2.49 1740209041.19 One Hundred Seventy Four Crore Two Lakh Nine Thousand Fourty One
4.00 SHRI HARI KRISHNA INFRASTRUCTURE(GSTN-27ADEPV9153E1Z8) 1697930570.00 -2.10 1662274028.03 One Hundred Sixty Six Crore Twenty Two Lakh Seventy Four Thousand Twenty Eight
5.00 GK Associates(GSTN-22AASFG7625D1ZF) 1697930570.00 4.96 1782147926.27 One Hundred Seventy Eight Crore Twenty One Lakh Fourty Seven Thousand Nine Hundred and Twenty Six
6.00 RPL-KEM(JV)(GSTN-NA) 1697930570.00 -1.97 1664481337.77 One Hundred Sixty Six Crore Fourty Four Lakh Eighty One Thousand Three Hundred and Thirty Seven
7.00 SKC CMPL JOINT VENTURE(GSTN-NA) 1697930570.00 -5.50 1604544388.65 One Hundred Sixty Crore Fourty Five Lakh Fourty Four Thousand Three Hundred and Eighty Eight
8.00 M/s. GVRIIPL-HCPL JV(GSTN-NA) 1697930570.00 2.45 1739529868.97 One Hundred Seventy Three Crore Ninty Five Lakh Twenty Nine Thousand Eight Hundred and Sixty Eight
Lowest Amount Quoted BY: SKC CMPL JOINT VENTURE(1604544388.65)
BOQ Summary Details Tender Title: OB REMOVAL AND COAL EVACUATION WORK BY HIRING OF EQUIPMENTS SUCH AS HEMM, TIPPERS, DRILLS, DOZERS, GRADERS, WATER SPRINKLERS, ETC AT BALLARPUR OC SCHEME OF BALLARPUR AREA. Tender ID: 2022_WCL_265254_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 SKC CMPL JOINT VENTURE 1604544388.65 L1
2 SHRI HARI KRISHNA INFRASTRUCTURE 1662274028.03 L2
3 RPL-KEM(JV) 1664481337.77 L3
4 M/s. GVRIIPL-HCPL JV 1739529868.97 L4
5 M/s HARI RAM GODARA 1740209041.19 L5
6 SIDDHESWARI INFRASTRUCTURE 1757527933.01 L6
7 GK Associates 1782147926.27 L7
8 GRN CONSTRUCTIONS PVT LTD 2012047725.45 L8
Preferential Bidder Non-Itemwise BOQ Summary Details Tender Title: OB REMOVAL AND COAL EVACUATION WORK BY HIRING OF EQUIPMENTS SUCH AS HEMM, TIPPERS, DRILLS, DOZERS, GRADERS, WATER SPRINKLERS, ETC AT BALLARPUR OC SCHEME OF BALLARPUR AREA. Tender ID: 2022_WCL_265254_1
Sheet Name Sl.No Bidder Name Amount Difference Amount from L1 Difference Percentage from L1 Tolerance Percentage Preference Category
BoQ1 1 SKC CMPL JOINT VENTURE 1604544388.65
2 SHRI HARI KRISHNA INFRASTRUCTURE 1662274028.03 57729639.38 3.60% 15.00% MSME
4 M/s. GVRIIPL-HCPL JV 1739529868.97
5 M/s HARI RAM GODARA 1740209041.19
6 SIDDHESWARI INFRASTRUCTURE 1757527933.01 152983544.36 9.53% 15.00% MSME
8 GRN CONSTRUCTIONS PVT LTD 2012047725.45
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.07 MB
Download all tender documents and submit your bid