Tender Value
₹50.0 L
EMD Value
₹99,932
Closing Date
30 Apr 2026, 4:00 pmClosed
Ex. Engineer R and B Division Shopian
RnB division shopian
Hirpora Dachnu Road
2026_PWDJK_308336_1
02/473-82/RnB/SPN/e-tender of 21-04-2026
Open Tender
Civil Works
Percentage
120 days
Shopian
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,100
Ex. Engineer R and B Division Shopian
₹99,932
21 Apr 2026
21 Apr 2026
2 May 2026
22 Apr 2026
30 Apr 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres: Ordinary Rock | - | Cum | 0.2 | - |
| 2 | Providing and laying in position cement concrete 1:4:8 (1 Cement:4 Corase sand: 8 grade stone aggregate 40 mm nominal size crushed including curing but excluding the cost of centring and shuttering. All work upto plinth level including all carriages complete | - | Cum | 0.2 | - |
| 3 | Providing and laying in position of reinforced cement concrete 1:1.5:3 (1 Cement, 1.5 Corase sand: 3 grade stone aggregate 20mm nominal size crushed including curing but excluding the cost of centering, shuttering, finishing and reinforcement all work upto plinth level including all carriage complete | - | Cum | 0.4 | - |
| 4 | Reinforcement for R.C.C. work including straightening,
cutting, bending, placing in position and binding all
complete Thermo-Mechanically Treated bars of grade Fe 500D or more. Inculding all carriages complete | - | Kgs | 0.8 | - |
| 5Centering and shuttering (fresh kit ply) including strutting, propping etc. and removal of form work including applying of shuttering oil: | |||||
| 5.01 | Foundations, footings, bases of columns etc. | - | Sqm | 0.8 | - |
| 5.02 | Walls (Any Thickness) incluing attached plasters, buttress etc | - | Sqm | 0.8 | - |
| 6 | Providing, supplying and Making knitted wire crates 4mm thick of approved mesh size including weaving binding sides and partitions, and binding top after filling including cost of filling, stones (nallah stones hand packed) and weaving materials including all costs and carriages of stones, weaving materials etc complete | 0.8 | Cum | 1 | ₹0.8 |
| 7 | Providing and laying River Bed Material ( RBM) including sorting , spreading in uniform layers on existing surface and consolidation each deposited layer with Vibrator Roller to the required gradient and camber with all carriages to site of work including loading and unloading complete (available at site) | - | Cum | 0.6 | - |
| 8 | Engagement of back and hoe loader for diversion of nallah during the period of work execution, redirecting it to its original path after completion of work and dewatering process etc. all as per the directions of engineer Incharge Complete (*Subject to actual) | - | Hours | 0.6 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_999356.xls
BOQ • 0.30 MB
Corrigendum.pdf
PDF • 0.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .