Loading…
Tender Value
₹1.4 L
EMD Value
₹1,400
Closing Date
19 Jun 2026, 6:00 pmClosed
dharmesh g. rajyaguru (Executive Engineer)
Demolition of R.C.C. E.S.R and Sump at various Headworks and sub Headworks under MMJ RWSS. Tal: Dhrol jodiya Dist.: Jamnagar
313185
15/2026-27
Open
Water Supply/ Sanitation Works
Works
Jamnagar
6 documents required · 6 mandatory
₹600
Executive Engineer, Public Health Works Division Jamnagar
₹1,400
10 Jun 2026
10 Jun 2026
10 Jun 2026
19 Jun 2026
10 Jun 2026
more or less
ESR Cap. - 1.00 Lac. Lit. x 6.00 Mt. Location- Hajnali HW
Demolition including stacking of serviceable materilas and disposal of unserviceable
materials with all lead and lift. (i) R.C.C. work
Salvagable value of reinforcement steel retrieved from RCC OHT structure, (ie)
Column, Beams, Slab, Vertical wall etc, taken away the materials etc. complete.
reinforcement (Scrap Material). Taking Density as 7850 kg/m3
2567.35 Taking 0.5% Steel Quantity of Demolition R.C.C Quantity as per item no.1 -25.00 KG -64,183.75
ESR Cap. - 2.50 Lac. Lit. x 20.00 Mt. Location- Hajnali HW
Demolition including stacking of serviceable materilas and disposal of unserviceable
materials with all lead and lift. (i) R.C.C. work
Salvagable value of reinforcement steel retrieved from RCC OHT structure, (ie)
Column, Beams, Slab, Vertical wall etc, taken away the materials etc. complete.
reinforcement (Scrap Material). Taking Density as 7850 kg/m3
4609.52 Taking 0.5% Steel Quantity of Demolition R.C.C Quantity as per item no. 3 -25.00 KG -1,15,238.00
SUMP Cap. - 5.00 Lac. Lit. Hajnali HW
Demolition including stacking of serviceable materilas and disposal of unserviceable
materials with all lead and lift. (i) R.C.C. work
Salvagable value of reinforcement steel retrieved from RCC OHT structure, (ie)
Column, Beams, Slab, Vertical wall etc, taken away the materials etc. complete.
reinforcement (Scrap Material). Taking Density as 7850 kg/m3
660.97 Taking 0.5% Steel Quantity of Demolition R.C.C Quantity as per item no. 5 -25.00 KG -16,524.25
Refilling the pipeline trenches incl. ramming, watering, consolidating desposal of
outside including all lead
SUMP Cap. - 3.00 Lac. Lit. Hajnali HW
Item No.
Demolition including stacking of serviceable materilas and disposal of unserviceable
materials with all lead and lift. (i) R.C.C. work
Item No.
Salvagable value of reinforcement steel retrieved from RCC OHT structure, (ie)
Column, Beams, Slab, Vertical wall etc, taken away the materials etc. complete.
reinforcement (Scrap Material). Taking Density as 7850 kg/m3
374.45 Taking 0.5% Steel Quantity of Demolition R.C.C Quantity as per item no. 8 -25.00 Cu.M. -9,361.25
Item No.10
Refilling the pipeline trenches incl. ramming, watering, consolidating desposal of
outside including all lead
Total Rs.
I/We am/are Willing to carry out the Work at % Above/Below_______________________________________________
____________________________________________________________________ (should be written in words and figure) i.e. Above/Below
estimated rate sanctioned above.
Sign Of Contractor
DEPUTY EXECUTIVE ENGINEER
P.H.S SUB DIVISION
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
sch A.pdf
sch b.pdf
price bid.pdf
tech bid.pdf
technical specification.pdf
gcc.pdf
Vol II GCC Part - 2 2026.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .