Tender Value
₹31.9 L
EMD Value
₹32,000
Closing Date
25 Sept 2026, 6:00 pmClosed
Executive Engineer
Consultancy work for survey investigation, design including necessary approval of DTS and DTP for Right & Left Bank Main canal Network of Pigut Irrigation schemes Di.- Bharuch
343789
19 of 202627
Open
Civil - All
Works
Narmada
8 documents required · 8 mandatory
₹1,500
Executive Engineer, Irrigation Project Division 4, Rajpipla
₹32,000
11 Sept 2026
11 Sept 2026
11 Sept 2026
25 Sept 2026
11 Sept 2026
BILL OF QUANTITIES
BILL OF QUANTITIES
1. The bill of Quantities shall be read in conjunction with the Instructions to Bidder,
Conditions of Contract, Technical Specifications and Drawings.
2. The quantities given in the Bill of Quantities are estimated and provisional, and
are given to provide a common basis for bidding. The basis of payment will be the
actual quantities of work ordered and carried out, as measured by the Contractor
and verified by the Engineer and valued at the rates and prices tendered in the
priced Bill of Quantities, where applicable, and otherwise at such rates and prices
as the Engineer may fix within the terms of the Contract.
3. The rates and prices tendered in the priced Bill of Quantities shall, except in so far
as it is otherwise provided under the Contract, include all constructional plant,
layout, supervision, materials, erection, maintenance, insurance, profit, taxes and
duties, together with all general risks, liabilities and obligations set out or implied
in the Contract.
4. The rates and prices shall be quoted entirely in Indian Currency.
5. A rate or prices shall be entered against each item in the Bill Quantities, whether
quantities are stated or not. The cost of Items against which Contractor has failed
to enter a rate or price shall be deemed to be covered by other rates and prices
entered in the Bill of Quantities (in case of Item rate contract).
6. The whole cost of complying with the provisions of the Contract shall be included
in the items provided in the priced Bill of Quantities, and where no Items are
provided the cost shall be deemed to be distributed among the rates and prices
entered for the related items of Work.
7. General direction and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. References to the relevant
sections of the contract documentation shall be made before entering rates or
prices against each item in the Bill of Quantities.
8. The method of completed work of payment shall be in accordance with the
specification for Road and Bridge works. For building works specifications for
building are to be followed.
9. Errors will be corrected by the Employer for any arithmetic errors pursuant to
Clause-29 of the Instructions to Bidder.
10. Rock is defined as all materials which, in the opinion of the Engineer, required
blasting, or the use of metal wedges and sledgehammers, or the use of
compressed air drilling for its removal, and which cannot be extracted by ripping
with a tractor of at least 150 kw with a single rear mounted heavy duty ripper.
BILL OF QUANTITIES
(A) Percentage Rate Tender ( Upto INR 50 Cr.)
Item Description of Item (with brief Quantity Unit Rate In Amount
No specification and reference to book figures
of specifications)
1 Taking the levels for connecting and
checking of B.M. by double leveling
method including purchase of materials
like lime, usinG bags, colour, etc.
preparing technical documents, plan with 19.68 Km. 1137.85
level, F.B, prints transportation charges of
vehiclE, boat etc. and charges of engineer
survey person etc. complete in wet and
slushy condition.
2 Surveying of Canals / Drains for L/S &
C/S @ 30 meter or as required interval
by suitable leveling instrument including
chaining, ranging, leveling, connecting
benchmark, plotting existing and designed
C/S with calculation of earthwork with
preparing Fieldbook and digitized drawing
etc. complete and submission in Hard
copy and Soft copy.
2a (A) For Main Canals/ Branch Canals/
Main Drains. 10.80 Km. 6867.00
2b (B) For Distributary/Minors/Sub-minors/
Lateral and sub-lateral Drains. 8.88 Km. 5084.00
3 Carrying out Sub soil investigation for
Soil Bearing Capacity test with machine
drilling of bore holes at specified location
including collection of samples, laboratory 275.00 Mtr. 8221.50
testing, submitting report including
transport and others. (Unit Rate carried out
for 10 m. depth of Bore).
4 Preparing Hydraulics And Structure
Design Drawing as per relevant codal
provisions And Preparing Estimate of
V.R.B, Syphon, Aqueduct, HR and CR
Gate, outlet Provided by Engineer in 1 Job 790031.50
Charge with Submission The Same
Including Transportation, Labour Charge
etc Complete. (Excluding Soil Test) for (
109 nos of structure.)
I/We/am/are willing to carryout the work at… ................. % above/below percent (Should
Be written in figures and words) of the estimated rate mentioned above. Amount of my/our
tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………%below Add………%Above
In words In words
(B) For Item Rate Tender (For above INR 50 Cr.):
Item Description of Item Quantity Unit Rate Amount
No (with brief specification
and reference to book In In
of specifications) figures Words
(A)Total Tendered Amount
(B)Rebate on above tendered amount (if any) % (in figure)………………………………
(C)Net Tendered Amount (A-B) (in figure)………………………………
1 The Contractor shall exhibit a board with brief details of work as directed by the
Engineer-In-Charge for which no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e.1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as
per Govt. as stated in S.O.R .therefore in R.C.C. items where there is a change as per
actual mix design the cost of difference of cement consumption have been deducted
from the rate of original item at the rate of input rate mentioned in all the tender.
Sign Of Contractor Deputy Executive Engineer Executive Engineer
Dholi Irrigation Subdivision Irrigation Project Division No.4
Rajpardi Rajpipla
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
NIT pigut con.pdf
SBD pigut consultancy.pdf
tech. Specification.pdf
BOQ Pigut RBMC Consultancy.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .