Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-Finance | L1 | Accepted-Finance Lowest bidder | |
| 2 | Rejected-Technical | - | Rejected-Technical L2 |
| Sl No | Description | Qty | Unit | NITHIN.P.JOHN L1 | Anish L2 |
|---|---|---|---|---|---|
| 1.00Appendix.1: Reactive maintenance | |||||
| 1.00 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 10.8 | cum | 2,763 ₹29,840.4 Lowest | 3,000 ₹32,400 |
| 1.00 | 55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface. | 10.8 | cum | 6,035 ₹65,178 Lowest | 7,000 ₹75,600 |
| 1.00 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 2,661.5 | sqm | 13.26 ₹35,291.49 Lowest | 15 ₹39,922.5 |
| 1.00 | OD195525/2025-2026:Close graded premix surfacing/mixed seal surfacing :-case I, Type -A by manual means Providing, laying and rolling of close graded premix surfacing material of 20mm thickness composed of 11.2mm to .09mm(Type:A) aggregates using penetration graded bitumen using VG30 to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, and finishing to required level and grade. | 2,661.5 | sqm | 317 ₹8,43,695.5 Lowest | 340 ₹9,04,910 |
| 1.00 | 10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor | 1,000 | sqm | 32 ₹32,000 Lowest | 49 ₹49,000 |
| 1.01 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 0.2 | Hectare | 63,572 ₹12,714.4 Lowest | 70,000 ₹14,000 |
| 2.00Appendix B-Premonsoon work | |||||
| 2.00 | 2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area | 0.34 | Hectare | 63,572 ₹21,614.48 Lowest | 70,000 ₹23,800 |
| 2.00 | OD195667/2025-2026:Engaging wood cutter for cutting trees and branches of trees standing in dangerous condition as per the direction of dept.officers | 6 | Day | 1,413 ₹8,478 Lowest | 1,500 ₹9,000 |
Tender Value
₹11.0 L
EMD Value
₹27,537
Closing Date
7 Jan 2026, 3:30 pmClosed
Assistant Executive Engineer
Office of the Assistant Exe.Engineer, PWD Roads Sub Division, Adoor
Re-Tender GENERAL-RM/2025-26- RC 2- Phase 2- Cluster II- Zone 4- One year Running Contract for one PWD Road under Road section Adoor in Pathanamthitta District- one road stretch for a length of 3.00km
2025_PWD_822451_2
PWD/RB/TR/20251/2025
Open Tender
Civil Works - Roads
Item Rate
Adoor
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹27,537
Yes
29 Sept 2026
30 Dec 2025
9 Jan 2026
30 Dec 2025
7 Jan 2026
30 Dec 2025
Appendix.1: Reactive maintenance
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.8.a:Filling up pot holes (cut and formed to regular shapes and all loose and defective materials removed) after supplying a prime coat of hot bitumen using 36mm departmental broken stone and compacting with power roller to get a compact surface.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD195525/2025-2026:Close graded premix surfacing/mixed seal surfacing :-case I, Type -A by manual means Providing, laying and rolling of close graded premix surfacing material of 20mm thickness composed of 11.2mm to .09mm(Type:A) aggregates using penetration graded bitumen using VG30 to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, and finishing to required level and grade.
10.3:Maintenance of Earth Shoulder (stripping excess soil) from the shoulder surface to achieve the approved level and compacting with plate compactor
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
Appendix B-Premonsoon work
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
OD195667/2025-2026:Engaging wood cutter for cutting trees and branches of trees standing in dangerous condition as per the direction of dept.officers
OD195668/2025-2026:Hire for rope
OD195669/2025-2026:Hire charges for machine saw(including petrol charge)
OD195670/2025-2026:Supplying Shelmac/ready mix bitumen pot hole filler
OD195708/2025-2026:Pickup for conveying shelmac
OD195671/2025-2026:Engaging Hydraulic excavator of 1cum bucket capacity
OD195672/2025-2026:Engaging tipper of 5cum capacity with driver and fuel for assisting excavator, other miscellaneous activities etc complete
OD195693/2025-2026:Engaging man coolies for specific works as directed by the officer at site
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1382540.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
NIT.pdf
Tender Documents • 0.03 MB
EPAYMENT.pdf
Other Document • 0.37 MB
FORM_OF_TENDER.pdf
Other Document • 0.17 MB
SBDcluster.pdf
Tender Documents • 1.64 MB
AFFIDAVIT.pdf
Other Document • 1.32 MB
BOQ_1382540.xls
BOQ • 0.31 MB
IntegrityPACTCERTIFICATE.pdf
Other Document • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .