| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.0 LAccepted-Finance WARD NO 5 TENGAPARA P O P S DIST KOKRAJHAR PIN 783370 | KOKRAJHAR | ASSAM | 783370 | ₹25.0 L | L1 | Accepted-Finance Lowest quoted amount |
| 2 | L2₹25.1 L+₹11,779.20 (0.47%)Rejected-Finance KOKRAJHAR WARD NO 8 P O P S KOKRAJHAR DIST KOKRAJHAR BTC ASSAM PIN 783370 | KOKRAJHAR | KOKRAJHAR | ASSAM | 783370 | ₹25.1 L+₹11,779.20 (0.47%) | L2 | Rejected-Finance High quoted amount |
| 3 | L3₹25.2 L+₹19,259.73 (0.77%)Rejected-Finance C O HARU CH DEY KACHUGAON P O P S KACHUGAON DIST KOKRAJHAR BTC ASSAM PIN 783370 | KACHUGAON | KOKRAJHAR | ASSAM | 783370 | ₹25.2 L+₹19,259.73 (0.77%) | L3 | Rejected-Finance Highest quoted amount |
| Sl No | Description | Qty | Unit | SRI BIBEKANANDA DEY L3 | Smt Guni Brahma L2 | Gautam Brahma L1 |
|---|---|---|---|---|---|---|
| 1.00 | (1/2.1) Earth work in excavation by mechanical means (Hydraulic excavator) manual means in foundation trenches or drains (Not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m | 77.76 | cum | 286.85 ₹22,305.46 Lowest | 286.85 ₹22,305.46 Lowest | 286.85 ₹22,305.46 Lowest |
| 2.00 | (2/16.12.1)Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete. | 392.64 | Sqm | 607.2 ₹2,38,411.01 Lowest | 637.2 ₹2,50,190.21 | 607.2 ₹2,38,411.01 Lowest |
| 3.00 | 3/4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level | 9.05 | cum | 6,833.4 ₹61,842.27 Lowest | 6,833.4 ₹61,842.27 Lowest | 6,833.4 ₹61,842.27 Lowest |
| 4.00 | (5.22.) Steel reinforcement of R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level 5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D | 1,925.98 | Kg | 116.65 ₹2,24,665.57 | 106.65 ₹2,05,405.77 Lowest | 106.65 ₹2,05,405.77 Lowest |
| 5.00 | (5.22. A) Steel reinforcement of R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level 5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D | 1,592.91 | Kg | 89.65 ₹1,42,804.38 Lowest | 89.65 ₹1,42,804.38 Lowest | 89.65 ₹1,42,804.38 Lowest |
| 6.00 | (5.9) Centering and shuttering including strutting, propping etc. and removal of form for 5.9.1 Foundations, footings, bases of column etc. for mass. | 184.4 | Sqm | 387.95 ₹71,537.98 Lowest | 387.95 ₹71,537.98 Lowest | 387.95 ₹71,537.98 Lowest |
| 7.00 | (5.9.6) Column, Pillars, piers, Abutment, Posts and struts column | 115.92 | Sqm | 884.25 ₹1,02,502.26 Lowest | 884.25 ₹1,02,502.26 Lowest | 884.25 ₹1,02,502.26 Lowest |
| 8.00 | (5.9.5) Lintels, beams, plinth beams, girders, bressumers and cantilevers Top Beam | 110.88 | Sqm | 608.35 ₹67,453.85 Lowest | 608.35 ₹67,453.85 Lowest | 608.35 ₹67,453.85 Lowest |
| 9.00 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work upto plint level… | 19.47 | cum | 8,364.2 ₹1,62,850.97 Lowest | 8,364.2 ₹1,62,850.97 Lowest | 8,364.2 ₹1,62,850.97 Lowest |
| 10.00 | (5.2.2) Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, column, pillars, piers, abutment, posts and struts etc. above plinth level upto floor five level, excluding cost of centering, shuttering, finishing and reinforcement: | 15.55 | cum | 10,685.05 ₹1,66,152.53 Lowest | 10,685.05 ₹1,66,152.53 Lowest | 10,685.05 ₹1,66,152.53 Lowest |
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
25 Jun 2026, 12:00 pmClosed
BDO Kokrajhar
Block Development Officer Kokrajhar Development Block Titaguri
Construction of Market Shed at Nayekgaon Bazar under North Nayekgaon VCDC
2026_BoTC_52615_1
6th ASFC-08 of 2025-26
Open Tender
Civil Works
Works
Nayekgaon Bazar
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
₹50,000
Yes
30 Jun 2026
4 Jun 2026
25 Jun 2026
4 Jun 2026
25 Jun 2026
4 Jun 2026
4 Jun 2026 - 25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | (1/2.1) Earth work in excavation by mechanical means (Hydraulic excavator) manual means in foundation trenches or drains (Not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m | 77.76 | cum | 8,384 | ₹6,51,939.84 |
| 2 | (2/16.12.1)Dry brick pitching half brick thick in drains including supply of bricks and preparing the surface complete. | 392.64 | Sqm | 8,384 | ₹32,91,893.76 |
| 3 | 3/4.1.5 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level | 9.05 | cum | 8,384 | ₹75,875.2 |
| 4 | (5.22.) Steel reinforcement of R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level 5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D | 1,925.98 | Kg | 8,384 | ₹1,61,47,416.32 |
| 5 | (5.22. A) Steel reinforcement of R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level 5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D | 1,592.91 | Kg | 8,384 | ₹1,33,54,957.44 |
| 6 | (5.9) Centering and shuttering including strutting, propping etc. and removal of form for 5.9.1 Foundations, footings, bases of column etc. for mass. | 184.4 | Sqm | 8,384 | ₹15,46,009.6 |
| 7 | (5.9.6) Column, Pillars, piers, Abutment, Posts and struts column | 115.92 | Sqm | 8,384 | ₹9,71,873.28 |
| 8 | (5.9.5) Lintels, beams, plinth beams, girders, bressumers and cantilevers Top Beam | 110.88 | Sqm | 8,384 | ₹9,29,617.92 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement- All work upto plint level… | 19.47 | cum | 8,384 | ₹1,63,236.48 |
| 10 | (5.2.2) Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, column, pillars, piers, abutment, posts and struts etc. above plinth level upto floor five level, excluding cost of centering, shuttering, finishing and reinforcement: | 15.55 | cum | 8,384 | ₹1,30,371.2 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
FOB.pdf
Additional Documents • 0.47 MB
SBD.pdf
Tender Documents • 5.65 MB
BOQ_83100.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .