Loading…
Loading…
Tender ID
Tender Value
₹53.0 L
EMD Value
₹1.1 L
Closing Date
7 Apr 2026, 4:00 pmClosed
Executive Engieer RnB Division Kulgam
Executive Engieer RnB Division Kulgam
Construction of Higher Secondary Razloo Kund Devsar (Biology Room)
2026_PWDJK_307047_2
123/2025-26/RnB/Kul/11326-37 dated 31-03-2026
Open Tender
Civil Works
Percentage
180 days
Kulgam
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,600
MH 0059
₹1.1 L
31 Mar 2026
31 Mar 2026
8 Apr 2026
31 Mar 2026
7 Apr 2026
31 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : i/c back filling of same inside plinth and clearance of site after completion of work complete. | |||||
| 2Providing and laying stone soling by way of Nallah boulders size on level ( Hand packed ) Watering ,ramming complete below foundation & rooms including carriage of material. | |||||
| 3Providing & laying in position cement concrete of specified grade excld. The cost of centring and shuttering all work upto plinth level(1:4:8 coarse sand 40mm nominal size crushed stone agg.) | |||||
| 4P/L in position specified grade of reinforced cement cencrete excld. The cost of centring, shuttering, finishing and reinforecement-All work upto plinth level. 1:1.5:3 graded stone agg. 20mm nominal size | |||||
| 5Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°,landings, balconies, shelves, chajjas, lintels, bands,plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement with 1:1.5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate | |||||
| 6Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:(1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | |||||
| 7Centring and shuttering of kit ply including proping, strutting etc & removal of the same up to plinth level./Foundations, footings, bases for column. | |||||
| 8Centring and shuttering of kit ply including proping, strutting etc & removal of the same for Lintel, beams, plinth beams, girders, bressumers and cantilevers. | |||||
| 9Centring and shuttering of kit ply including proping, strutting etc & removal of the same for Suspended floors, roofs, landings, balconies and access platforms | |||||
| 10Brick work with FPS bricks of class designation 75 in foundtion & plinth in cement mortar 1:6 (1 cement, 6 coarse sand) including Extra over brick work in superstructure above plinth level upto floor five level including curing. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_996430.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .