| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.5 Cr+₹9.4 L (6.69%)Rejected-AOC | ₹1.5 Cr+₹9.4 L (6.69%) | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Vijaykumar P L1 | ELIAS SUNNY L2 |
|---|---|---|---|---|---|
| 1.00Building Proper | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 1,350 | sqm | 15 ₹20,250 Lowest | 15 ₹20,250 Lowest |
| 1.00 | 23.4.2:Supplying, assembling, lowering and fixing in vertical position in bore well unplasticized PVC medium well screen (RMS) pipes with ribs, conforming to IS: 12818, including hire & labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer - in-charge150 mm nominal size dia | 60 | metre | 790 ₹47,400 Lowest | 850 ₹51,000 |
| 1.00 | 23.1.1.1:Boring / drilling bore well of required dia for casing / strainer pipe, by suitable method prescribed in IS: 2800 ( part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools plants & machineries required for the job, all complete as per direction of Engineer - in- Charge, upto 90 metre depth below ground level.
All types of soil300 mm dia | 60 | metre | 640 ₹38,400 Lowest | 720 ₹43,200 |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 151.69 | cum | 300 ₹45,507.6 Lowest | 300 ₹45,507.6 Lowest |
| 1.00 | OD261467/2025-2026:Dry rubble masonry with hard stone in foundation and plinth including levelling cost of bond stone ,through stone , labour charges etc complete . | 15.23 | cum | 4,648 ₹70,779.74 | 4,000 ₹60,912 Lowest |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 133.56 | sqm | 250 ₹33,390 Lowest | 320 ₹42,739.2 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 687.98 | sqm | 650 ₹4,47,186.35 Lowest | 700 ₹4,81,585.3 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 140.66 | sqm | 800 ₹1,12,524.8 Lowest | 900 ₹1,26,590.4 |
| 1.01 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | 87 | sqm | 800 ₹69,600 Lowest | 900 ₹78,300 |
Tender Value
₹1.6 Cr
EMD Value
₹50,000
Closing Date
11 Mar 2026, 11:30 amClosed
Superintending Engineer, PWD Building Central
O/o Superintending Engineer, PWD Building Central Circle, Thrissur
Construction of Ground Floor, First Floor and Stair room covering Grid line 1 to 4 is included in this Phase of construction.
2026_PWD_841765_1
PWD/BLDG/TR/23820/2025_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
360 days
Amalanagar
Please refer Tender documents.
12 documents required · 12 mandatory
₹6,508
Yes
₹50,000
Yes
11 Aug 2026
28 Feb 2026
13 Mar 2026
28 Feb 2026
11 Mar 2026
28 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Building Proper | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | 23.4.2:Supplying, assembling, lowering and fixing in vertical position in bore well unplasticized PVC medium well screen (RMS) pipes with ribs, conforming to IS: 12818, including hire & labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer - in-charge150 mm nominal size dia | - | metre | - | - |
| 1.003 | 23.1.1.1:Boring / drilling bore well of required dia for casing / strainer pipe, by suitable method prescribed in IS: 2800 ( part I), including collecting samples from different strata, preparing and submitting strata chart/ bore log, including hire & running charges of all equipments, tools plants & machineries required for the job, all complete as per direction of Engineer - in- Charge, upto 90 metre depth below ground level.
All types of soil300 mm dia | - | metre | - | - |
| 1.004 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.8 | cum | - | - |
| 1.005 | OD261467/2025-2026:Dry rubble masonry with hard stone in foundation and plinth including levelling cost of bond stone ,through stone , labour charges etc complete . | 1 | cum | - | - |
| 1.006 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | - | sqm | - | - |
| 1.007 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 0.6 | sqm | - | - |
| 1.008 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 0.4 | sqm | - | - |
| 1.009 | 5.9.19:Centering and shuttering including strutting, etc. and removal of form for:Weather shade, Chajjas, corbels etc., including edges | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.05 MB
1PRELIMINARYAGREEMENT.pdf
Tender Documents • 0.51 MB
2Affidavit.pdf
Tender Documents • 0.29 MB
3FormVI.pdf
Tender Documents • 0.18 MB
epay.pdf
Tender Documents • 0.19 MB
5Instructionstobidders.pdf
Tender Documents • 0.69 MB
6GST.pdf
Tender Documents • 0.43 MB
7Integritypact.pdf
Tender Documents • 0.01 MB
viewsbd.pdf
Tender Documents • 3.46 MB
BOQ_1419794.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .