Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.9 LAccepted-Finance | ₹2.9 L | 1 | Accepted-Finance As per PQR |
| 2 | 2₹3.0 L+₹11,928 (4.11%)Accepted-Finance | ₹3.0 L+₹11,928 (4.11%) | 2 | Accepted-Finance As per PQR |
| 3 | 3₹3.0 L+₹12,000 (4.14%)Accepted-Finance | ₹3.0 L+₹12,000 (4.14%) | 3 | Accepted-Finance As per PQR |
| 4 | 4₹3.4 L+₹50,110 (17.3%)Accepted-Finance | ₹3.4 L+₹50,110 (17.3%) | 4 | Accepted-Finance As pwer PQR |
| 5 | 5₹3.6 L+₹70,110 (24.2%)Accepted-Finance | ₹3.6 L+₹70,110 (24.2%) | 5 | Accepted-Finance As per PQR |
| Sl No | Description | Qty | Unit | Stockwell Solar Services Private Limited L6 | KCC Buildcon Pvt. Ltd. L16 | Oriana Power Private Limited L13 | Gawar Construction Limited L11 | Manda Projects Pvt Ltd L10 | SALASAR TECHNO ENGINEERING LIMITED L14 | Diwakar Renewable and Infra Pvt. Ltd. L6 | BHAGWATI LACTO VEGETARIAN EXPORTS PVT LTD L14 | Micromax informatics Ltd L9 | VIVIANA POWER TECH LIMITED L8 | RAMA REFLECTION INDIA PRIVATE LIMITED L2 | Agastya Green Energy Limited L17 | Power Grid Corporation of India Limited L21 | MECPOWER SOLUTIONS LIMITED L3 | OPG Power Generation Private Limited L14 | Kundan Green Energy Private Limited L13 | RKCPL Limited L7 | Onward Solar Power Private Limited L18 | Dilip Buildcon Limited L20 | Patanjali Ayurved Ltd L1 | Apraava Energy Private Limited L15 | ULTRAVIBRANT SOLAR ENERGY PRIVATE LIMITED L4 | Solar91 Cleantech Limited L5 | LC Infra Projects Pvt Ltd L22 | Sun Drop Energia Private Limited L14 | INSOLATION GREEN ENERGY PVT LTD L12 | Karamtara Green Energy Limited L19 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Charges for Battery Energy Storage System | 1 | BESS | 3,65,000 ₹3,65,000 | 4,25,111 ₹4,25,111 | 4,12,000 ₹4,12,000 | 4,00,000 ₹4,00,000 | 3,99,200 ₹3,99,200 | 4,20,000 ₹4,20,000 | 3,65,000 ₹3,65,000 | 4,20,000 ₹4,20,000 | 3,98,000 ₹3,98,000 | 3,95,000 ₹3,95,000 | 3,01,818 ₹3,01,818 | 4,30,000 ₹4,30,000 | 4,90,000 ₹4,90,000 | 3,01,890 ₹3,01,890 | 4,20,000 ₹4,20,000 | 4,12,000 ₹4,12,000 | 3,74,500 ₹3,74,500 | 4,33,000 ₹4,33,000 | 4,85,100 ₹4,85,100 | 2,89,890 ₹2,89,890 Lowest | 4,23,300 ₹4,23,300 | 3,40,000 ₹3,40,000 | 3,60,000 ₹3,60,000 | 5,00,000 ₹5,00,000 | 4,20,000 ₹4,20,000 | 4,10,000 ₹4,10,000 | 4,65,000 ₹4,65,000 |
Tender Value
Refer Docs
EMD Value
₹42 Cr
Closing Date
3 Nov 2025, 4:00 pmClosed
CE (NPP)
6th Floor, LIC Investment Building, DC-03 Lalkothi Jaipur-302005
Setting up of 500 MW/2000 MWh Standalone Battery Energy Systems under Tariff Based Global Competitive Bidding in Rajasthan with Viability Gap Funding Support under BOO model
2025_RRVUN_491949_1
TN-07/2025-26
Global Tenders
Supply, Erection and Commissioning
Item Rate
Different GSS of RVPN, refer Rfs
Refer RfS
2 documents required · 2 mandatory
₹5.9 L
Rajasthan Rajya Vidyut Utpadan Nigam Limited
₹42 Cr
Jaipur
25 Nov 2025
8 Aug 2025
4 Nov 2025
8 Aug 2025
3 Nov 2025
8 Aug 2025
8 Aug 2025 - 25 Aug 2025
26 Aug 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for Battery Energy Storage System | 1 | BESS | - | - |
stage.html
html • 0.11 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.50 MB
SLDJaisalmer2.pdf
Other Document • 1.00 MB
PreBidQueriesFormat.pdf
Other Document • 0.08 MB
CombinedRfSBESPABESSABESS08082025.pdf
Tender Documents • 11.93 MB
BOQ_879643.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .