Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.6 LAccepted-Finance | L1 | Accepted-Finance 1st lowest bidder | |
| 2 | L2₹14.0 L+₹39,240.72 (2.88%)Rejected-Finance HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 171002 | L2 | Rejected-Finance 2nd lowest bidder | |
| 3 | L3₹14.2 L+₹63,183.92 (4.64%)Rejected-Finance | L3 | Rejected-Finance 3rd lowest bidder | |
| 4 | L4₹14.8 L+₹1.2 L (8.71%)Rejected-Finance | L4 | Rejected-Finance 4th lowest bidder | |
| 5 | L5₹14.8 L+₹1.2 L (8.95%)Rejected-Finance BASSI UNDER BASSI POWER HOUSE DIVISION HPSEBL JOGINDER NAGAR | SHIMLA | HIMACHAL PRADESH | 171001 | L5 | Rejected-Finance 5th lowest bidder |
| Sl No | Description | Qty | Unit | Suresh Kumar L5 | DEVI CHAND THAKUR L8 | RANDHIR JAMWAL L7 | Vaibhav Sharma L6 | Mahender L4 | sumesh kumar L9 | Chandra Devi L3 | Harsh Guleria L2 | Biri SIngh L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Cutting in earth work and disposal of all surplus execavated earth upto all lead & Lift including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 94.5 | Cum | 240 ₹22,680 | 250 ₹23,625 | 180 ₹17,010 | 474 ₹44,793 | 120 ₹11,340 | 320 ₹30,240 | 150 ₹14,175 | 300 ₹28,350 | 107 ₹10,111.5 Lowest |
| 2.00 | Excavation work by machnical means( Hydraulic exczvztor/ manual means in foundation, trenches etc. in earth work in all kind of soil lifts upto 1.50 mtrs. Stacking the excavated soil not more than 3 mtrs. Clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinths sides of foundation etc. consolidating each deposited layer by ramming, watering and then disposing of all surplus excavated earth as directed upto 5KM leads | 25.2 | Cum | 400 ₹10,080 | 300 ₹7,560 | 230 ₹5,796 | 350 ₹8,820 | 152 ₹3,830.4 | 360 ₹9,072 | 350 ₹8,820 | 400 ₹10,080 | 137 ₹3,452.4 Lowest |
| 3.00 | Providing & laying cement concrete 1:5:10 (1cement: 5sand: 10graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in walls including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 6.72 | Cum | 4,400 ₹29,568 | 5,000 ₹33,600 | 3,780 ₹25,401.6 | 8,200 ₹55,104 | 5,200 ₹34,944 | 4,000 ₹26,880 | 5,500 ₹36,960 | 5,000 ₹33,600 | 3,700 ₹24,864 Lowest |
| 4.00 | Providing from work with steel plates 3.15mm thick weled with angle iron in frame 30x30x5mm so as to give a fair finish including levelling centering, shuttering strutting and propping etc. With wooden battens and ballies, hight of propping and cenring below supporting floor two ceiling and removal of the same for instu- reinforced concrete and plain concrete work in:- (a) vertical surface such as wall any thick ness partition and the like including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 268.74 | Sqm | 350 ₹94,059 | 350 ₹94,059 | 260 ₹69,872.4 | 980 ₹2,63,365.2 | 352 ₹94,596.48 | 410 ₹1,10,183.4 | 280 ₹75,247.2 | 150 ₹40,311 | 137 ₹36,817.38 Lowest |
| 5.00 | P/L cement conc. Work in retaining wall ( any thickness) i/c attached pilaster , buttresses, plinth and string course. Excluding cost of shuttering finished and reinforcement 1:1.5:3 ( 1 cement : 1.5 sand : 3 graded stone agg. 20mm ominal size) including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 84.21 | Cum | 7,200 ₹6,06,312 | 7,000 ₹5,89,470 | 6,890 ₹5,80,206.9 | 9,900 ₹8,33,679 | 5,900 ₹4,96,839 | 6,800 ₹5,72,628 | 8,500 ₹7,15,785 | 6,000 ₹5,05,260 | 5,700 ₹4,79,997 Lowest |
| 6.00 | P/L factory made chamfered edge cement conc. Paver block in footh path , parks, lawns, drive ways or light traffic parking etc. of required strength , thickness & size/ shape / make by table vibrating method using PU mould laid in required colour & pattern over 50mm thick compected bed of sand , compecting and proper embending / laying of interlocking paver blocks in to sand bedding layer through vibrating compection by using plate viubrstor filling the joits with sand and cutting of paver blocks as per required size and pattern finishing and sweeping extra sand complete all as per direction of Engineer-in-charge. 80mm thick CC paver block of M-30 grade with approved color design and pattern. | 35 | Sqm | 750 ₹26,250 Lowest | 1,100 ₹38,500 | 1,150 ₹40,250 | 1,510 ₹52,850 | 1,350 ₹47,250 | 1,441 ₹50,435 | 1,150 ₹40,250 | 900 ₹31,500 | 997 ₹34,895 |
| 7.00 | Steel work welded in built up sections, trusses and framed work, i/c cutting, hosting, fixing in position and appling a priming coat of red lead paint:- (a) In gratings framed guard bars ladders railing brackets and similar works including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 15.4 | Qtl | 7,300 ₹1,12,420 | 11,500 ₹1,77,100 | 9,680 ₹1,49,072 | 1,900 ₹29,260 | 10,800 ₹1,66,320 | 10,400 ₹1,60,160 | 180 ₹2,772 Lowest | 9,050 ₹1,39,370 | 9,700 ₹1,49,380 |
| 8.00 | P/F on wall face unplasticied Rigid PVC rain water pipe conferming to IS: 13592 Type-A i/c jointing with seal ring conferming to IS:5382 leaving 10mm gap for thermal expension, (i) single socketed pipes 110mm including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 25 | Rmt | 240 ₹6,000 | 250 ₹6,250 | 320 ₹8,000 | 1,050 ₹26,250 | 385 ₹9,625 | 260 ₹6,500 | 250 ₹6,250 | 260 ₹6,500 | 227 ₹5,675 Lowest |
| 9.00 | Providing tor steel reinforcement for RCC work including bending, binding and placing in postion complete upto floor two level including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 75.79 | Qtl | 7,150 ₹5,41,898.5 | 8,200 ₹6,21,478 | 8,450 ₹6,40,425.5 | 230 ₹17,431.7 Lowest | 7,350 ₹5,57,056.5 | 8,900 ₹6,74,531 | 6,000 ₹4,54,740 | 7,500 ₹5,68,425 | 7,700 ₹5,83,583 |
| 10.00 | Boulder filling behind retaining / breast wall including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 46.2 | Cum | 730 ₹33,726 | 850 ₹39,270 | 450 ₹20,790 Lowest | 3,600 ₹1,66,320 | 1,252 ₹57,842.4 | 1,300 ₹60,060 | 1,500 ₹69,300 | 800 ₹36,960 | 700 ₹32,340 |
Tender Value
₹15.8 L
EMD Value
₹32,000
Closing Date
18 Sept 2026, 5:00 pmClosed
Executive Engineer
HPSIDC Shimla
Repair work of the retaining wall
2026_SIDC_142529_1
Job No. 1
Open Tender
Civil Works
Item Rate
180 days
Kullu
Please refer Tender documents.
8 documents required · 8 mandatory
₹600
₹32,000
8 Oct 2026
8 Sept 2026
19 Sept 2026
8 Sept 2026
18 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cutting in earth work and disposal of all surplus execavated earth upto all lead & Lift including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 94.5 | Cum | - | - |
| 2 | Excavation work by machnical means( Hydraulic exczvztor/ manual means in foundation, trenches etc. in earth work in all kind of soil lifts upto 1.50 mtrs. Stacking the excavated soil not more than 3 mtrs. Clear from the edge of excavation and then returning the stacked soil in 15cm layers when required into plinths sides of foundation etc. consolidating each deposited layer by ramming, watering and then disposing of all surplus excavated earth as directed upto 5KM leads | 25.2 | Cum | - | - |
| 3 | Providing & laying cement concrete 1:5:10 (1cement: 5sand: 10graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in walls including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 6.72 | Cum | - | - |
| 4 | Providing from work with steel plates 3.15mm thick weled with angle iron in frame 30x30x5mm so as to give a fair finish including levelling centering, shuttering strutting and propping etc. With wooden battens and ballies, hight of propping and cenring below supporting floor two ceiling and removal of the same for instu- reinforced concrete and plain concrete work in:- (a) vertical surface such as wall any thick ness partition and the like including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 268.74 | Sqm | - | - |
| 5 | P/L cement conc. Work in retaining wall ( any thickness) i/c attached pilaster , buttresses, plinth and string course. Excluding cost of shuttering finished and reinforcement 1:1.5:3 ( 1 cement : 1.5 sand : 3 graded stone agg. 20mm ominal size) including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 84.21 | Cum | - | - |
| 6 | P/L factory made chamfered edge cement conc. Paver block in footh path , parks, lawns, drive ways or light traffic parking etc. of required strength , thickness & size/ shape / make by table vibrating method using PU mould laid in required colour & pattern over 50mm thick compected bed of sand , compecting and proper embending / laying of interlocking paver blocks in to sand bedding layer through vibrating compection by using plate viubrstor filling the joits with sand and cutting of paver blocks as per required size and pattern finishing and sweeping extra sand complete all as per direction of Engineer-in-charge. 80mm thick CC paver block of M-30 grade with approved color design and pattern. | 35 | Sqm | - | - |
| 7 | Steel work welded in built up sections, trusses and framed work, i/c cutting, hosting, fixing in position and appling a priming coat of red lead paint:- (a) In gratings framed guard bars ladders railing brackets and similar works including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 15.4 | Qtl | - | - |
| 8 | P/F on wall face unplasticied Rigid PVC rain water pipe conferming to IS: 13592 Type-A i/c jointing with seal ring conferming to IS:5382 leaving 10mm gap for thermal expension, (i) single socketed pipes 110mm including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 25 | Rmt | - | - |
| 9 | Providing tor steel reinforcement for RCC work including bending, binding and placing in postion complete upto floor two level including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 75.79 | Qtl | - | - |
| 10 | Boulder filling behind retaining / breast wall including carriage of materials through all modes of transportation with in all leads and lifts, as per PWD specifications and as per direction of the Engineer-in-charge. | 46.2 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_211786.xls
BOQ • 0.39 MB
agreement.pdf
Tender Documents • 3.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .