| 1 | L 1₹2.2 LAccepted-AOC | L 1 | Accepted-AOC L 1 | |
| 2 | L 2₹2.7 L+₹52,549.09 (24.4%)Rejected-Finance HIMACHAL PRADESH HP | KANGRA | HIMACHAL PRADESH | 176093 | L 2 | Rejected-Finance Being L 2 | |
| 3 | L 3₹2.7 L+₹53,899.87 (25.1%)Rejected-Finance HIMACHAL PRADESH HP | CHAMBA | HIMACHAL PRADESH | 176315 | L 3 | Rejected-Finance Being L 3 | |
| 4 | L 4₹2.9 L+₹71,956.52 (33.5%)Rejected-Finance | L 4 | Rejected-Finance Being L 4 | |
| 5 | L 5₹3.0 L+₹83,862.81 (39.0%)Rejected-Finance | L 5 | Rejected-Finance Being L 5 |
Tender Value
₹4 L
EMD Value
₹20,000
Closing Date
15 Dec 2021, 5:00 pmClosed
Distt Project Officer(IDP)Sirmour at Nahan
Distt Project Officer(IDP)Sirmour at Nahan
construction of Foot bridge at Sainwala in Mohalla Galwa Singh ka Pani in Ambwala-Sainwala GP.
2021_CPD1_54398_1
N-1/Foot Bridge/2021-22
Open Tender
Civil Works
Item Rate
70 days
Galwa Singh ka Pani in Ambwala-Sainwala
1. Cost of tender form in shape of DD in favour of DPO(IDP) Sirmour at Nahan for Rs 300/-
2. Bid Security in shape of FDR/CDR/TDR for Rs 20000/- in favour of DPO(IDP) Sirmour at Nahan
3 documents required · 3 mandatory
₹300
Distt Project Officer(IDP)Sirmour at Nahan
₹20,000
6 Jan 2022
7 Dec 2021
16 Dec 2021
7 Dec 2021
15 Dec 2021
7 Dec 2021
Amount
CONSTRUCTION OF PROPOSED FOOT BRIDGE AT SAIN WALA IN MOHLLA GALWA (SEEIN KA PANI) IN G.P. AMBWALA SAINWALA
Earth work in excavation by mechanicl means(Hydraulic excavator)/manual means over areas(exceeding 30 cm in dept, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 5 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kind of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level 1:4:8 (1 cement :4 coarse sand :8 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc.and removal of form for :Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Reinforced cement concrete work in walls(any thickness) including attached pillasters, bttressess, plinth and string courses,fillets, columns,pillars, piers, abutments,posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering finishing and reinforcement: 1:1.5:3(1 cement : 1.5 coarse sand) 3 graded stone aggrega 20 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 40 mm nominal size)
Extra for laying stone work in or under water and/or liquid mud i/c cost of pumping or bailling out water and removing slush etc. compiete.
Steel reinforcement for R.C.C work i/c straightening cutting, bending, placing in position and binding all complete upto plinth level. Mild steel and Medium Tensile steel bars.
P/Fixing Mild steel Railing (65x65x8mm angal)
P/Fixing 20 mm G.I. Pipe
P/Fixing sign bord
Providing primer coat & Paint on railing
P/fixing PVC Pipe 100 mm dia
JAI SINGH
Arun Kumar
Dhanbir Singh Class C Contractor
Jawant Singh
K.K.Traders
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .