Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC | ₹4.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.6 LRejected-AOC KANJIRATHUNKAL ERAVIMANGALAM P O | ₹4.6 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | K K SEBASTIAN, KK Constructions L2 | JOSEPH K K PWD CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00Detailed estimate | |||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 62.5 | sqm | 18.19 ₹1,136.88 | 17.55 ₹1,096.88 |
| 1.00 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 1 | each | 675.98 ₹675.98 | 652.32 ₹652.32 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 134.77 | cum | 257.63 ₹34,720.80 | 248.61 ₹33,505.17 |
| 1.00 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 25.36 | cum | 2,967.19 ₹75,236.07 | 2,863.34 ₹72,602.85 |
| 1.00 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 69.24 | cum | 3,993.46 ₹2.8 L | 3,853.69 ₹2.7 L |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 15.27 | sqm | 386.16 ₹5,898.21 | 372.64 ₹5,691.70 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.15 | cum | 9,235.97 ₹19,857.34 | 8,912.71 ₹19,162.33 |
| 1.01 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | 3.33 | cum | 9,760.82 ₹32,542.57 | 9,419.19 ₹31,403.58 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 150.03 | kilogram | 112.43 ₹16,867.87 | 108.5 ₹16,278.26 |
Tender Value
₹4.6 L
EMD Value
₹11,586
Closing Date
28 Jan 2026, 2:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer Irrigation Sub division Kaduthuruthy
Protecting the Left bank
2026_Irrig_828996_1
IRR/IA/TR/6793/2025_5_1_1/1
Open Tender
Civil Works - Water Works
180 days
Kaduthuruthy
Please refer tender documents
9 documents required · 9 mandatory
₹1,025
Yes
₹11,586
Yes
20 Feb 2026
19 Jan 2026
30 Jan 2026
19 Jan 2026
28 Jan 2026
19 Jan 2026
Detailed estimate
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site.
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1391823.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 6.85 MB
Tendernotice_3.pdf
PDF • 0.27 MB
Tendernotice_4.pdf
PDF • 0.02 MB
Tendernotice_5.pdf
PDF • 0.04 MB
Tendernotice_6.pdf
PDF • 0.07 MB
Tendernotice_7.pdf
PDF • 0.47 MB
BOQ_1391823.xls
BOQ • 0.30 MB