| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.5 CrAccepted-Finance 04 7906130592 | ₹6.5 Cr | L1 | Accepted-Finance Financially qualify |
| 2 | L2₹6.5 Cr+₹1.7 L (0.26%)Rejected-Finance UTTAR KASHI | UTTARAKHAND | 249128 | ₹6.5 Cr+₹1.7 L (0.26%) | L2 | Rejected-Finance Financially disqualify |
| 3 | L3₹6.5 Cr+₹2.1 L (0.32%)Rejected-Finance | ₹6.5 Cr+₹2.1 L (0.32%) | L3 | Rejected-Finance Financially disqualify |
| Sl No | Description | Qty | Unit | DEV ENTERPRISES L1 | GOUTAM ENTERPRISES L3 | HIND CONSTRUCTION L2 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 1,404.96 | Cum | 301 ₹4,22,892.96 Lowest | 302 ₹4,24,297.92 | 302 ₹4,24,297.92 |
| 2.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 717.67 | Cum | 225 ₹1,61,475.75 Lowest | 227 ₹1,62,911.09 | 227 ₹1,62,911.09 |
| 3.00 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil 1.5 Mtr to 3.0 Mtr( 1 Lift) | 295.55 | Cum | 145 ₹42,854.75 Lowest | 147 ₹43,445.85 | 147 ₹43,445.85 |
| 4.00 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : Treatment of soil under existing floors using chemical emul?sion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 366.8 | Sqm | 359 ₹1,31,681.2 Lowest | 360 ₹1,32,048 | 359 ₹1,31,681.2 Lowest |
| 5.00 | Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete. | 49.18 | Cum | 2,457 ₹1,20,835.26 Lowest | 2,463 ₹1,21,130.34 | 2,461 ₹1,21,031.98 |
| 6.00 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 84.61 | Cum | 810 ₹68,534.1 Lowest | 812 ₹68,703.32 | 812 ₹68,703.32 |
| 7.00 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 109.72 | Cum | 7,703 ₹8,45,173.16 Lowest | 7,899 ₹8,66,678.28 | 7,894 ₹8,66,129.68 |
| 8.00 | Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size). | 66.48 | Sqm | 475 ₹31,578 Lowest | 476 ₹31,644.48 | 476 ₹31,644.48 |
| 9.00 | Making plinth protection 50 mm thick of cement concrete 1:3:6 (1 cement: 3 coarse sand graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mmnominal size, well rammed and consolidated and grouted with fine sand, including finishing the top smooth. | 65.27 | Sqm | 867 ₹56,589.09 Lowest | 869 ₹56,719.63 | 868 ₹56,654.36 |
| 10.00 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified mininum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum | 369.28 | Cum | 11,004 ₹40,63,557.12 Lowest | 11,022 ₹40,70,204.16 | 11,014 ₹40,67,249.92 |
Tender Value
₹7.1 Cr
EMD Value
₹14.1 L
Closing Date
15 Jul 2026, 12:00 pmClosed
GM(T)
UKKUVB, Rudrapur
Construction work of Residential Building in Govt. PG College, Khatima (Udham Singh Nagar)
2026_UAPMB_96977_1
e-nivida-773/2026
Open Tender
Civil Works
Item Rate
540 days
Khatima (U.S. Nagar)
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
GM(T), UKKUVB, Rudrapur
₹14.1 L
31 Jul 2026
25 Jun 2026
15 Jul 2026
25 Jun 2026
15 Jul 2026
25 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 1,404.96 | Cum | - | - |
| 2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 717.67 | Cum | - | - |
| 3 | Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil 1.5 Mtr to 3.0 Mtr( 1 Lift) | 295.55 | Cum | - | - |
| 4 | Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) : Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:With Chlorpyriphos/Lindane E.C. 20% with 1% concentration | 366.8 | Sqm | - | - |
| 5 | Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete. | 49.18 | Cum | - | - |
| 6 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. | 84.61 | Cum | - | - |
| 7 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 109.72 | Cum | - | - |
| 8 | Providing and laying damp-proof course 40 mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size). | 66.48 | Sqm | - | - |
| 9 | Making plinth protection 50 mm thick of cement concrete 1:3:6 (1 cement: 3 coarse sand graded stone aggregate 20 mm nominal size) over 75mm thick bed of dry brick ballast 40 mmnominal size, well rammed and consolidated and grouted with fine sand, including finishing the top smooth. | 65.27 | Sqm | - | - |
| 10 | Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge, for the following grades of concrete.: Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the specified mininum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement.All works upto plinth level Concrete of M25 grade with minimum cement content of 330 kg /cum | 369.28 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
SBDKhatima.pdf
Tender Documents • 1.15 MB
BOQ_114545.xls
BOQ • 0.45 MB
cordt.pdf
PDF • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .