| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.7 LAccepted-Finance | 1 | Accepted-Finance L1 | |
| 2 | 2₹19.0 L+₹28,410.88 (1.52%)Rejected-Finance | 2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | HI-STAR BUILDERS L2 | L PALANICHAMY L1 |
|---|---|---|---|---|---|
| 1.00 | Construction of 30,000 Litre Capacity OHT at Uthamarseeli in Uthamarseeli Panchayat in Andhanallur Block Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B etc., for 0-2.00m Depth | 60.5 | Cum | 230 ₹13,915 | 224 ₹13,552 Lowest |
| 2.00 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B etc., above 2.00m Depth | 13.61 | Cum | 240 ₹3,266.4 | 237.6 ₹3,233.74 Lowest |
| 3.00 | Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete. | 9.08 | Cum | 1,735 ₹15,753.8 | 1,725.4 ₹15,666.63 Lowest |
| 4.00 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete. | 4.54 | Cum | 5,150 ₹23,381 | 5,118.5 ₹23,237.99 Lowest |
| 5.00 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for BELOW GL | 10.4 | Sqm | 490 ₹5,096 | 476 ₹4,950.4 Lowest |
| 6.00 | Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete. | 1.47 | MT | 89,050 ₹1,30,725.4 | 89,030 ₹1,30,696.04 Lowest |
| 7.00 | RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for MAT CONCRETE | 13.52 | Cum | 8,900 ₹1,20,328 | 8,893 ₹1,20,233.36 Lowest |
| 8.00 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for BELOW GL | 6.96 | Sqm | 490 ₹3,410.4 | 476 ₹3,312.96 Lowest |
| 9.00 | RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for COLUMN UPTO GL | 0.52 | Cum | 8,900 ₹4,628 | 8,893 ₹4,624.36 Lowest |
| 10.00 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B etc., for 0-2.00m Depth | 0.94 | Cum | 230 ₹216.2 | 224 ₹210.56 Lowest |
Tender Value
₹19 L
EMD Value
₹19,000
Closing Date
30 Oct 2025, 3:00 pmClosed
BDOAndhanallur
BDO Andhanallur
Construction of 30,000 Litre Capacity OHT at Uthamarseeli in Uthamarseeli Panchayat in Andhanallur Block
2025_RDTN_616750_1
B7/3134/2025
Open Tender
Civil Works - Others
Item Rate
90 days
Andhanallur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹19,000
Yes
8 Nov 2025
25 Oct 2025
30 Oct 2025
25 Oct 2025
30 Oct 2025
25 Oct 2025
Construction of 30,000 Litre Capacity OHT at Uthamarseeli in Uthamarseeli Panchayat in Andhanallur Block Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B etc., for 0-2.00m Depth
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B etc., above 2.00m Depth
Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for BELOW GL
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete.
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for MAT CONCRETE
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for BELOW GL
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for COLUMN UPTO GL
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B etc., for 0-2.00m Depth
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for ABOVE GL
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete.
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for GL Brace Beam and Landing Slab
Refilling the foundation with excavated earth including watering and consolidation etc., complete.
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for 0-2.72M Ht
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for 0-2.72M ht
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for 2.72-3.02M Ht
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete.
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for 2.72-3.02M ht
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for Square Column 3.02-3.30M Ht
For Square Column 3.30-4.30M Ht
For Square Column 4.30-5.30M Ht
For Square Column 5.30-5.74M Ht
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for Square Column 3.02-4.50M ht
For Square Column 4.50-5.74M ht
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for Second Brace Beam 5.74-6.04M Ht
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete.
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for Second Brace Beam 5.74-6.04M Ht
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for Square Column 6.04-6.30M Ht
For Square Column 6.30-7.30M Ht
For Square Column 7.30-8.30M Ht
For Square Column 8.30-8.76M Ht
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for Square Column 6.04-8.76M ht
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for Third Brace Beam and Landing Slab 8.76-9.06M Ht
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete.
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for Third Brace Beam 8.76-9.00M Ht
For Third Brace Beam 9.00-9.06M Ht
For Landing Beam 8.76-9.00M Ht
For Landing Slab 9.00-9.06M Ht
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for Square Column 9.06-9.30M Ht
For Square Column 9.30-10.30M Ht
For Square Column 10.30-11.30M Ht
For Square Column 11.30-11.31M Ht
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for Square Column 9.06-11.31M Ht
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for floor Beam 11.31-11.61M Ht
For Floor Slab Curved Surface at 11.61M Ht
For Floor Slab Curved Surface at 11.61-11.85M Ht
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete.
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for Square Column 11.31-11.85M Ht
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for curved surface 11.85-12.30M Ht
For curved surface 12.30-13.30M Ht
For curved surface 13.30-14.30M Ht
For curved surface 14.30-14.75M Ht
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for Haunch 11.85-13.50M Ht
For Side Wall 13.50-14.75M Ht
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for Cover Slab at 14.75M Ht
For Cover Slab 14.75-14.93M Ht
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete.
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for Cover Slab 14.75-14.93M Ht
Providing PVC ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes and cowl etc., complete.,
Providing manhole cover of size 0.60 m X 0.60 m in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges etc., complete.,
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc., to required height and clear width of 4Scm consisting of two Nos. of ve~ical post of 10cm x lScm and step slab of 25mm x 25mm etc., complete.
Providing cut stone slab in CM 1:3 etc., complete.,(.45x.45x.15)
Distempering the wall with one coat using primer over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete.
65mm dia GI pipes for inlet connection
65mm dia GI pipes for over flow and RWH
65mm dia GI pipes for delivery pipe.1
65mm dia GI pipes for delivery pipe.2
65mm dia GI pipes for scour pipe.
90mm dia PVC FTA
63mm dia PVC FTA
65mm dia GI Tee
65mm dia GI Coupler
65mm dia GI flange
65mm dia GI Elbow
75 X 63mm dia PVC Reducer
75 X 90 mm dia PVC Reducer
65mm dia GM Gate Valve
75mm PVC FTA
63mmPVC pipe 4ksc
63mm PVCbend
63mm PVC tee
63mm PVC endcap
Solution paste
65mm Gate valve
Earth work excavation in hard stiff clay block cotton ,red earth shales, murram 50% fair sized boulders etc., and depositing on bank with intial lead and lift and
Provisionfor Fencing arrangements
Provisionfor Cartoon painting arrangements
Provision for Name Board
Provision for Photo charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
BOQ_737571.xls
BOQ • 0.37 MB
Techbidoht.pdf
Additional Documents • 0.63 MB
Pricebitoht.pdf
Tender Documents • 0.64 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .