| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-AOC | ₹6.4 L | L1 | Accepted-AOC estimate rate |
| 2 | L2₹7.7 Cr+₹7.6 Cr (11900.0%)Rejected-Finance | ₹7.7 Cr+₹7.6 Cr (11900.0%) | L2 | Rejected-Finance Above estimate rate |
| Sl No | Description | Qty | Unit | Saju M J L1 | JAISON JAMES L2 |
|---|---|---|---|---|---|
| 1.00 | Quoted Amount of BOQ1 in figures | 1 | Nos | 0 ₹6,37,981.16 Lowest | 20 ₹7,65,577.39 |
| 2.00 | GST Rate in percentage | 1 | Nos | 18 ₹1,14,836.61 Lowest | - |
Tender Value
₹6.4 L
EMD Value
₹16,000
Closing Date
29 Jul 2026, 3:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer, Electrical , Sub Division, Vazhathoppe, Idukki 685602
LT Reconductoring work under Melechinnar Under ES Murikkassery
2026_KSEB_860586_1
AEE,ESD-VZPE/T-19/2026-27 dated 14.07.2026
Open Tender
Electrical Works
Percentage
120 days
Melechinnar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,300
₹16,000
5 Aug 2026
14 Jul 2026
30 Jul 2026
15 Jul 2026
29 Jul 2026
15 Jul 2026
15 Jul 2026 - 25 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Additional rate for
excavation of one Pit for HT
Pole/HT Stay in Soft Rock. | 2 | No | 1,303.68 | ₹2,607.36 |
| 2 | Additional rate for
excavation of one Pit for HT
Pole/HT Stay in Rock. | 2 | No | 2,606.32 | ₹5,212.64 |
| 3 | Labour charges for loading
HT A type pole from the
stacking place and unloading
the same at work site
(transportation by any
vehicle). | 4 | No | 906.41 | ₹3,625.64 |
| 4 | Insertion of one HT A type
pole in existing OH line
including digging &
backfilling pit in ordinary
soil, fitting cross arm,
insulators, binding etc.,
drawing sufficient length of
GI earth leads to the ground
for earthing (excluding
provision of earthing) | 4 | No | 4,302.05 | ₹17,208.2 |
| 5 | Additional rate for
excavation of Pit for A type
pole in Laterite. | 1 | No | 651.32 | ₹651.32 |
| 6 | Additional rate for
excavation of Pit for A type
pole in Hard Laterite | 1 | No | 1,303.68 | ₹1,303.68 |
| 7 | Additional rate for
excavation of Pit for A type
pole in Soft Rock | 1 | No | 1,955 | ₹1,955 |
| 8 | Providing Stay for LT poles
including digging & back
filling pit in ordinary soil | 40 | No | 938.82 | ₹37,552.8 |
| 9 | Renewal of existing
damaged/broken old LT stay
in existing stay rod. | 20 | No | 434.91 | ₹8,698.2 |
| 10 | Additional rate for
excavation of one Pit for LT
Pole/LT Stay in Laterite | 67 | No | 217.45 | ₹14,569.15 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.12 MB
GCC.pdf
Tender Documents • 0.51 MB
SpecialConditions.pdf
Other Document • 0.13 MB
GeneralTermsAndConditions.pdf
Additional Documents • 0.17 MB
BOQ_1455289.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .