| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.6 CrAccepted-AOC | ₹1.6 Cr Quoted ₹1.9 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹1.9 CrRejected-AOC | ₹1.9 Cr | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | GJANARDHANAN L1 | BHARATHAN P L2 |
|---|---|---|---|---|---|
| 1.00Appendix A- Reactive Maintenance(Initial Rectification Work) | |||||
| 1.00 | 55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a) | 17.36 | cum | 3,307.64 ₹57,420.63 | 3,439.94 ₹59,717.36 |
| 1.00 | 55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement. | 97.5 | cum | 3,198.4 ₹3.1 L | 3,326.34 ₹3.2 L |
| 1.00 | 55.6.a:Providing pre mix bitumen leveling coarse having thickness between 20mm and 40mm with 12mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen (vg 30) with pressure sprayer at the rate of 48 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores. | 17.36 | cum | 11,780.36 ₹2.0 L | 12,251.58 ₹2.1 L |
| 1.00 | 55.7.a:Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores. | 97.5 | cum | 3,841.13 ₹3.7 L | 3,994.77 ₹3.9 L |
| 1.00 | 5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 16,225 | sqm | 15.46 ₹2.5 L | 16.08 ₹2.6 L |
| 1.01 | OD316622/2025-2026:Providing , laying and rolling of close-graded premix surfacing material of 20mm thickness composed of 11.2 mm to 0.09 mm (Type A) viscosity of grade bitumen (VG-30) to the required line, grade and level to serve as wearing course on apreviously prepared base, including mixing in a suitable HMP of appropriate capacity not less than 8 tonnes/hour, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, and furnishing to required level and grade (without paver) | 16,225 | sqm | 360.11 ₹58.4 L | 374.52 ₹60.8 L |
| 1.01 | OD316359/2025-2026:Providing and fixing of DLP board for Running contract work with Non-reflectorized Vinyl sign with 1 years warranty manufactured Vinyl Printed sheeting fixed over aluminum sheeting 2 mm thick/ aluminium composite material sheeting 4 rum thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 5Oinm NB confirming to IS 123.9 firmly fixed to the ground by means of properly designed foundation with M 1ñ grade cement concrete min size 45 cm x 4ñ cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. | 2.16 | sqm | 7,812.24 ₹16,874.44 | 8,124.73 ₹17,549.42 |
| 1.01 | OD316360/2025-2026:Removing the old existing vinyl sticker works on the display board of Running contract and replacing with new vinyl sticker, including lettering symbols and transporting to site etc. as per the approved drawing and direction of the Engineer in Charge | 26 | each | 1,215.64 ₹31,606.64 | 1,264.26 ₹32,870.76 |
| 1.01 | OD316358/2025-2026:Conducting and reporting routine inspections for the entire length of the project road at a frequency of 7 days through out the agreement period of the running contractors directed by the departmental officer at site. Additional RI may be required in response to reports of complaints from the police, other authorities and the public as a result of major incidents, typhoon or flooding damages etc and are not measurable/payable. A proportion of the RI should be carried out either during or immediately following a period of we weather. | 3,117.62 | km | 58.43 ₹1.8 L | 60.76 ₹1.9 L |
Tender Value
₹1.5 Cr
EMD Value
₹50,000
Closing Date
5 Mar 2026, 2:00 pmClosed
Superintending Engineer, PWD Roads NC
O/o The Superintending Engineer, PWD Roads North Circle, Kozhikode
One Year Running Contract for Various PWD Roads under Roads section Kuzhalmannam in Palakkad district 13 road stretches for a length of 59.79 km
2026_PWD_840625_1
PWD/RB/TR/16599/2025_5_1_1/RC 1/1
Open Tender
Civil Works - Roads
365 days
Palakkad
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,515
Yes
₹50,000
Yes
1 Apr 2026
25 Feb 2026
7 Mar 2026
25 Feb 2026
5 Mar 2026
25 Feb 2026
Appendix A- Reactive Maintenance(Initial Rectification Work)
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.6.a:Providing pre mix bitumen leveling coarse having thickness between 20mm and 40mm with 12mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen (vg 30) with pressure sprayer at the rate of 48 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.
55.7.a:Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD316622/2025-2026:Providing , laying and rolling of close-graded premix surfacing material of 20mm thickness composed of 11.2 mm to 0.09 mm (Type A) viscosity of grade bitumen (VG-30) to the required line, grade and level to serve as wearing course on apreviously prepared base, including mixing in a suitable HMP of appropriate capacity not less than 8 tonnes/hour, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, and furnishing to required level and grade (without paver)
OD316359/2025-2026:Providing and fixing of DLP board for Running contract work with Non-reflectorized Vinyl sign with 1 years warranty manufactured Vinyl Printed sheeting fixed over aluminum sheeting 2 mm thick/ aluminium composite material sheeting 4 rum thick with area not exceeding 0.9 sqm, with suitable back supporting frame of MS angle 40x40x6 and supported on GI pipe pole 5Oinm NB confirming to IS 123.9 firmly fixed to the ground by means of properly designed foundation with M 1ñ grade cement concrete min size 45 cm x 4ñ cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc.
OD316360/2025-2026:Removing the old existing vinyl sticker works on the display board of Running contract and replacing with new vinyl sticker, including lettering symbols and transporting to site etc. as per the approved drawing and direction of the Engineer in Charge
OD316358/2025-2026:Conducting and reporting routine inspections for the entire length of the project road at a frequency of 7 days through out the agreement period of the running contractors directed by the departmental officer at site. Additional RI may be required in response to reports of complaints from the police, other authorities and the public as a result of major incidents, typhoon or flooding damages etc and are not measurable/payable. A proportion of the RI should be carried out either during or immediately following a period of we weather.
Appendix B- Premonsoon Works
2.2:Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area
3.11:Removal of unserviceable soil including excavation, loading and disposal upto 1000 metres lead but excluding replacement by suitable soil which shall be paid separately as per clause 305.
55.15:Refurbishment of existing signboardsRefurbishment of existing signboards of all size except gantry mounted ones to their original reflectivity & position by removing obstructions like overgrowth vegitation etc ,if any,washing the signboards with water & soap solution to remove all dirt, oil etc. , correcting any dislocations including minor repairs, replacement of lost nut and bolts etc complete.
OD316357/2025-2026:Lifting the existing precast RCC covering slabs from drain and culvert for removal of silt and placing the same slab on position after completion of clearing work including all labour charges and miscellaneous expenses etc. complete
OD316356/2025-2026:Engaging Hydraulic Excavator (3D) with driver and fuel for cutting,clearing drain and other miscellaneous activity etc complete
OD316354/2025-2026:Hire charges of Tipper including operation charges and fuel charges for cleaning and removing dumped stones waste materials etc as per the direction of departmental officers at site etc. complete
OD316353/2025-2026:Chainsaw with motor including Fuel/Oil for wood cutting
OD316355/2025-2026:Engaging Skilled Mazdoor (Scavenger,Wood cutting)clearing blocked culvert and Drain,cutting branches of tree and vegetation,remove and rearrange cover slab etc works.
OD316352/2025-2026:Engaging Man Mazdoor for Assist Skilled Mazdoor and other rectification works as directed by Departmental officers etc.
Appendix C- Proactive /Preventive Maintenance
5.11.b:Providing and laying slurry seal consisting of a mixture of fine aggregates, portland cement filler, bituminous emulsion (SS) and water on a road surface including cleaning of the surface, mixing of slurry seal in a suitable mobile plant, laying and compacting to provide even riding surface. Type - II - (4 6 mm thickness) Filling of surface cracks 1 - 3 mm and preventive / renewal treatments.
10.2:Maintenance of Earthen Shoulder (filling with fresh soil) Making up the loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compacting it with appropriate equipment.
10.6:Filling of crack using slow - curing bitumen emulsion and applying crusher dust in case crack are wider than 3mm.
OD316351/2025-2026:Filling up potholes with bituminous ready mix compound (25kg) and compacting by ramming to get a compact surface including of cost of material, laying charges, transportation to site etc complete Rate is arrived for a bag of 25kg
55.2:Supplying and stacking 12mm hard blue granite broken stone in standard heaps for measurement(IRC 3.2.1.a)
55.4:Supplying and stacking 36mm size hard broken stone in standard heaps for measurement.
55.6.a:Providing pre mix bitumen leveling coarse having thickness between 20mm and 40mm with 12mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen (vg 30) with pressure sprayer at the rate of 48 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.
55.7.a:Providing bitumen leveling coarse between 40mm and 150mm with 36mm deptl metal by spreading the metal to line and levels and rolling until the compacted coarse aggregate has a firm surface and applying hot bitumen with pressure sprayer at the rate of 20 Kg per M3 metal including all cost of bitumen conveyance heating mixing spreading in appropriate locations to proper levels compacting with power roler and other sundry stores.
5.2.a:Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
OD317527/2025-2026:Providing , laying and rolling of close-graded premix surfacing material of 20mm thickness composed of 11.2 mm to 0.09 mm (Type A) viscosity of grade bitumen (VG-30) to the required line, grade and level to serve as wearing course on apreviously prepared base, including mixing in a suitable HMP of appropriate capacity not less than 8 tonnes/hour, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, and furnishing to required level and grade (without paver)
10.5.1b:Removal of all failed material, trimming of completed excavation to provide firm vertical faces, cleaning of surface, painting of tack coat on the sides and base of excavation as per clause 503, back filling the pot holes with hot bituminous material as per clause 504, compacting trimming and finishing the surface to from a smooth continuous surface, all as per clause 3004. 2 Filling Port holes and Patch Repairs with Bituminous concrete For grading II- 13 mm (Nominal size) Material
12.1.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil - Depth upto 3 m - Manual Means
12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15
12.40:Supply, Fitting and Placing un- coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications
12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer
8.13:Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads on Bituminous Surface @ 250 gms per sqm area, the thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform, and free from streaks and holes.
8.15:Supplying and installation of delineator (Roadway indicators) posts 80- 100cm high above ground level, pained black, and white in 15 cm wide strips, fitted with min. 80 x 100 mm rectangular or 75 mm dia circular retro reflectorized panels at the top with minimum visibility of 300m with provisions to prevent edge lifting and vandalisam, and conforming to clause 806 , IRC-79 and the drawings including fixing to ground (The deleniator shall be of approved type as per specification)
8.35:Providing and fixing reflective road studs (Raised Pavement Marker) of ' category A' made out of ASA/HIPS/ABS moulded body with shanks and conforming to ASTM D 4280, strong enough to support a load of more than 13.635 T when tested in accordance with ASTM D 4280, reflective panel confirming to ASTM D 788, and reflectivity conforming to clause 804.4. including installation, drilling, fixing with adhesive etc. with 2 years warranty for the road stud as well as for in field performance as per clause 804.7.3 Road Markers/Road Stud with Lense Reflector :-
8.4.2:Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign with 7years warranty manufactured as per IRC :67 made of Type IV micro prismatic grade sheeting vide clause 801.3.3 fixed over aluminium sheeting, 2 mm thick/ aluminium composit material sheeting 4 mm thick with suitable back supporting frame of MS angle 25x25x3 and supported on GI pipe pole 50mm NB confirming to IS 1239 firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete min size 45 cm x 45 cm x 60 cm, 60 cm below ground level including painting all exposed surface with 2 coats of epoxy painting over epoxy primer and as per approved drawing and clause 801 including lettering symbols etc. 60 cm equilateral triangle
Appendix D- Emergency Works
10.12:Clearance of land slides in soil and ordinary rock by a bull-dozer D 80 A-12, 180 HP and disposal of the same on the valley side
4.12:Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
kuzhalrsbd.pdf
Tender Documents • 1.64 MB
BOQ_1417161.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid