| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹4.5 L+₹20,658.76 (4.85%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹4.9 L
EMD Value
₹7,364
Closing Date
28 Dec 2021, 10:00 amClosed
Assistant Executive Engineer
Assistant Executive Engineer PWD Buildings sub Division Munnar Pin Code 685612
GENERAL Construction of Compound Wall in Sub Collector Bungalow a Devikulam Work General Civil Work
2021_PWD_462369_1
PWD BLDG TR 105236 2021 51 1 1
Open Tender
Civil Works - Buildings
Item Rate
180 days
Devikulam
Please refer Tender documents.
11 documents required · 11 mandatory
₹1,085
Yes
₹7,364
Yes
16 Feb 2022
22 Dec 2021
30 Dec 2021
22 Dec 2021
28 Dec 2021
22 Dec 2021
Amount
Civil
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
13.1.2:12 mm cement plaster of mix:1:6 (1 cement : 6 fine sand).
10.2:Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
16.18.1:Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 metres (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for serarately) :- Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire
50.6.1.6:Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for super structure above floor two level upto floor five level thickness 20cm and above in : CM 1:6 ( 1 cement : 6 coarse sand sand) etc complete
RENJITH S
Bidder Name
RENJITH S
Melvin Roy
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_661654.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .